Responds to Re Facility Concerns.Forwards Detailed Outline Info Addressing Concerns,Including Info Re Asymmetric LOCA Loads,Operator Training & Licensing & Mar 1979 Radiocative Gas Release
ML19338B945
Person / Time
Site: Maine Yankee
Issue date: 03/17/1980
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Dwinell M
AFFILIATION NOT ASSIGNED
References
NUDOCS 8004030112
Download: ML19338B945 (3)


Text

P,

~

lI DISTRIBUTION:

yARCH GErtter (ED008436)

A 98c257 Docket File /w/inc.

AEOD NP.C PDR ED0 Rdg MGroff 2

L PDR JCook MStine TERA HDenton DEisenhut (NSIC ECase RVollmer HBerkow/WRuss' ell WGammill Dodet No. 50-309 RDeYoung TJCarter Dross BGrimes RMattson LShao OELD JRMiller Mr. Michael Dwinell OCA(3)

RReid Birt:h Knolls SWookey w/inc.

Cape Elizabeth, Maine 04107 RIngram Gray File Rm. 330

Dear Mr. Dwinell:

Green Ticket File w/inc. Rm. 330 I am taking this opportunity to respond to your letter of January 16, 1980 to the Honorable William S. Cohen regarding the Maine Yankee Nuclear Facility.

The concerns which you mentioned are discussed in Enclosure 1.

I trust the information suppl in the enclosures is responsive to your con-Cerns.

Sincerely, Originr,I Signed by L H.R.Denton Harold R. Denton, Director Office of Huclear Reactor Regulation

Enclosures:

1.

P.esponse to concerns 2.

N'JREG-0094 cc w/ enclosures:

Mr. Robert H. Groce Senior Engineer - Licensing F.aine Yankee Atomic Power Co@any 25 Research Drive t'estboro, Massachusetts 01581 cc:w/0 enclosure ~2:

The Honorable William Cohen C-OLB:DPt1 PCollins 3/ /80 5

[

L

, DO,R,A R,,,,,,, D flR O,,my 0RBn:.D.0R...

C-4.:n0R

.A -

..W. i. 1 1....

dei

,,u t.,,

EC

, e..,

H,D,n on,,,,,

..S.W.o. o..k.e. y/C b SURNAME c4T E >;.3/,,. /89,

. 3.u//,80,

3/g./80,,

3$0,,,

3/(,7,80.,,,,,, 3/,1,']/80,,,,,,

RC FOPh8 ll ? (S.'s) e.No.t 'sted D'J.5. GOVERNMENT PRINTING OFFICE: 1979 289g Q f Q $ Q l[

CONCERNS RFEGARDING Tr5 MAINE YANKEE NUCLEAR FACILITY Asymmetric Loss-of-Coolant-Accident (LOCA) Loads Prior to restart from the recent refueling outage, Maine Yankee installed all hardware necessary to resolve the asymmetric LOCA load issue.

The staff is involved in post-implementation review of these modifications.

Operator Training and micensing In the last several years the quality of the operator training program at Maine Yankee has improved significantly, which is illustrated by the results of the last examination of operators. During the most recent examination held in October 1979, one hundred percent of the individuals tested by the NRC success-fully completed the examination.

A copy of NUREG-0094 the NRC 9perator Licensing Guide is enclosed for your review.

This guide describes the procedures and criteria for the issuance of operator and senior operator licenses.

March 1979 Radioactive Gas Release On March 15, 1979, while cooling down the plant to cold shutdown conditions, there was an unplanned release of gaseoes radioactivity as a result of gasket failure on a valve.

The licensee submitted written information to the Commission on March 26, 1979 regarding this occurrence and specified the corrective actions that were taken.

NRC Inspectors followed up on this issue during an onsite inspection, and verified that reporting requirements had been met and that appropriate corrective action had been taken.

The valve was repaired in a timely fashion, and procedures were modiff ad to isolate the particular portion of the system prior to the establishment of shutdown cooling.

The eight times the annual objective refers to a Technical Specification that requires appropriate corrective action and documentation i' the experienced rate of release of radioactive material in gaseous wastes, when averaged over a calendar quarter, is such that these quantities if continued at the same release rate for a year would exceed eicht times the annual objectives.

Seismic Monitoring The following information was reported to the NRC staff during phone conversations with Maine Yankee Atomic Power Station personnel on April 18 and 19,1979:

On April 18, 1979, operation of the accelerographs was checked.

Due to corrosion of contacts it was determined that control room annunciation would not have occurred if either recorder

. had triggered.

Furthermore, the upper recorder may not have operated during the earthquake for the same reason. Proper operation of the lower recorder was demonstrated.

The film was developed and confirmed that the instrument had not triggered.

The licensee has implemented increased surveillance of the accejerographs following this event.

NRC Order Relating to Piping No order has been issued to Maine Yankee in the past few months regarding piping cracks.

I assume you might be referring to the Show Cause Order issued to Maine Yankee on March 13, 1979. This Order required the plant to be in a cold shutdown condition within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of receipt of the order, and remain shutdown until further order from the Commission pending resolution of questions concerning the ability of piping in certain safety related systems to withstand design seismic forces.

Maine Yankee was shutdown in conpliance with the Order en March 15, 1979. We reviewed the acceptability of the analy-sis techniques used as a basis for the facility's piping design. On May 24, 1979 we issued a Termination of the Order to Show Cause after we had deter-mined that the requirements of the March 13, 1979 Order had been met.

Emergency Planning Currently the NRC staff is involved in najor effort to upgrade the state of amergency planning in and around all of our operating nuclear power fccilities.

Special tears have been established which will be visiting each site having an operating license to assure that this program will be carried out in an effective and tinely manner.

The State of Maine and Maine Yankee's emergency response plans have been submitted for our review. An Emergency Preparedness meeting is planned near the plant site in May 1980.

Spent Fuel Storage The Maine Yankee Facility currently has an adequate spent fuel pool in which to store the spent fuel that has been generated at the site.