ML19338G028
| ML19338G028 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 10/21/1980 |
| From: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19338G029 | List: |
| References | |
| IEB-80-14, TAC-42227, TAC-47003, TAC-47004, NUDOCS 8010280327 | |
| Download: ML19338G028 (3) | |
Text
_
6 W
GENERAL OFFICE Nebraska Public Power District
" fe"e%2U"ME^P" *"
October 21, 1980 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Eisenhut:
Subject:
IE Bulletin 80 Degradation of BWR Scram Discharge Volume Capability Proposed Technical Specifications Cooper Nuclear Station NRC Docket No. 50-298, DPR-46
Reference:
(1) Letter, dated July 7,
- 1980, from D. G. Eisenhut to all Operators of Boiling Water Reactors, same subject.
(2) Letter, dated July 22,
- 1980, from D. G. Eisenhut, to all Operators of Boiling Water Reactors, same subject.
In accordance with the guidance and model technical specifications provided in Reference 1, Nebraska Public Power District requests that the Cooper Nuclear Station Technical Specifications be modified as indicated on the enclosed revised pages. Revisions are marked by a vertical bar in the margin.
The following addresses each of the three items required by Reference 1 and either enumerates where this item is provided for by the present Technical Specifications or on which revised page it has been added.
1.
SDV Vent and Drain Valve Surveillance The surveillance requirement for the SDV vent and drain valves is specified on revised page 98. The bases section for this requirement is covered on revised page 105.
2.
Control Rod Block SDV Limit Switches Table 3.2.C.
(page 61) has - been revised to reflect the addition of a Control Rod Block from the Scram Discharge Volume. Table 4.2.C. (page 77) has also been revised to i
reflect the surveillance requirement.
Page 86 has been revised to include the bases for this particular rod block.
8 010 2gg YY
i Mr. Darrell G. Eisenhut October 21, 1980 Page Two 3.
RPS/SDV Limit Switches The requirements for the operability of the SDV High Water Level Scram are presently addressed in Table 3.1.1 (page 28).
Likewise, the surveillance requirements are i
covered in Table 4.1.1. (page 33).
In the event that additional Technical Specification changes are required with respect to the dictated subject, these changes will be submitted as addenda to this document.
In accordance with reference 2, payment in the amount of l
$4,000.00 is enclosed.
Should you have any questions or require further clarification, i
please contact me.
In addition to three signed originals, 37 copies are also submitted for your use.
Sincerely, lR 4
. Pilant Director of Licensing & Quality Assurance i
JMP/kcyc:rs20/15 Enclosure I
cc:
NRC Distribution 4
e 5
I i
Mr. Darrell G. Eisenhut October 21, 1980 Page Three STATE OF NEBRASKA)
)ss PLATTE COUNTY
)
Jay M. Pliant, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this information on behalf on Nebraska Public Power District; and that the statements in said application are true to the best of his knowledge and belief.
M WM.' Pilant d
subscribed in my presence and sworn to before me this c7/ day of
$lb4th /982 MiY
/ NOTARY PUBLIGf My Commission expires
. /h /$f[/
t4R.H h
Ag NOTARY m
- f COMMfSSION:W EXPIRE 3 i,
Ydh..!.t.8'@
N,ggte
_, +
y,_
y c..
g-f 7,,
,y--
y-,
,