ML19338F048

From kanterella
Jump to navigation Jump to search
Forwards LER 80-070/03L-0
Date released: 12/18/2019 Download: ML19338F048


LER 80-070/03L-0:on 800828,during Weekly Diesel Fuel Pump Test ST 5016.01,diesel Fuel Pump Failed to Start at Required 95 Psig.Caused by Broken Pressure Switch.Switch Repaired & Recalibrated
ML19338F052
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/03/1980
From: Frohne R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19338F052 (3)
Forwards LER 80-070/03L-0
ML19338F047
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/03/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19338F047 (1)