Mod 9,providing for Eight Oral Presentations by Contractor to Design for Ifmis
ML19338E788
Person / Time
Issue date: 09/15/1980
From: Mattia M
NRC OFFICE OF ADMINISTRATION (ADM), SMALL BUSINESS ADMINISTRATION, TECHNASSOCIATES, INC.
To:
Shared Package
ML19338E786 List:
References
CON-FIN-B-5131, CON-NRC-10-80-395 NUDOCS 8010060139
Download: ML19338E788 (2)


Text

3(Q,

L

.AQs s

Oo uAnoko ro.uA n. suu ms AMENDMENT OF SOI.lCITATION/ MODIFICATION OF CONTP.ACT 1

2 l

4 cr

  • t st evicts..a =~isu. MON

,.OC. n O.

Ceni -i ioi

l. AmtNDaalmis anociHCAICN p.Q.
2. gretCfivt DAf4
2. 8tOUl5liCNe PURCMA5E REOVist NO.
4. PROJtCT NO. e lf.,ppl.s.Jp/pj NINE (9) 9/15/80 RFPA No. ADM An 104
s. Ao-.N,ssmo si ut us.e >>w u-* si Cwel
5.,ssun sT U.S. NUCLEAR REGULATORY COMMISSION Division of Contracts Washington, DC 20555 I*
7. CQNTR ACTOR NAME AND ADDEIII PRIME: U.S. SMALL BUSINESS ADMINISTRATION

/X / Modification of Contract No, Washington District Office PRIME: NRC-10-80-395 103015th Street, NW SUB: SB3-4-0-8(a)-79-C-563 Washington, DC 20417 (Formerly NRC-09-79-349)

SUB:

TECHNASSOCIATES, INC.

77714th Street, NW Dated 5/7/79 (See Block 11)

Washington, DC 20005

, TM.5 BLOCE APPtits ONLY TO AsafNDutNTS OF 50ttOT AtONS r i,

..r.a v.,,-.

O.. O -.. <a. O...~~-

n... ~.6..w

..a

.a i n.

O..~.a..s....,-..

..~..~.

,.a

.-r.a 4.

.....,i

.~

a.i.,..

-w

.e

..~ u ~ -..6...,.e...a..6..w.,m ir..

..i.....i.,,..

n..,.

.CllVED AT THE 15$UING OPPICI Ptiot TO THf i.i.,....,~.,

F A'Luft OF YOUR ACKNOW1(DGEMENT f0 B( SE wh..f. en.l..... re,e..a.e 8. the..l

.. d. men mene.embe.

i..wr......w.

.... ~,6. ~,......

oAri SnCinio -AT nsuit iN eaCTiON O, You. Or,rt

.,ie......awi............~t..w..~a-.....-.a,,..,..-.r....

10. ACCouNilNG AND APPROPflAICM QATA (([ nyg,r.g) 4
31. fMf5 SLOCK APPtits ONLY TO anODlHCAflONS OF CONftACf5/OaDEt5 C1ause No. 2 entitled " Chances" of contract General Provisions.

c., Q tw C>

.. O,

..... a.

ti O a is.

6 6

~..i ni O Ti.

~. a..

/.,...wea...a.,

.e.

6

. c

.. o.....,

.w............ c..i m i t.

m a 1,... s...... A....,

4.....a

-a.r......

~.

.... si

12. Ot$CR4PTCN OF AM(NDAAENT/a*OCiFICAICN Pursuant to the authority of FPR Suboart 1-7.404-5 and the " Changes" clause of this contract, the following unilateral changes are made:

A.

Under Article I - Scope of Work, the following. changes are made:

1.

Paragraph C - Statement of Work, Phase II, Task 2 is revised to include

~

the following:

"The Contractor shall provide formal detailed oral presentations concerning each module contained in the IFMIS System / Subsystem Specification Document.

A minimum of eight (8) separate one (1) day sessions will be scheduled by the Project Officer at times, dates and places mutually agreeable to the parties.. All such presentations must be completed no later than October 15, 1980.

NRC representatives will provide comments during each of the above sessions. The Contractor shall discuss any such comments with the NRC Project Officer prior to incorporating the com ents into the IFMIS System / Subsystem Specification Document."

.............~..........,...........e......,w..~,,.-~,,,......

CCPif$ TG t$$UING Of flCE h TO 5 CONTRACTO2/GFFERC4 l$ #ECU3aED TO $sGN TMis DOCUu(NT AND RETVEN T 5 CUst le, NAmt Of CorertACTOa/CFFrece

87. UNITEo STATE F AMithCA

//.

D,,.~..m._$MLD

/

sf

,,,.N..

=.....,

l.

DAIE 560NED

15. MAant ANO itTLt OF SIGNit (Typ..r per.tp 1

DATE $4GN(O 18 NAM ( Of CONTRACTING OFFKEE ( I)p.., prp.yf) h //MO Mary Jo Mattia

""*~"'..s.

.S'<*a=*a'"'"***""30-101

" 010060 \\3 %

%~

PRIME:.NRC-10-80-395 SUB: SB3-4-0-8(a)-79-C-563 Modification No. Nine (9)

Page 2 of 2 2.

Paragraph E - Schedule,'the chart displaying the delivery schedule for Phase II, as added b Modification No. Four (4) and revised by Modification No. Seven (y) to this contract, is further revised to 7

read i, follows:

" Phase II -- Deliverables Draft Re-Draft Final Task 2b - GA0~ Accounting Systems Design, ADP Application 4/16/80 N/A 5/14/80 Task 2a - System / Subsystem Specifications Document 8/18/80 9/19/80 10/31/80 Task 3 - Implementation Plan 8/10/80 N/A 9/15/80 B.

Regarding Article II - Period 'of Performance, the period of performance for Phase II of this contract is hereby extended through October 31, 1980.

b f -

, ~,..

-