Forwards IE Insp Rept 80-01 on 800730 & Notice of Violation
ML19338E721
Person / Time
Issue date: 08/18/1980
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Battey G
SMITH-EMERY CO.
Shared Package
ML19338E715 List:
References
NUDOCS 8010060049
Download: ML19338E721 (2)


Text

(gI b' %.,'o.

)

UNITED STATES 8

3 NUCLEAR REGULATORY COMMISSION

,[S REGION V Q

1990 N. CALIFORNIA BOULEVARD

,d

SUITE 202, WALNUT CREEK PLAZA

President Gentlemen:

Subject:

NRC Inspection This refers to the routine inspection conducted by Ms. B. A. Riedlinger of this office on July 30, 1980 of activities authorized by the general license issued by 10 CFR 150.20 and to the discussion of our findings held by Ms.

Riedlinger with Mr. Ed Ekberg of your staff at the conclusion of the inspection.

The inspection was an examination of the activities conducted under your general license as they relate to radiation safety and to compliance with the Comission's rules and regulations and the conditions of your state license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel and observations by the inspector.

During this inspection, it was found that certain c.f your activities appeared to be in noncompliance with NRC requirements.

The items and references to the pertinent requirements are listed in the enclosure to this letter. These items have been categorized into levels as described in our correspondence to all NRC licensees dated December 31, 1974. A copy of that letter is enclosed.

This notice is sent to you pursuant to the provisions of Section 2.201, of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20) days of your receipt of this notice, a written statement or explanation in reply including (1) corrective steps which have been taken by you, and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Since actions have already been taken to correct items A, and C.(1.), as described in Appendix A, no further response to those two items is required.

-8010060 6

AUG is 30 Mr, G. E. Battey, Jr. Should you have any questions concerning this inspection, we will be glad to discuss them with y u.

Sincerely, W

H. E. Book, Chief Fuel Facility and Materials Safety Branch

Enclosures:

1.

Notice of Violation 2.

Letter to all NRC licensees dated 12/31/74 g.*