e suuo SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S Street. Box 15830. Sacramento, California 95813; (916) 452-3211 October 24, 1980 Mr. Philip Polk, Project Manager Operating Reactors Branch #2 Division of Licensing Nuclear Regulatory Commission Washington, D. C.
20:i55 Docket No. 50-312 Rancho Seco Nuclear Generating Station, Unit No.1 Sir:
The information requested by you on October 23,1980, is attached. Stated in the reply are the results of the tests requested by the February 23, 1980 letter. The District considers the test which is conducted during each thermal heatup from cold shutdown as verification of proper integrity of the valve internals.
Three leak tests have been conducted and each measurement indicated zero leakage through the boundary valves. Although Rancho Seco has the valve configuration of concern, the piping arrangement to the Core Flood Tanks will provide prompt indication if degradation of the check valves occurs.
Questions concerning this response should be directed to R. Colombo on my staff at Rancho Seco.
Sincerely, k blL J. J. Mattimoe Assistant General Manager
/l and Chief Engineer h,00/
Attachirint I\\
A1 ELECTRIC SYSTEM S E R '.'! N 3 MORE THLN 500.000 IN THE HEART OF calif 0R.N64 8010280 L4
o ATTACliMENT "A" Question RCS-001 RCS-002 DHS-015 D615-016 SFV-26005 SFV-26006 1.
A.
Manuf.
Velan Velan Velan Velan Velan Velan B.
Model #
B19-311PS-13MS B19-311PS-13MS B16-38PS-13MS B16-38PS-13MS B16-3548-13MS B16-354B-13MS C.
Type Swing Check Swing Check Stop Check Stop Check Gate Gate 2.
Visual 11/9/76 3/20/80 6/20/74 6/25/74 Internal Internal Internal Internal Internal Exam Cleanliness Cleanliness Cleanliness Cleanliness Satis factory Satis factory Satis factory Satisfactory III III
$II II) 3.
liydro Test 9/2/80 9/2/80 9/2/80 9/2/80 No seat leakage No seat leakage No seat Leakage No seat leakage 52) 8/13/80(2) 6/13/80 8/13/80 I2)
I2I 4.
ISI/IST 8/13/80 Sa tis factory Satisfactory Satisfactory Satis factory 5.
MOV configuration is closed.
6.
MOV ISI/IST -- Full stroke tested quarterly (3) 7.
RCS pressure would cause CFT pressure and level to increase. Tiiese paraneters are remotely alarned in the control room. For further information, see Walbridge to Eisenhut letter J March 12, 1980.
8.
No.
Only bonnet seal rework has been necessary on RCS-001 and RCS-002, 9.
No. However, permanent piping is planned to reduce personnel exposure and improve industrial safety.
- 10. There is' remote pressure indication beyond the :;econd valve as noted in item 7.
- 11. May 1981.
Footnotes:
per SP-203.ll (3) per SP-203.08 per SP-203.05A and SP-203.05B