IE Insp Repts 50-440/80-21 & 50-441/80-19 on 800930-1002. No Noncompliance Noted.Major Areas Inspected:Licensee Action on Previous Item of Noncompliance,Response to IE Bulletins & Circulars & Ongoing Site Const Activities
ML19338F938
Person / Time
Site: Perry  
Issue date: 10/14/1980
From: Houston M, Konklin J, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19338F934 List:
References
50-440-80-21, 50-441-80-19, NUDOCS 8010280058
Download: ML19338F938 (4)


See also: IR 05000440/1980021

Text

-.

.

.

.. -.

--

\\

.

o

U.S. NUCLEAR REGULATORY COFDlISSION

-

OFFICE OF INSPECTION AND ENFORCEMENT

'

'

REGION III

Reports No. 50-440/80-21; 50-441/80-19

Docket Nos. 50-440; 50-441

Licenses No. CPPR-148; CPPF-149

Licensee: The Cleveland Electric Illuminating

Company

Post Office Box 5000

Cleveland, OH 44101

Facility Name:

Perry Nuclear Power Plant, Units 1 and 2

Inspection At:

Perry Site, Perry, Oli

Inspection Conducted: September 30 - October 2, 1980

_Id/fN,TS

Inspector:

J. E. Konklin

-

,

Accompanying Personnel:

M. D. Ilouston, NRC-HQ

(October 1, 1980 only)

./ KK-

Approved By:

C.

. Willi @ , Chief

ld/II/j/'2)

2

Projects Section 2

'

'

Inspection Summary

Inspection on September 30 - October 2, 1980 (Report No. 50-440/80-21;

50-441/80-19)

Areas Inspected: Management meeting at CEI Corporate Offices; licensee

action on previous item of noncompliance; licensee actions in response to

IE Bulletins and Circulars; ongoing site construction activities.

This

inspection involved a total of 20 inspector-hours by one NRC inspector,

both at the site and at the licensee's corporate offices.

Results: No items of noncompliance or deviations were identified.

8010280 OET

s

c

,

5

DETAILS

,

Persons contacted

Principal Licensee Employees

+D. Davidson, Vice President, System Engineering and Construction

i

'

+ G. Groscup, Manager, Nuclear Engineering Department

i

+*M. Edelman, Manager, Nuclear QA Department

!

  • P. Martin, General Supervising Engineer, PQS
  • J. Kline, General Supervising Engineer, Construction

l

  • F. Leidich, Construction QE Supervisor

.

S. Tulk, CQS Lead Electrical QE

l

E. Buzzelli, Assistant Licensing Administrator

'

M. Combs, CQS Engineering Aide

Region III Management (October 1 management meeting only)

"

i

+J. Keppler, Director Region III

+G. Fiore111, Chief, Reactor Construction and Engineering Support 3 ranch

+C. Williams, Chief, Reactor Projects Section 2

uther NRC Personnel

+ M. Houston, Perry Project Manager, NRR

+*J. Konklin, Perry Project Inspector, RIII

J. Hughes, Perry Resident Inspector, RIII

The inspector also contacted other licensee and contractor personnel.

!

  • Denotes those attending the site exit interview on October 2, 1980.

+ Denotes those attending the management meeting at CEI HQ in Cleveland on

j

October 1, 1980.

!

j

Licensee Action on Previous Inspection Findings

i

~

(Closed) Noncompliance (50-440/80-09-01; 50-441/80-09-01) Inadequate require-

ments for N-2 nozzle modification activities. During this inspection, the

j

inspector reviewed the following documents related to the obtaining by CEI

of acceptance criteria for N-2 nozzle wall thickness.

j

1

'

a.

CEI Action Request AR-238, dated June 12, 1980, to GE requesting

acceptance criteria for minimum wall thickness for the N-2 nozzles,

with the GE response which failed to provide appropriate acceptance

criteria.

'

b.

CEI letter to GE, dated June 24, 1980, which stated that the GE

response to AR-238 was unacceptable.

l

-2-

.

.

.

.

,..

_ - . - .

,_

_

_

- - .-,-

r

,

.

o

c.

GE letter to CEI, datea 'uly 17, 1980, which provides " clarification"

.

of the GE response to AR-238.

d..

CEl letter to GE, dated July 18, 1980, which states that the GE response

is still unacceptable.

e.

GE letter to CEI, dated July 29, 1980, which provides appropriate

acceptance criteria for minimum wall thickness for the N-2 nozzles.

The inspector then reviewed the actual wall thickness measurements on

the twenty N-2 nozzles and discussed with the licensee the comparisons

of the measured wall thicknesses vs. the GE acceptance criteria. The

inspector concluded tha. the licensee has taken appropriate corrective

actions with regard to the above items of noncompliance.

Functional or Prcgram Areas Inspected

1.

Management Meeting and Site Tour

A meeting was held on October 1, 1980, at the CEI corporate offices

in Cleveland, Ohio, among CEI corporate management and RIII management

(denoted under Persons Contacted).

Included in the meeting were a re-

view of the licensee's performance on the Perry Project and discussions

of specific areas of interest relating to future Perry work activities.

A more detaileo discussion of the meeting is contained in RIII Report

(50-440/80-24; 50-441/80-22).

Following the management meeting, the inspector and the NRC-HQ Perry

Project Manager made a tour of the Perry site.

Included in the tour

was the observation of equipment status and work activities in the

Units 1 and 2 containment buildings, the Units 1 and 2 auxiliary

buildings, the intermediate building, the control complex, and the

fuel handling building.

No items of noncompliance were identified.

2.

Licensee Actions Relative to IE Bulletins and Circulars

The inspector reviewed the licensee's actions relative to selected IE

Bulletins and IE Circulars, to determine whether distribution was made

to the appropriate review groups, whether adequate evaluations were

performed and, where applicable, whether timely and appropriate respohses

were made to NRC.

Licensee actions with regard to the following IE Bulletins and Circulars

were evaluated and found to be adequate. These bulletins and circulars

are considered to be closed:

a.

IE Bulletin No. 79-17.

-3-

-

..

._

..

_ . _ .

_

_

. . _ . .

__

. - -

_.

'.

s

t

' -

b.

IE Bulletin No. 79-17, Revision 1.

IE Bulletin No. 80-02.

..c.

.

d.

IE Bulletin No. 80-07.

e.

IE Bulletin No. 80-07, Supplement 1.

,

f.

IE Bulletin No. 80-13.

't

g.

IE Bulletin No. 80-17.

h.

IE Bulletin No. 80-17, Supplement 1.

i.

IE Bulletin No. 80-17, Supplement 2.

j.

IE Bulletin No. 80-19.

k.

IE Bulletin No. 80-19, Revision 1.

1.

IE Bulletin No. 80-20.

m.

IE Circular No. 79-04.

n.

IE Circular No. 79-07.

o.

IE Circular No. 79-12.

_

p.

IE Circular No. 79-18.

.

q.

IE Circular No. 79-22.

r.

-IE Circular No. 80-05.

I

s.

IE Circular No. 80-14.

t.

IE Circular No. 80-16.

No items of noncompliance were identified.

Exit Interview

The inspector met with licensee representatives (denoted under Persons

Contacted) at the conclusion of the inspection on October 2, 1980. The

inspector summarized the purpose and findings of the inspection.