ML19337B564

From kanterella
Jump to navigation Jump to search
Forwards LER 80-054/03L-1
Date released: 12/17/2019 Download: ML19337B564


LER 80-054/03L-1:on 800817,when Entering Mode 3 Operation, Boric Acid Transfer Pump 1-CH-P-2B Placed in Svc W/O Performing Periodic Test PT-15.2.Caused by Personnel Oversight.Test Performed W/Satisfactory Results
ML19337B568
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/01/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19337B568 (3)
Forwards LER 80-054/03L-1
ML19337B563
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/01/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19337B563 (1)