Responds to NRC Re Violations Noted in IE Insp Repts 50-416/80-07 & 50-417/80-06.Corrective Actions: Dredging Operations Will Be Completed by 800905
ML19338E017
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 07/30/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19338E009 List:
References
AECM-80-71, NUDOCS 8009240331
Download: ML19338E017 (1)


Text

e J

]

MISSISSIPPI POWER & LIGHT COMPANY 3 j Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, M I S S I S S I P P I 3 9 2 0 5,.jg tutIMaddB c:)

', A NUCLEAR PRooUCTloN DEPARTMENT July 30, 1980 g

0 9

7[M, ef Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Y-f>

Region II

(,

i.,.

101 Marietta Street, N.W.

p Suite 3160 o

t Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 File 0260/0494/15521 RII:ALC 50-416/80-07; 50-417/80-06 Supplemental Information to IE Inspection Report AECM-80/170

Reference:

AECM-80/71, 4/9/80 The referenced letter provided Mississippi Power & Light Com-pany's response to the deficiency noted during the inspection with respect to the Sediment Basins at Grand Gulf Nuclear Station.

We had committed to achieve full compliance by August 1, 1980.

However, due to certain construction exigencies and adverse weather, the equipment necessary to complete the dredging operation has not been available. As a result, the schedule has been changed. We now estimate that full compliance will be achieved by September 5, 1980.

Yours truly, gyJ.P.McGaughy,Jr.

Assistant Vice President, Nuclear Production ATR:mt cc:

Mr. N. L. Stampley Mr. Victor Stello, Director Mr. R. B. McGehee Division of Inspection & Enforcement Mr. T. B. Conner U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Member Middle South Utilities System OFFICIAL COPY 8 Oggg

.