OPEF.ATING DATA REPORT DCCKET NO. 50-309 DATE 800512 CO31PLETED SY F.
G :,u r s TELEPHONE 617
>o0.2011 X2215 OPERATING ST ATUS Maine Yankee Notes Pcser level restricted g, g,,.jg 33 m,.
Julv 1980 by stea:n floa through the
- 2. Repor:in; Period:
2630 LP turbines.
- 3. Li:ensed Thermal Power (5tht):
86'.
- 4. N:=e;b:e R::in; (Cross.'.!We):
03
- 5. Desi;n c'>
-! R :in;(Net 31We):
"30
- 6. 3!nimum Depend:b!e C:p::ity (Gross 31We):
"l0 a
- 7. Sinimum Depend:ble C:;::ity (Net 31We):
- 3. If Chan;es C::ur in Capacity Ratin;s (Items Number 3 Th:cu;h 7) S:nce L:st Report. Gise Re: sons:
- 9. Power L:sel To hhi:h Res r:::ed. !f Any (Net 31We):
94 W h37*O S**
"Ot*S
- 10. Re: sons For Res:rs:: ions. !f Any:
This 31on:h Yr.-to Dare Cumuktise i
7 ?.4 4.341.C0
- 11. !! curs In Re cr:in.e Period 33 'O
' 3'3'3
'3 3 ' 06 3 3 r
~
~~
- 12. Nc=ber Of Hou:s Res::ct has Critic:1 0.0 0.0 0.0
- 13. Re ::or Re en: Shu:dov n H ::s
o
- 7-- --- 74 o-711 ol 7,0 27
- 14. !! curs Ce.ner. :or On Le.e n.0 0.0 0.0
- 15. Unit Resene Shu:down Hou:s
- 16. C> r ss ~..~......! E..c.,v Ce..e....-1. ( A!WH) 1, Sol,530.00 5.
0.511.00 111,232.626.00 1,
G re,.s r...:.. !...,. C e.~...
t' i\\. t h H )
592.300.,0,,0 1,9 76. S t.0. 00 36.550.020.00 e
565.134.n0 1.580.394.00
- 30. 07,575.00 I c..
t r....!.. : r...e,Y C e n e.. L.
s../
.se...
4.
ca,.
c^'
A1
'6
- 19. Umt S. nice F::::r o A. 2 !.
61.76 77.94
- 20. Uni: As: b::!!:3 F:::ct "3 79 52 97 67 13
' 21. Unit C ps:iry F :ter tUsin; 3tCC Net) 2,08 51.01 64.39
- 22. Uni: Cap;eitv Fac:: (U.ing DER Net) 1.76 3.76 6.73
- 23. Umt Fere:d Cut:;e Rate
- 24. Shu:Jowns SeheJu:ed Cser Nest 6 Stonths (T)re. Date.:nd Our::!on of E:eh1:
- 25. If Shur Down A: E:-J Cf Report PerioJ. Estimated Date of 5: r:up:
- 26. Units In Tes: 5::t.:s t Prior to Commerci:1 Oper: tion):
Fore::st A chioed ISIT: A L CRITICA LITY IN TIA L E.ECTRICITY 4
i CO':.!ERC! AL CPERA!!CN (q/,,
8 0 081806(A b 4
AVERACE DAILY 1 NIT POWER LEVEL DOCKET NO. _50-309 IJNIT M: tine Yankee DATE 800812 F. C. Beers C051PLETED BY TELEPHONE 61.7-366-9011 X2213 July 1980
.\\l0NDI DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL Olwe Nett Olwe. Net) 1
-Q 13 17 cm 772 2
13 702 403 3
19 786 100 4
557 20 806 6
5 21 6
810 2'
797 808 7
23 800 798 3
811
,4 810 9
25 799 810 798 10 26 903 27 798 811 800 g,
,3 Sli 803 33
- 9 802 14 S03 30 13 309 3
804 807 i
16 INSTRL'CTICNS On th:s forr :t F: :he nera;c J::!y unit power :eselin MWe Net for e::h by in the reponing :nonth. Compute to the ne:re:t whute n.e;2.vatt.
4 r
..*v.,.,-
c--.s--,,
.-,--e-,,
UNIT S!!U1 DOWNS AND POWER ltEDUC110NS DOCEET NO.
50 309 7
~
UNIT NA?.lE., fl line T.ankee DALE 800812
- I ElO "Y f
C' " " " "
ItLPORT MONill.Tulv 1980 T ELI.PilON E 617-166-9011 X2215 e
ri 3 ui 5
.2 _e g
, E '.i Ekensee S - r,,
f]t, Canse i rnireceiv e No.
Date g
3 E' n
,g g /f Eseni n,a e s.
A1,, inn in F
$5 c"2
.5dic Report #
di0 EO hesent itecurrence e.
1 O
d L.
R.
7-2-80 F
54.80 A
1 NA lill PUMPXX-B llinh vibration on P-2A feed pump, -
to thru 7-5-80 thrust bearing clearances adjusted 55%
and motor / pump coupling realigned.
L. R.
7-18-80 F
34.40 A
1 NA liA INSTRU-E Load reduction due to suspected pro-to thru blems with turbine-generator differ-93%
7-20-80 ential expansion - later determined to be erroneous readings.
7-20-80 F
13.13 G
3 NA liA INSTRU-X Operator mistakenly opened test valve 10-80-'
1 on turbine tiirust bearing system while taking routine readings.
I 2
3 4
1: Enri ed Itcau n:
Meitind:
rx!nt,it G - Instint in.ns 5: St hed nled A Iipiipinen: 17adnic ( Explain) l -M uneal fue picp n.iiii.n or li. iia 11 Maintenance or Test
.tMannal Scrain.
Entry Sheets li... I.is emec C Itcf ocling
- 3. Antonsilic Scrain, 1%cni Itcruil (1.I'It! I de INtilti.G.
D Itcs;nlatiny Itcuriction 4 Other (lixplain) 0168)
E Opci.itor l'eaining & l.itcuse Examinalion 12 Ailmini'.leatiec 3
G Op. eation.d I sins (lixpl in)
(Nin! it I Saine Siniese 08/17) 11 Othes (Expl ein)
DOCKET.';0.
50-309 UNIT Maine Yankee DATE 800812 CO:'PLETED BY F. C. Beers TELEPliONE 617-366-9011 X2215 REPORT MO.'.TH Julv 1980 SC:!ARY OF OPERATING EXPERIENCES At the beginning of the month the plant was operating at full load.
On July 2 a load reduction to 557. was performed due to higher than normal vibration readings on the P-2A =ain feedwater pump. The pu=p's thrust bearing clearances were adjusted and the purp/ motor couplins was re-aligned. The plant was back at full load on July 5.
On July 18 load uas reduced to 193% in response to an apparent increase in turbine / generator differential expansion. Final resolution of this problem was determined to be an instrumentation calfunction.
On July 20, while the plant was still holding a 933 power, an auxiliary operator mistakenly opened the turbine thrust bearing, trip test valve and caused a turbine / reactor trip.
The plant returned to power that same day and was back at full load on July 21 where it remained for the rest of the nonth.