ML19338C242

From kanterella
Jump to navigation Jump to search
Amends 57 & 52 to Licenses DPR-29 & DPR-30,respectively, Revising Tech Specs,App B,So That 2 F Per Hour Temp Change Limit Does Not Apply During Changes in Mode of Condenser Cooling,And Changing Monitoring Reporting Requirements
ML19338C242
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/06/1980
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19338C243 List:
References
NUDOCS 8008140251
Download: ML19338C242 (10)


Text

.

[km Rf C UNITED STATES 4' '

NUCLEAR REGULATORY COMMISSION

{

WASHINGTON, D. C. 20666

/

C050NWEALTH EDISON COMPANY AND IOWA ILLINOIS GAS AND ELECTRIC COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 57 License No. DPR-29 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by Comonwealth Edison Company (the licensee) dated February 2,1978, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission*

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirenents have been satisfied.

2.

Accordingly, the li.cnse is amended by changes to the Technical Specifications as indicated in the attachment to this license amend-ment, and paragrapa 3.B of Facility Operating License No. DPR-29 is hereby amended to read as follows:

8.

Technical Specifications The Technical Specifications contained in Appendices A and I

B, as revised through Amendment No. 57, are hereby incorporated i

l in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

i l

6008140 $

I

1 3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COPfiISSION Thoma

. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 6,1980 l

,-r--

-n--

ATTACHMENT TO LICENSE AMENDMENT NO. 57 FACILITY OPERATING LICENSE NO. DPR-29 DOCKET NO. 50-254 Revise Appendix B Technical Specifications by removing pages E1.2/2.2-1 and E3.1-1 and replacing with the enclosed pages.

.---,,n,v

...-,r+-

,e

,-- -- -,. -. -, --.w..

,,es..

r-,-

4- - - - -,,.,,,,,,., - - -,,-~

.v-..,,n_,

.e,,.. -

i i

=

QUAli-C! TIES J

Di'l:-29 E1.2/2.7. TJ.MPERATURE 1.BitTATIONS LI'.;! ?!NG CONDITIONS FOP. OPEllNiiON SUl!VEILLANCE REQUIRF.MENTS F

SPECIFICATIONS 4

Heated eDleent from the plant shall meet the follow.

Ambihnt river water ten:perature and discha ge temperatures will be mmd:orcd. Temperature sen-ing restrictions beyond a mixiiig zone 600 feet sor> will be used to define the temperature regime j

dovnstream of the di {eser pi es:

f above and below the plant. Measurements from the sensors are telemetered into the station contr01 room A.

The normal daily and seiasonal temperature and are recorded on a strip chart recorder.

' fluctuations that cy.isted b.*:bre the addition of

}~.*"'***E*'"'"I***"*'*"i#I#^'#d#PP'"*I*"'#If heated elliuent simll be maintained.

600 feet downstream of the diffuser pipes, one temperature sensor is located in the discharge bay, B.

"The maxinium temperature rise at any time (or and two temperature sensors are located.in the place) above naiural ambient temperatures intake area to record amhient river temperature.

shall not e.sceed 5 F.

Temperature informauon collected from this system C.

The rate of chan,ee of temperature due to is recorded.

. heated efiluent from the difruser pipes shall not Figure 2.21,shows the locations of temperature exceed 2* F per hour (during controlled changes in operation of the pt:tn:). This requirement need not be met during changes in the mode of condenser cooling.

Amendment No. 57 El.2/2.2-1

QUAD-CITIES DPR-29 E3.0 REPORTING REQUIREMENTS 3.1 Chlorine Effluent Reports A letter shall be sent to the Director of the Office of Nuclear A.

Reactor Regulation within 30 days after a limiting condition for operation is exceeded describing the occurrence and justifying corrective action.

A report shall be prepared annually describing the results of the l

B.

chlorine analyzing and monitoring program. This report shall be sent to the Director of the Office of Nuclear Reactor Regulation l

within 90 days after the end of a report period.

3.2 Temperature Limitations Upstream and downstream temperatures recorded in accordance with Section 2.2 will be reported in the annual operating report.

3.3 Fish Impingement Annual reports will' be compiled on the results obtained from impingement Results of the effectiveness of the diversion system will be reported.

counts.

