. [) ).eaeo g' g UNITED STATES y
ec; g NUCLEAR REGULATORY COMMISSION
, e \\ %L E REGION IV o, h,
611 RYAN PLAZA oRIVE, SUITE 1000 8
O ; -
,o 7
. RUNGToN, TEXAS 76012 28 aus 1980 Docket No. 99900242/80-01 Pittsburgh - Des Moines Steel Company Western Division Attn:
Mr. D. R. Johnston Quality Assurance Manager Post Office Box 1447 Provo, Utah 84601 Gentlemsn:
This refers to che QA Program inspection conducted by Mr. J. W. Sutton of this office on July 28 - August 1,1980, of your facility at Provo, Utah, associated with the fabrication of :ontainment vessels and components and to the discussions of cur findings with N. L. Allred, Production Manager and you and members of your staff at the conclusion of the inspection.
This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality.
As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.
ou should therefore not conclude that the NRC's inspection exempts you from
,>ections by an NRC licensee or his agents nor from taking effective cor-rective action in response to their findings.
Areas eynmined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During the inspec':1on it was found that the implementation of your QA Program failed to meet certain NRC requirements.
The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.
8010270. SQ
Pittsbtrgh - Des Moines Steel Company 2
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
.Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Commission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the informa-tion is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear fran you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, up
]L, Uldis Potapovs, Chipf Vendor Inspection Branch Enclosures.
1.
Notic2 of Deviation 2.
Inspection Report No. 99900242/80-01 l
l
. -.