ML19338F057

From kanterella
Jump to navigation Jump to search
Forwards Test Rept:Verification of Adequacy of Calculations for Sequoyah AC Auxiliary Power Sys, in Response to Position 4 for Question 8.33.Rept Demonstrates Adequacy of Calculational Methods Used to Design Power Sys
Date released: 12/18/2019 Download: ML19338F057


Test Rept:Verification of Adequacy of Calculations for Sequoyah AC Auxiliary Power Sys.
ML19338F061
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/02/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19338F061 (13)
Forwards Test Rept:Verification of Adequacy of Calculations for Sequoyah AC Auxiliary Power Sys, in Response to Position 4 for Question 8.33.Rept Demonstrates Adequacy of Calculational Methods Used to Design Power Sys
ML19338F056
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/03/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
Download: ML19338F056 (2)