ML19337B430
| ML19337B430 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/29/1980 |
| From: | Hukill H METROPOLITAN EDISON CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| TLL-485, NUDOCS 8010020395 | |
| Download: ML19337B430 (2) | |
Text
.
Me tr' < ditan Edison Company Post Office Box 480 g
Middletown, Pennsylvania 17057 717 944-4041 Wnter's Derect Dial Number September 29, 1980 TLL 485 Office of Nuclear Reactor Regulation Attn:
R. W. Reid, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Outstanding Technical Specification Change Requests on April -'
1980, Met-Ed submitted a list of outstanding Technical Specification Change Req ests (TSCR' along with their respective submittal dates. We asked you to review this list and supply a status report for each item.
Since that time we have received several amendments to the Technical Specifications and have submitted additional TSCR's, but have yet to receive a status report.
Therefore, enclosed please find a revised list of outstanding TSCR's.
A status report of these items would be appreciated.
Sincerely,
. D.
kill Director, TMI-l HDH:DGM: hah
~
Enclosure cc:
J. T. Collins B. J. Snyder D. DiIanni H. Silver
$O/
B. H. Grier S
i l
'_t cco an E: son Cc-cr, s a <-ta c' e :ov ;ur c u t es 5,: -
8o10o20J95 g
s I
e TLL 485 4
i S
i NO.
DATE SUBMITTED DESCRIPTION l
26 12/12/75 condensate analysis for MPC of Xenon, elimination of redundant analyses 34A revised Appendix I I
i 38 9/21/76 cask drop 42 12/30/76 eliminate typographical error, redefine monitoring requirements j
53 4/28/77 53.1 eliminate redundant reviews 53.2 revised language of specification to reflect intent of power distribution mapping 4
53.3 revise secondary activity spec.
(ouperceded by 77A) 53.4 modify Ring Girder surveillance reporting l
53.5 shutdown bypass switch l
60 8/17/77 emergentf power systems j.
68 1/9/78 revised TSCR #21, leakage of' radioactive materials 2
77A 3/31/80 modify Ring Girder / Tendon Surveillance 78 5/8/78 conversion of Unit 1 E.T.S. to Station E.T.S.
81 6/16/78 conversion to S.T.S.
82 6/15/78 small break LOCA procedure 83 6/23/78 revised fire surveillance i
85 12/4/78 delete non-safety related snubbers from table
)
88 1/'s/77 revised S. G. heatup/cooldown curves 90 3/31/80 reactor vessel vent valves l
91 4/9/80 surveillance capsules to Crystal River 3 l
92 4/11/80 R.B. air temperature detectors.
j l
94 7/29/30 S.G. tube inspection 1-i l
1
.