ML19338D284
| ML19338D284 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/12/1980 |
| From: | Mathis C BOSTON EDISON CO. |
| To: | Collins P Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19338D285 | List: |
| References | |
| 80-213, NUDOCS 8009220250 | |
| Download: ML19338D284 (1) | |
Text
.
+
_. Y '
4 C'{dg301)=w""
P'LCRIM NUCLEAR Pcwcq STAT s R FO
- 1 4 = =<y H ea q = 4 g Fevvcum. Mass 4causcrrs cassa BECo letter #80-213 September 12, 1980 Director of Nuclear Reactor Regulation Attention:
Mr. Paul Collins, Chief Operator Licensing Branch U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
Facility Docket'o: 50-293 In a recent telephone conversation with Mr.
R. Cambell, Mr. Cambell indicated that Boston Edison had not replied in part to Mr. Harold Denton's letter of March 28, 1980.
This was an oversight on our part.
Specifically we had not replied to Mr. Denton's request for changes to our Initial Operator Training Program.
Boston Edison Company has modified their Initial Operator Training Program, effective August 1, 1980.
The Training Department has completed a revision of the entire PNPS Training Manual.
This revision was done as a result of a QA/NASRAC audit conducted August 1979.
At present the Training Manual revisions are being typed, as soon as the typing is completed Boston Edison will issue a complete copy of this manual to you.
Attached is a copy of Section 3.1.1 of the PNPS Training Manual titled, " Initial Operator Training" for your review.
We are sorry for this oversight on our part.
If you have any questions please feel free to contact us.
CDeputy Nuclear Operations Manager j
cak
Attachment:
PNPS Training Manual, Section 3.1.1 6c3
" Initial Operator Training" S
II 4
8009220,2fC7 V
.