IE Insp Repts 50-546/80-05 & 50-547/80-05 on 800121.No Noncompliance Noted.Major Areas Inspected:Development of Licensee Response to Order Confirming Suspension of Const
ML19338B955
Person / Time
Site: Marble Hill
Issue date: 02/13/1980
From: Fiorelli G, Hawkins F, Schweibinz E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19338B954 List:
References
50-546-80-05, 50-546-80-5, 50-547-80-05, 50-547-80-5, NUDOCS 8004040418
Download: ML19338B955 (2)


See also: IR 05000546/1980005

Text

.

O

\\

'.

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report Nos. 50-546/80-05; 50-547/80-05

Docket Nos. 50-546; 50-547

License Nos. CPPR-170; CPPR-171

Licensee: Public Service of Indiana

1000 East Main Street

Plainfield, IN 46168

Facility Name:

Marble Hill Nuclear Generating Station, Units 1 and 2

Inspection At:

Region III office, Glen Ellyn, Illinois

Inspection Conducted: January 21, 1980

[TMOv

Inspectors:

C. C. Williams

2[/f[lo

f'z $d

'

F' C.

a

'

R Sc weibinz

b/3~hb

If

.2-/ 3 YO

Approved by:

to

.

Reactor Construction and

Engineering Support Branch

Inspection Summary

Meeting on January 21, 1980 (Report Nos. 50-546/80-05; 50-547/80-05)

Areas Inspected: This was a special announced meeting to discuss the

development of the licensee's response to the " Order Conforming Suspension

of Construction" dated August 15, 1979, in the form of the Marble Hill

Construction Verification Program. This meeting involved a total of 12

inspector-hours at the RIII office by four NRC inspectors.

Results: No items of noncompliance or deviations were identified.

g004040

_

_

.

DETAILG

1.

1 Attendees

Public Service of Indiana (PSI) and Management Analysis Company

(MAC)

J. Bott, Licensing Manager

T..R. Burns, Project Engineering Manager

J.-M. Norris, Manager, Quality Engineering (MAC)

Sargent & Lundy (S&L)

P. L. Wattelet, Project Manager

K. Kostal, Assistant Manager, Structural-Department

O. Zaben, Senior Structural Project Engineer

NRC

G. Fiorelli, Chief, Reactor Construction and

Engineering Support' Branch (RC&ESB)

C. C. Williams, Chief, Projects Section 2 (RC&ESB)

F. C. Hawkins, Reactor Inspector

E. R. Schweibinz, Reactor Inspector

2.

Meeting

The meeting was initiated by PSI to present their revised Construction

Verification Program in response to the first issue identified in the

NRC " Order Confirming Suspension of Construction Construction", dated

August 15, 1979.

These discussions focused on the PSI draf t, procedures, and scope of

the Construction Verification Program.

Further meetings with NRC to discuss the lirensee's progress regarding

the issues identified the August 15, 1979 erder are planned.