ML19338F300

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Request for Extension from 740806 Until 750404 for Compliance W/Interim Acceptance Criteria & for Exemption from Requirements of 10CFR50.46
ML19338F300
Person / Time
Site: Dresden 
Issue date: 03/12/1975
From: Ziemann D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19338F298 List:
References
NUDOCS 8010170685
Download: ML19338F300 (3)


Text

.

l

.s pp

  • s-yg5 ks b

UNITED STATES NUCLEAR REGULA'IDRY COMMISSION

:==

DOCKET NO. 50-10

~="

E=2=

COMMONWEAL'HI EDISON COMPANY

..Si SU "fMi

=:= :-

NOTICE OF REQUEST FOR EXTENSION AND EXEMPTION f?.]

=:=:

he Commonwealth Edison Company (the licensee) is authorized by

=A5

.==

Facility Operating License No. DPR-2 to operate a nuclear power reactor

.::2=a.

identified as Dresden Nuclear Power Station Unit 1 at the licensee's 6=

Dresden Nuclear Power Station, located in Grundy County, Illinois, at steady state power levels up to 700 Wt.

~ ::.g.:.: -

.j

.:. :

By letter dated February 18,197S, the licensee has requested an

~.l.;jl extension of time until August 2,197S, to file a complete analysis of d

i conformance with the Final Acceptance Criteria for Emergency Core d

Cooling System ("FAC") for Dresden Unit 1.

An extension from j

August 6,1974 until April 4,1975 has previously been granted by the

$."'.~

Commission in its Determination with Respect to Variance from the Interim

.=q l

Acceptance Criteria and Extension in Submitting Evaluations from the 21=4 l

Acceptance Criteria.for Emergency Core Cooling System [10 CFR 3 50.46(a)(2)(iii)]

].}

lj dated August 5, 1974 (39 FR 29611).

a

.;:=:

i

~i We letter further requests an exemption from the " requirements of u =

10 CFR 150.46 and any underlying requirement with respect to the diversity

".l..;

of emergency systems or the diversity and redundancy of power sources, which

~

2.:

?.?.^.-R would relieve Commonwealth Edison of the obligation to file a complete

lEE

= = -

25. i?l

=

m:s

~:.

J

8010y7ofyy

._ y J

..=u c: -

== s

~ "

=g=l5

.... a..

.. l analysis prioi to August 2,1975, and, continue in effect the

~=N variance previously, granted from the requirements of the Interim

[

Acceptance Criteria (','IAC")."

====;

Notice is hereby given that the licensee's request has been

g=?

=-

received and is under consideration.

In support of its request, the licensee has submitted a number of affidavits.

~

'Ihe requested relief may be granted if the Commission determines

=s

==

~

i that it conforms to the standards for requested extensions and exemptions specified in 10 CFR Part 50, H 50.'.2 and 5 50.46.

In connection with

=2.,

g m

this request, the submission of views and comments by any interested '

5 l

person is invited. Such views and comments should be submitted' in'

~

h55 writing, addressed to the Secretary, U. S. Nuclear Regulatory Commission, Washington, D.

C., 20555, not later than fourteen (14) days following i

publication of this notice in the Federal Register.

~

1 4

A copy of the request for extension and exemption dated i

February 18, 1975 and related correspondence and documents are

""5_

..c

..=...

l available for public inspection at the Commission's Public Document 7

l I

Room, 1717 H Street, N. W., Washington, D. C.

A copy of the request for 7q j

p extension and exemption dated February 18, 1975, may be obtained upon request p _ _ _._

i p:-

addressed to the U. 'S[ Nuclear Regula' tory Commission, Washington, D.

s.

20555,

[

t Attention: Director, Division of Reactor Licensing.

P:.

Dated at Bethesda, Maryland, this 12th day of March,1975.

EE FOR THE NUCLEAR REGULATORI C0hMISSIOS OrisinrJ sisnedk "E

Dennis L.ziew Dennis L. Ziemann, Chief Operating Reactors Branch fi2 Division of Reactor Licensing ee

, = =

...p,y

';.l.'..

e

(c.f-fl:.?!!:

iss-
ggg.;

qs..

m. E E==5

=

5E====

analysis prior to August 2,1975, and continue in effect the gp==~

GElh==

variance previously granted from the requirements of the Interim EEgii Acceptance Criteria ('!IAC")."

_[

=..===;

Notice is hereby _ given that the _ licensee's request has been g

received and is under consideration.

In support of its request, L

.m the licensee has submitted a number of affidavits.

=:E=b:

The requested relief may be granted if the Commission determines

~

ri==

that it conforms to the standards for requested extensions and execptions

]f specified in 10 CFR Part 50, s 50.42 and 5 50.46.

In connection with

~2 ll,i.f!

~

=.+: E-ll this request, the submission of views and comments by any interested person is invited.

Such views and comments should be submitted in l=,

writing, addressed to_ the Secretary, U. S. Nuclear Regulatory Commission, F

Washington, D.

C., 20555, not later than fourteen (14) days following

=3.,a publication of this notice in the Federal Register.

]

A copy of the request for extension and exemption dated

!=F February 18, 1975 and related correspondence and documents are

...mj E

?.0::

availabic for public inspection at the Commission's Public Document

==

tm..i r.N 4.<.,

Y?=

Room, 171711 Street, N. W., Washington, D. C.

A copy of these-tlocuments

= = _

re-L -:,.,,. p cQ.v Yt. l u. v..

\\,1^ W '

may be obtEined upon request addressed to the U. S. Nuclear Regulatory is sh Commission, Washington, D. C.

20555, Attention: Director, Division

- s of Reactor Licensing.

==

si: -

Dated at-Bethesda, Maryland, this Q i :-

Y" FOR Tile NUCLEAR REGULATORY COMMISSION t

.)

Dennis-L. Ziemann, Chief Operating Reactors Branch #2 Division of Reactor Licensing

.