Forwards Corrected Tech Spec Page 7,Section 3.5.1(d) & Page 143,Section 11.4.3.4E to Replace Errors Identified During Review Prior to Implementation of Amend 33 to License DPR-6
ML19338E239
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/12/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML19338E242 List:
References
NUDOCS 8009250278
Download: ML19338E239 (2)


Text

w t

y?

General offices: 212 West Michiesn Avenue. Jackson, Michleen 48201 + (517) 788-0550 September 12, 1980 Director Nuclear Reactor Regulation Att Mr D..tnis M Crutchfield, Chief Operating Reactors Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - TECHNICAL SPECIFICATIONS ERRORS IDENTIFIED DURING AMENDMENT NO 33 IMPLEMENTATION REVIEW By letter dated August 11, 1980, the Commission issued Amendment No 33 to the Big Rock Point Facility Operating License No DPR-6.

During Consumers Power Company's review prior to implementation of the amendment, two errors were noted.

The two errors should be corrected as follows:

1.

Page 7, Section 3.5.1(d) - Change "I Set Automatic A-C Operated" to "I Set Remote Manual A-C Operated."

2.

Page 143, Section 11.4.3.4E - Change power supply breaker designation "52-2334" to "52-2B45."

(Page changes attached.)

The requested wording change in 1 above is required to reflect the condition of power supply breaker 52-2B45 which is locked open to preclude inadvertent operation of M0-7068 (reference Technical Specifications Section 11.3.3.4A).

The wording " remote manual" is chosen to reflect the manual action required to unlock the breaker which allows remote operation of the valve from the control room. The requested wording change in 2 above is required to correct a typographical error in our submitt.

dated July 7, 1980.

i

\\

oc0980-0204a-48 80098so t

O 2

It is requested that these corrections be formally made so that the Big Rock Point Technical Specifications can accurately reflect current conditions.

M David P Hoffman Nuclear Licensing Administrator CC Director, Region III, USSRC SRC Resident Inspector-Big Rock Point oc0980-0204a-48

.