Testimony Re ASLB Question 3 Re Interim Reliability Evaluation Plan (IREP).TMI-1 Will Not Be Included in Irep. Irep Intended to Serve as Procedural Guidelines & Will Be Ready by CY81.Prof Qualifications Encl
ML19338F365
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/14/1980
From: Rowsome F
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To:
Shared Package
ML19338F357 List:
References
ISSUANCES-SP, NUDOCS 8010200216
Download: ML19338F365 (4)


Text

~

s.

j'

- p.

~

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE'THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of METROPOLITAN.EDIS0N COMPANY,

-)

Docket No. 50-289 et. al.

. (Three Mile Island Nuclear

)

Station. Unit 1)

)

NRC STAFF TESTIMONY OF FRANK H. R0WSOME RELATIVE TO THE INTERIM RELIABILITY EVALUATION PLAN (BOARD QUESTION #3)

Q.1 Please.' state.your.. name and your position with NRC.

A.

My.name is Frank H. Rowsome.

I am an employee ~of the Nuclear Regulatory Commission assigned to the Division of Systems and Reliability Research.

I have' been.a~ member of this Division or.its anticedent Probabilistic

Analysis Staff since July 2, 1979.

Q.2.Have 'you prepared,a statement of professional qualifications?

A.

.Yes.

A copy;of this statement 1s attached to this testimony.

~

-Q.3 - : Please ' state' the nature' of the responsibilities that you have had with respect to Three Mile ~ Island, Units 1 and 2.

. A. -

No ne.

I j8010200.:yJ$

P..'

Q.4 What 'is 'the purpose of-your. testimony?

A.

The. purpose of my testimony.is to provide a response to additional _ Board Question #3 which states:

i

-(Tr. 2392) The results of the Interim' Reliability Evaluation Plan (IREP), as applied to Crystal River Unit No. 3 (CR-3) was i

scheduled for completion 'in July 1980.

(The Board wants to receive a copy of this report.)l a.

When will the IREP be applied -to TMI-l?

b.

Does ~the IREP address the adequacy of the proposed actions for B&W plants?

e l

Response

A draft report on the IREP study of CR-3 was_

submitted to the Office of. Nuclear Regulatory Research (RES). in May 1980.

Three reviews were l

made of the draft: one by RES project management, one by a Research Review Group composed of '

. personnel from RES.- NRR, and consultants, and one by the licensee / owner, Florida Power Corporation.

These reviews identified a number of deficiencies

in the draft report, some of which are significant.

' RES project management is currently negotiating with the contractors, Sandia and Science Applications, c

Inc., to define a workscope and schedule for.

the revision of the draft and its publication m

'~k' y

as a NUREG-CR report. -The authors of the draft are currently assigned-to IREP studies of other plants. Completion is.not. expected until early

- calendar year 1981.

4

Question - 3.a':

"When w'ill IREP be applied to TMI-1?"

-Response:

The Office of Nuclear Regulatory Research, which

'is conducting the current IREP studies, does not plan to~ include TMI-l in IREP. The' current IREP

-studies (the analysis of four other plants commenced ~

E September 15 1980) are intended to serve as a proving; ground for: procedural guidelines that j

'can be followed-by licensees. The procedural guidelines'should be ready for use by the end of calendar year 11981.

In accord with NUREG -

' 0660, it'is expected.ithat NRR will require such studies to be performed.by owners and' submitted

.to the hRC'for review.: We anticipate that.

. many,11f not-all, operating plants will.be e

. asked to submit-IREP-type studies. TMI-l'may be among these.

Question 3.b:

"Does IREP address the adequacy of the proposed l actions;for. Babcock and"Wilcox (B&W) plants?"

LResponse:

No.

v

-n

/ '

3 A

T 4

e e

e v

6 s

PROFESSIONAL QUALIFICATIONS Frank H. Rowsome 4

Position:

- Deputy. Director, Division of-Systems & Reliability Research, Office of Nuclear Regulatory Research '

Education:

' BA, Physics, Harvard College,1962

- Doctoral studies (no degree), theoretical physics,

. Cornell University.

Relevant Profes-

- sional Experience:

Nuclear engineering and system reliability engineering, Bechtel Power Corporation, 6 years

. Deputy Director, Division of Systems & Reliability Research and its anticedent organization, the Probabilistic Analysis Staff, July 2,1979 to present 4

)