ML19337B481

From kanterella
Jump to navigation Jump to search
Mod 9,unilaterally Changing Order to Provide for Eight Oral Presentations by Contractor to Design of Ifmis
ML19337B481
Person / Time
Issue date: 09/15/1980
From: Mattia M
NRC OFFICE OF ADMINISTRATION (ADM), TECHNASSOCIATES, INC.
To:
Shared Package
ML19337B479 List:
References
CON-FIN-B-5131, CON-NRC-10-80-395 NUDOCS 8010020601
Download: ML19337B481 (2)


Text

.

=

9

  • e PAGE l Op

$!A C'.2D f Qase JO, JULT 8960 AMENDMENT GF SOLICITATION / MODIFICATION OF CONTRACT I

2 o,o, tat sitviCt,s.i C,acNistu. nON AD Ni.OC. nG.

.ii-i ici

3. Asaf ND=tNis e.ODif:CAlsON NO.

3, gif tCTjyt DATE

3. AfoUf51 TION /PURCP8A11 #EOURSI NO.
4. PROJtCT NO. (l/.pp/ar.4/g)

NINE (9) 9/15/80 RFPA No. ADM Rn ' tog

5. 55Ut3 SY
6. Acus.tlitetD er (lf.ther se. 6t.se 31 CODE l U.S. NUCLEM REGULATORY COMMISSION Division of Jontracts Washington, DC 20555
7. CONTRAC108 NLut AND ADDetSS PRIME: U.S. SMALL BUSINESS ADMINISTRATION

/X / Modification of Contract No.

Washington District Office PRlr.i: NRC-10-80-395 103015th Street, NW SUB: SB3-4-0-8(a)-79-C-563 Washington, DC 20417 (Formerly NRC-09-79-349)

SUB:

TECHNASSOCIATES, INC.

777 14th Street, NW Dated S/7/79 (See Block 11)

Washington, DC 20005

e. TMel SLOCs APPLits ONLY TO AmtNDutNf5 Of SOLICIT AfsON$

Yi 6

.- d ad ' -

' oa -

ad.

' ad.

0 a - -. 6 d '.. a ad. ".* w a is.

0.. -.a.-.d

...w ~ ~

..n

.a d

.-.F.w u.

wa.

.e u n

~,.

~

ni., -..a a

,me,.a ed.

....u.

...b..na, i.ie,

..i.....;.....

F AILutt Of YOUR ACENOWLEDGEMENT TO st RfClivtD AT TME 155UING OPPICE Ptiot YO TMt MOu

-h..h..=. des. eeeee.m. s. sh.

i

.e.i d

.dm.

mbee..If. by. wow. 8 'h.e.sieada y deene

.h

,. a.

  1. *.1<..dr b= ed..wh.h

.y b. a

d. by wieg.

DAf t $PtCifatD MAY stSULT BN atJECTION Of YOUR Off Et.

. i.*.

.ded.wh i.,,

e, l.... 6.. =#

u. =

a+me d

.=a

, d. md,e.

=

, h d d.w

.A.d.

to. ACCOUN1 reg AND APPtOPt AfiON DATA (if r#9.sred) 4 II. TMis sLOCK APflitS ONLY 70 mODirtCAtlONS of CONTRACTS /ORDtt$

Clause No. 2 entitled "Chanaes" of contract General Provisions.

i., Q n. Cu. O.d

. u -,

16.C, w.ais..a.

.b d

id iii O t>-.

4 -.

< d..... a.r.d -

a-.

w-

. o. i '...'.......=...

.- d.

..' i w.a i 2.

i > 0 n s. -...i *....

. M d -..

. a a.,......

a. -.

.. w.a i s.

12. OtScalPflON Of AmtNDuf M1/mODetCAfiON Pursuant to the authority of FPR Subpart 1-7.404-5 and the " Changes" clause of this contract, the following unilateral changes are made:

A.

Under Article I - Scope of Work, the following, changes are made:

1.

Paragraph C - Statement of Work, Phase II, Task 2 is revised to include the following:

"The Contractor shall provide formal detailed oral presentations concerning each module contained in the IFMIS System / Subsystem Specification Document.

A minimum of eight (8) separate one (1) day sessions will be scheduled by the Project Officer at times, dates and places r:.tually agreeable to the parties. All such presentations must be completed no later than October 15, 1980.

NRC representatives will provide comments during each of the above sessions. The Contractor shall discuss any such comments with the NRC Project Officer prior to incorporating the comments into the IFMIS System / Subsystem Specification Document."

e.

.. da s.a....a..a.

.. m..

a w.a.....

w.

.,~6 w d

.a..

COPits TO x15UING OFFICI b to"$

CONTRAC108/ OFFEROR 65 GEOUnatD TO SIGN TMt$ DOCUmtNT AND ttTutN 5

  1. t
17. UNITED STA t elCA
14. NAmt OF CONtaActot/OpptBoa i

us

~,..eC.~

tv.,05<-s is

..e,.

a

19. DAtt SIGNED
13. NLmt AND TITLE OF SsGNtt (Type er per.sp 16 DAf t SaGNED I G. NAmt OF CONltACTING Of flCit ( I pf.r prF.l)

J h /6[80 Mary Jo Mattia

' " ' ~

"'"~"""

so io' 8010020 60/

... ~

[

PRIME: NRC-10-80-395 SUB: SB3-4-0-8(a)-79-C-563 Modification No. Nine (9)

Page 2 of 2 o

2.

Paragraph E - Schedule, the chart displaying the delivery schedule for Phase II, as added by Modification No. Four (4) and revised by Modification No. Seven (7) to this contract, is further revised to read as follows:

" Phase II - Deliverables Draft Re-Draft Final Task 2b - GA0' Accounting Systems Design, ADP Application 4/16/80 N/A 5/14/80 4

Task 2a - System / Subsystem Specifications Document 8/18/80 9/19/80 10/31/80 Task 3 - Implementation Plan 8/18/80 N/A 9/15/80 B.

Regarding Article II - Period of Performance, the period of performance for Phase II of this contract is hereby extended through October 31, 1980.

i

- - -