ML19338E155
| ML19338E155 | |
| Person / Time | |
|---|---|
| Site: | 07105926 |
| Issue date: | 08/26/1980 |
| From: | Cunningham G GENERAL ELECTRIC CO. |
| To: | |
| References | |
| 17302, NUDOCS 8009240703 | |
| Download: ML19338E155 (1) | |
Text
T/c.
-7Myz4 f^s NUCLEAR ENEiO' G EN ER Al gg ELECTRIC
~
ENGINEERING GENERAL ELECTRIC CCMPANY, P.o. Box 460, PLEASANToN, CAU.* MNIA 94566 DIVISION August 26, 1980 C. E. MacDonald, Chief Transportation Certification Braich Division of Fuel Cycle and Material Safety U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Ref. : Certificate of Cenpliance No. 5926
Dear Mr. MacDonald:
The General Electric Ccmpany, Vallecitos Nuclear Center (VNC), requests tha Certificate of Compliance No. 5926 for the G.E. Mcdel 100 shipping container be acdified to read:
- 5. (b) Contents (1) Type and form of material (i) Byproduct and spxial nuclear material in the fon:. of fuel rods, or plates, fuel assemblies, or.neeting special fom requirements of 10 CFR 571.4(o); or (ii) Solid non-fissile irradiated metal hardware or c'.her solid non-fissile material provided it is contained in xtal cladding.
The basis for this amendment is the fact that the requested materials cannot readily disperse under the postulated accident conditions.
A check for $150.00 for the amendment fee is enclosed.
Sincerely, 0{
G. E. Cunningham Senior Licensing Engineer
/11 enclosure 17302 8 00924n7c3 C
m
.