THE CINCINNATI GAS.& ELECTRIC COMPANY' CINCINN ATI. OHIO 4520t PA b'
%== ~
September 11, 1980 QA-1340 U. S. Nuclear Regulatory Comission Region III 799 Roosevelt Road-Glen Ellyn, Illinois 60137 Attention:. Mr. Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch RE:
WM.-H. ZIMMER NUr EAR POWER STATION - UNIT I NRC CIRCULAR 80-01, GENERAL ELECTRIC COMPANY RELAYS WITH PETROLEUM JELLY LUBRICATED TIME DIALS - 10CFR50.55(e) E-9, W.0. #57300-957, JOB E-5590 Gentlemen:
This letter constitutes an interim report under 10CFR50.55(e) regarding General Electric Company type IAC Induction Disc Relays with petroleum jelly lubricated time dials.
Our previous report to you regarding this matter was dated April 21,1980.
Our final investigation has identified'a total of one-hundred-ninety-six (196) type IAC relays and nine (9) type IJCV relays employed on various systems which were within the date codes addressed in Bulletin 80-01.
These relays will be replaced with new relays and the potentially defective relays will be scrapped.
Receipt of the new relays is expected in twenty-four (24) weeks at which time they will be calibrated and installed and the nonconformance closed out.
We trust this letter will fulfill the requirements of an interim report.
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By e-E. A. BORGMANN SENIOR VICE PRESIDENT RPE:pa ec: NRC Resident Inspector Attn:
F.-T. Daniels iSEP4 1 'I.,1980j 4
8010.2 o 63 l 3