ML19338E182
Jump to navigation
Jump to search
| ML19338E182 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/22/1980 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8009250039 | |
| Download: ML19338E182 (1) | |
Text
-~
o, k
G UNITED STATES OF AMERICA E
NUCLEAR REGULATORY COMMISSION D
%gSp g,
- h d
BEFORE THE COMMISSION cn y
In the Matter of
)
h GULF STATES UTILITIES Docket Nos. 50-458
)
50-459 (River send Units 1 and 2)
)
(2.206)
O g
)
O p#@
ORDER Pursuant to 10 CFR 2.772, the time for the Commission to consider whether to review the Director's determination of August 18, 1980, not to suspend construction of this facility is extended to September 29, 1980.
It is so ORDERED.
For the Commission 0
l
,i Riv lid
~~ SAMUEL
., CH KK N Secretary o(ftheCommission Dated at Washington, D.C.
this 22nd day of Septembe & l980.
gp 5
//0 025t) O$9 h