3.4 Chemical Effluent Chemical usage will be documented in the annual operating report each calendar l

year.

i i

Amendment No.

57 E3.1-1

p us

,,t uq(o UNITED STATES

+

(/'g NUCLEAR REGULATORY COMMISSION 2

o wAsHiwoTON. D. C. 20656 t;

JL' y

\\*****/

COMMONWEALTH EDISON COMPANY

-AND IOWA ILLINOIS GAS'INb ELECTRIC COMPANY 1

DOCKET NO. 50-265 QUAD CITIES NUCLEAR POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 52 License No. DPR-30 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated February 2, 1978, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Connission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health I

and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be' inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements 1

l have been satisfied.

l 2.

Accordingly, the license is amended by changes to the Technical Spec-ifications as indicated in the attachment to this license amendment 1

l and paragraph 3.B of Facility License No. DPR-30 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 52, are hereby incorporated in the license. The licensee shall operate the facility in l

accordance with the Technical Specifications.

~.A_

1 i 3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY C079tISSION dh homas ppolito, Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 6,1980 l

i I

I i

ATTACHMENT TO LICENSE AMENDMENT NO. 52 FACILITY OPERATING LICENSE NO. DPR-30 DOCKET NO. 50-265 Revise Appendix B Technical Specifications by removing pages E1.2/2.2-1 and E3.1-1 and replacing with the enclosed pages.

O 9

1 f

T e

e 4-9 b

o y

-r--

-.---<-.-* a

-F-

  • a

->N---

w-F-e-"*Nw

-=e t-w-w--'

s

  • -**--'w-7v ---:--'

wew

~

'v-*P-

---t-ew-

=' -'

Q:!A:)-CTl:iw I)l';t.'::

E I.2/2.'z 'l r:f '.N'.;:A T ii; E I.1 M 1 1 K ! 1() N :

LIMITING CONDITIONS FOl; Ol'EI' ATION SURVElt. LANCE IrEQUIREMENTS SPECIFICATIONS He.:ted'eEluent from the p!an shall meet the follow-Ambient river " act temperature and dini.arge ing restrictions beyond a mixing zone 600 feet temperatures v 11 be ir.anitoitd. Temperature sen-sors will be uwd to ddne the temperaturc iogire.e downstream of the dihser pipes:

above and h*. tow the plant. Measureirents frem tl:e sensors are teleme acd into the station control rooni -

A.

The normal daily and seasonal temperature and are secorded en a strip chart reco.dcr.

fluctu stions that e:.is:ed 'xfore the addition of Four temperature sensors are lacated approximatelv

~

~

heated emuent shall be mamtamed.

600 feet do.instream of the di6aser pipes. one temperature sensor is located in the dischatc: bay.

B.

The maximum temperature rise at any time (or and two ici sperature sensors are located in the place) above natural ambient temperatures

' intake area to record ambient river temperature.

shall not exceed 5

  • F.

Temperatese information collected from this system C.

The rate of change of temperature due to

'is recorded.

heated emuent from the diffuser pip:s shall not Figure 2.2-1 shows the locations of temperature exceed

't

  • F per hour (dur.ing controlled 39,,,

changes in operauon of the plant). Tha.s requirement need not be met during changes in the mode of condenser cooling.

Amendinent No.

52 El.2 / 2.2-1 r' ~ '

QUAD-CITIES DPR 30 E3.0 REPORTING REQUIREMENTS 4

3.1 Chlorine Effluent Reports A letter shall be sent to the Director of the Office of Nuclear A.

Reactor Regulation within 30 days after a limiting cordition for operation is exceeded describing the occurrence and justifying corrective action.

l A report shall be prepared annually describing the results of the B.

chlorine analyzing and monitoring program." This report shall be l

sent to the Director of the Office of Nuclear Reactor Regulation within 90 days after the end of a report period.

3.2 Temperature Limitations l

Upstream and downstream temperatures recorded in accordance with Section 2.2 will be reported in the annual operating report.

3.3 Fish Impingement Annual reports will be compiled on the results obtained from impingement Results of the effectiveness of the diversion system will be reported.

counts.

3.4 Chemical Effluent Chemical usage will be documented in the annual operating report each calendar l

year.

Amendment No. 52 E3.1-1

, _. _. -