Supplemental Response to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Deficient Springs in Actuators W/ Masoneilian Valves for safety-related Applications Will Be Replaced Prior to Shipment to Site
ML19338E316
Person / Time
Site: Byron, Braidwood, LaSalle  Constellation icon.png
Issue date: 08/29/1980
From: Rausch T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IEB-80-09, IEB-80-9, NUDOCS 8009250468
Download: ML19338E316 (3)


Text

.

f3 Conunonwealth Edison i 4 T

/;Re g;t; ) one First Natiorni Plua. Chic"go Ithnois

. \ Jg Addr1ss Riply to: Post Offic's Box 767

( / Chicago, Illinois 60690 s

August 29, 1980 U.S. Nuclear Regulatory Commission Director of Reactor Constructio.n Inspection, 0.I.E.

Washington, DC 20555

Subject:

Supplemental Responee to IE Bulletin 80-09, "Hydramotor Actuator Deficiencies" LaSalle County Station Units 1 and 2; Byron Station Units 1 and 2; Braidwood Station Units 1 and 2; NRC Docket Nos. 50-373/374 and 50-454/455/456/457

, Reference (a): J. G. Keppler letter to C. Reed dated April 17, 1980 (b):

D. L. Peoples letter to J. G. Keppler dated June 16, 1980 (c): D. L. Peoples letter to J. G. Keppler

dated July 15, 1980

Dear Sir:

Your request for information contained in Reference (a) concerning "Hydramotor Actuator Deficiencies", was originally responded to in Reference (D), in which we indicated that more time was requireo to completc the review for the subject units. In Reference (c) we noted that our review remained incomplete due to the delays associated with obtaining specific information from our suppliers.

Commonwealth Edison Company has completed the review for ,

Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2.

Our response is contained in the enclosure to this letter.

In the case of LaSalle County Station Units 1 and 2, our supplier of Hydramotor actuators had recently reevaluated Actuator size selection, as required by the subject Bulletin, for the large number of actuators installed or planned for installation at the site. However, on August 20, 1980, our suppliers received revised Nomographs from ITT General Controls thereby necessitating a second complete reevaluation of all Hydramotor actuators at the site. Our complete. response for LaSalle County Station Units 1 and 2 will be provided no later than September 30, 1980.

SEP 02 ESO t

~ ~ ~

8'009250 M -

O i -

4 Please address any questions you may have concarning this

~

matter to this office.

Very truly yours, Thomas n [ *w(

h..ausch Nuclear Licensing Administrator Special Projects <

i 1

cc: Mr. James G. Keppler, Director 4

Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 4

l t

i I

4

-6354A: _

_i___..________.___.___m_

ENCLOSURE Response to IE Bulletin 80-09 Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Attachment 1 to the subject bulletin identified those customers of ITT Grinnell who have purchased the deficient Hydramotor actuators. Seven (7) of the customers identified on that attachment supply equipment to the Byron and Braidwood sites. A review of the vendors indicated only two'(2), Masonellian International and Pacific Air Products (PAPCo), have used Hydramotor actuators.

Copes-Vulcan and Posi-Seal uses Limitorque actuators, Fisher Controls uses their own diaphram actuators, and Joy Manufacturing and Powers Regulator Company (via Powers, Asco, and Pope) have not supplied any valves, and therefore no actuators, to the sites.

1. Only two (2) . actuators of this type have been supplied with Masoneillan valves for safety related applications; in the essential service water system supply to the Control Room HVAC system condenser. The deficient springs will be replaced prior to shipment to the site.

To provide added assurance of the adequacy of these actuators, an on-site check of the service water valves will be conducted prior to installation or as part of the system preoperational test.

2. Pacific Air Products identified four (4) dampers supplied to Byron (only) with Hydramotor actuators susceptible to the concern identified in the subject bulletin. These actuators are OVA 054YA/B and OVA 059A/B. This supplier has undertaken and completed an extensive qualification program for the actuators in question, and has concluded that the actuators satisfy the engineering data requirements defined by ITT General Controls. However, to assure the adequacy of these 4 specific components, an on-site check of these components will either be performed prior to installation or as a part of the system preoperational tests of the system (s) involved.