Modificaticn No. 4'
- ~ ~ * [' _ ' _ -
Supplem:ntal Agracment to
,a Contract No. NRC-04-76-282 SUPPLEMENTAL AGREEMENT BETWEEN SAINT LOUIS UNIVERSITY NID THE U. S. NUCLEAR REGULATORY COMMISSI0d
~
8 THIS SUPPLEMENTAL AGREEMENT, effective the 1st day of July-
, 19 0, by and between the UNITED STATES OF AMERICA (hereinafter referred to as the
" Government"), as represented by the UNITED-STATES NUCLEAR REGULATORY COMMIS-SION (hereinafter referred to as the " Commission"), and SAINT LOUIS UNIVERSITY (hereinafter referred to as the " Contractor").
WITNESSETH THAT:
WHEREAS, the parties desire to modify Contract No. NRC-04-76-282 as nereinafter provided, and this supplemental agreement is authorized by law, including the Energy Reorganization Act of 1974, as amended, and the Atomic Energy Act of 19S4, a's amended.
NOW, THEREFORE, said contract is hereby modifig,dgs follows:
1.
Appendix A, attached to this supplemental agreement and made a part hereof, provides for the research to be performed by the Contractor during the contract pe,riod specified therein.
2.
In Article II - The Period of Performance, the date " June 30, 1981
.is substituted for the date " June 30, 1980 3.
In Article III - Consideration, the sum "$383,573.00 " is substituted for the sum "$ 271,573.00'.
W
.m.
y i
8009 230 Y7 2..
Mamexion uu: --
Supplemental ~Agrse c..-
a
~
.~
~
Contract Ib. :NRC-04-76-282
~
Paga lb.
2_,
o JN WJTNESS WHEREOF, the parties have. executed this document.
UNITED STATES.0F #1 ERICA BY:
dN 4
~
~Kellogg N. Morton7 Chief Pesearch Contracts Branch
. (ti tl e)
Nuc1 car Regulatory Commission SAINT LOUIS UllIVERSITY
/Il< tim b_
BY:
(
Research Administrator (title)
Jerane J. Marchetti, s.J.
_, certify that I am the I,
(attester) of'.thP. Contractor named Secretary-Treasurer (title) teilliam Stauder, S.J.
under this document; that (signatory) who signed this document on behalf of said Contractor was then of said Contra'ctor; that Rascarch Administrator this document was duly signed for and on behalf of said contractor by authority of its governing body and is within the scope of its legal.
b powers.
IN WITNESS WHEREOF, I have her,eunto affixed my hand and the seal of said Contractor.
/
r.
~
/
- (SEAL) m
- =--
_..x j
-- g g gg y g 73fg, 4 g
' Supplemental Agreement to
~
2.'.
L Contract No. HPC-04-76-282 7-CONTRACTOR::
SAINT LOUIS UNIVERSITYL APPENDIX A For-the. Contract period July 1.1980
. through June 30, 1981 Article A-I RESEARCH TO BE PERFORMED BY CONTRACTOR
-(a)
The unciassifled" scope of work under this contract'in accordance with1 Contractor's proposal entitled, "A Seismological! Study of the Northern Extent of the New Madrid Seismic Zone" is as follows:
1.- Maintain and operate two.short-period seismographic subarray in the New Madrid Earthquakes Study area -- one.subarray in the Wabash Valley 7-8 stations and the other in the vicinity of New Madrid, Missouri 7-8 stations.
2.
Publish all phases, locations, magnitudes, and focal mechanisms (when available) in Central Mississippi Valley Earthquake Bulletin.
3.
Correlate resulting seismicity with local and. regional geology.
4.
Determine the current hypocenters and, relocate significant historJc
~events using the joint hypocenter technique.
5.
Condu'ct velocity and attenuation analyses of the recorded data using the U. S. Geological Survey seismic array processing system to the maximum possible extent.
~ 6.
A simple map (page size) of current seismicity shall be included in the. quarterly technical reports.
~
~
(b)
The Principal Investigator expects to devote the following approximate amount (s) off time 'to the contract work:
~
. Robert B.'Hermann:
100% of his time for-1 academic month a'nd 100% of his itiefor 1 summer month ARTICLE A;II; WAYS' AND MEANS OF PERFORMANCE
'.(a) tItems for which support will be provided as indicated in A-III, below (1) Salaries = and Wages 57,000.00 (2)l Equipment to be purchased or 1,-
. fabricated by.the Contractor
$' ~
g k
4 i
9-
-+
'.._..(A.'
Modificati:In No.'4:
"4 Supplem:ntal Agreement:to.
^,
^
. Contract No. NRC-04-76-282-,
-Appe'ndix A-Page 2 (3) Travel
~
L(i)- Domestic
.5,370.00
.(ii)
Foreign (4)
Other direct l costs including' fringe benefits 46 percent applicable (5)
Indirect.' costs based on a predetermined rate of to. total direct costs less individual items of equipment in excess of
$500.00,. subcontracts' and subgrants in excess of $2,500.00, alterations and, renovations and stipends.
(b)
Items,. if any.significant to the performance of this contract, but
. excluded from computation of Support Cost and from consideration in proportioning costs:
NONE I(c) Time or effort of Principal Investigator (s). including indirect costs and fringe. benefits contri,buted by Contractor but. excluded from com-putation of Support Cost and from consideration in ' proportioning
' costs:-
F NONE Artic.*e A-III.
e The total estimated cost of items under' A-II(a) above for the contract period stated in this Appendix A is $ 112,000.00 ; the Ccmmiss' ion will pay 100 percent
'i' of-the actual costs of these items incurred during the' contract period stated
-in this Appendix A, subject to~ the provisions of Article' III and Article 112,000.00, port Cost foi the contract period stated in The estimated NRC Sup 8-XXVIII.
4#"
this Appendix.A is $
The estimated NRC Support Cost is-funded as follows:
(a)L Estimated unexpended balance from prior period (s)
-02 f(b):'New ffunds for the current period
$ 112_,000.00 (c) Theinew funds being added in A-III(b) constitute the basis for advance
. payments provided under Article B-X..--
f.
w o
9
.O i
,.=
4
-