ML19338F508
| ML19338F508 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 10/14/1980 |
| From: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0660, RTR-NUREG-660, TASK-2.E.4.1, TASK-2.K.3, TASK-2.K.3.13, TASK-2.K.3.30, TASK-TM JPN-80-45, NUDOCS 8010200441 | |
| Download: ML19338F508 (2) | |
Text
._____ ____ _ _ _ _ _.
- a. -
b-5 POWER AUTHCRITY OF THE STATE OF NEW YORK to CoLUMaus CIRCLE NEW YORK. N. Y.10019 (212) 397 6200 TausTEss croRGET.oERRY CM JOHN S.OYSON Pas,si,OENT & pp;5P g
gq CMA!AusAN
"" Ia'e'u 'd v*c E
oconos L. :NoALLs I"'%*.'.".' 34'"!El."..,
"** * * ^ ' " " - "
?
CICHAnD M. rLYNN JOSEPH R SCHMIEDER r.osERT 3. MILLONZ' October 14,.1980
!!h,'h ratoEmicic n. cunic JPN-80-45
.,,y w,,,,cm,
'Ca", 7,'H/e"!E"'*'
~
OFF1CER "A*.t 'v"f,.... o..,
O GENERAL COWNSEL Director of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. Thomas A.
Ippolito, Chief Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 TMI-2 Action Plan Items II.E.4.1, II.K.3.13a, and II.K.3.30a Refbrence:
Letter, D.G. Eisenhut (NRC) to All Operating Plant Licensees dated September 5, 1980
Dear Sir:
The following summarizes the present status of the subject TMI-2 Action Plan items:
1.
Item II.E.4.1 - Dedicated Hydrogen Penetrations Submittal of the required system design information wa.:.
made in a letter dated September. 30, 1980 from R. J. Pasternak (P.ower Authority) to T.A. Ippolito '(NRC).
2.-
Item II.K.3.13a - Separation of HPCI and RCIC System : Initiation Levels - Analysis A.
Separation of HPCI/RCIC Initiation Setpoints The Power Authority, as a member of the BWR Owners' Group, concurs with the General Electric report on this' topic which was submitted in a letter dated October 1,
(
'1980 from R.H. Bucholz (GE) to D.G. Eisenhut (NRC )..
o 1
l 8 01020_0 % f
. -..~.
, -. v U. S.-Nuclear-Regulatory _
Commission - B.
RCIC Auto Restart General Electric, in a letter dated September 29,
. 1980 from R. H. Bucholz (GE) to-D. F. Ross, Jr. (NRC),
i has requested a meeting with the NRC staff to resolve concerns associated with this topic.
The Power Authority,
- as a member of the BWR Owners' Group, will evaluate the GE analysis pertaining to this item when this information is made available to the Owners' Group.
3.
Item II.K.3.30a --Revised Small Break LOCA Methods to Show Compliance with 10CFR50, Appendix K - Schedule outline The Power Authority has been informed by General Electric that an ~ extension of the October 1, 1980 submittal date has been granted by the NRC staff.
The Power Authority will evaluate the schedule and outline required for this item when this information is made available to the BWR Owners' Group.