Responds to 800912 Request for Permission to Perform eddy-current Insp on Several Hot Leg Steam Generator Tubes. Insp May Be Scheduled During Nov Outage.Ga Reed Should Be Contacted for Scheduling & Security Details
ML19338F524
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/30/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Dodd C
OAK RIDGE NATIONAL LABORATORY
References
NUDOCS 8010200462
Download: ML19338F524 (1)


Text

.

i g Je- * ' 'Jo 7DVTf M An 6 a

(,/M-i g#

Wisconsin Electnc passa coup >ur g

231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, wt 53201 Septenbcr 30, 1930 fQh Str. C. V. Codd OAK FIOGC NATICNAL LA302ATCRY P. O. Box X Oak Ridge, Tennessee 37830

Dear Str. Dodd:

CAK RIDGE !!ATICNAL LA3C?ATORY ncDY CLPPr;T TC3'2I:;G FOINT 3EACli :iCCII.AR PLA'IT This is in response to your letter of September 12, 1930 which requested permission to perform limited eddy-current inspection of several hc? leg steam generator tubes. We expect that your request can be accormodated during the November outage of Point Beach Unit 1. For planning purposes, you should tentatively plan to inspect, steam generator tubes late in the week of November 24 or early in the week of December 1. In addition, you should allotc one day for plant radiation protection and security orientations prior to beginning work on site. Please contact I'.r. G. A. Reed, manager, Nuclear Operations, at (414)?55-2321 for details of scheduling and security information requirements.

You have indicated tnat your equipment can be used with Westinghouse equipment and I assume you will rake any necessary arrangements for use of Westinghouse fixtures. If there is anything we can do in this regard, please let us know, very truly yours, C. M. Fay, Director Nuclear Power Department Copy to ?'r. Tran=tel (NRC)