ML19337B104

From kanterella
Jump to navigation Jump to search
Mod 5,extending Period of Performance One Yr & Increasing Funds,To Central VA Regional Seismic Network
ML19337B104
Person / Time
Issue date: 09/12/1980
From: Krebs A, Morton K
NRC OFFICE OF ADMINISTRATION (ADM), VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIV., BLACKSB
To:
Shared Package
ML19337B100 List:
References
CON-FIN-B-6249, CON-NRC-04-77-134, CON-NRC-4-77-134 NUDOCS 8010010281
Download: ML19337B104 (4)


Text

.

(v~h, *t _

Modification No. S Supplemental Agreement to Contract No. NRC-04-77-134 SUPPLEMENTAL AGREEMENT BETWEEN VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY AND THE U. S. NUCLEAR REGULATORY COMMISSION THIS SUPPLEMENTW_ AGREEMENT, effective the 3rd day of April 1980, by and between the UNITED STATES OF AliERICA (hereinafter referred to as the

" Government"), as represented by the UNITED STATES NUCLEAR REGULATORY-COMMIS-SION (hereinafter referred to as the " Commission"-), and VIRGINIA POLYT2CHNIC INSTITUTE AND STATE UNIVERSITY (hereinafter referred to as the " Contractor"),

WITNESSETH THAT:

WHEREAS, the parties desire to modify Contract No. NRC- 04-77-134 as hereinafter

~~

provided, and this supplemental agreement is authorized by law, including the Energy Reorganization Act of 1974, as amended, and the' Atomic Energy Act of 1954, as amended.

NOW, THEREFORE, said contract is hereby modified as follows:

1.

Appendix A, attached to this supplemental agreement and made a part hereof, provides for the research to be performed by the Contractor during the contract pe,riod specified therein.

2.

In Article II - The Period of Performance, the date " June 30,s 1981 is substituted for the date " Juna 30, 1980 3.

In Article III - Consideration, the sum "$301,633.00" is substituted for the sum "$ 212,633.07.

d 1

8010 010.2 T /

Modification No.5 Supplemental Agreement to Contract No. NRC-04-77-134 Page 2 IN WITNESS WHEREOF, the parties have executed this document.

UNI ED STATES OF AMERICA BY:

.m m

Research Con $rton, Chief Kellogg V.if tracts Branch Division of Contracts U. S. Nuclear Regulatory Commission VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY A./ M.' Krebs, Vice Frendent for Administration (ti tl e)

I.

Margie W. Thomas

, certify that I am the (attester)

Clerk to the Board of Visitors

'of the Contractor named under this (title)

A. H. Krebs who signed'this document; that (signatory) document on behalf of said Contractor was then Vice President for Administration

?

of said Contractor; that this document was duly signed for and on behilf 'of said Contractor by authority of its governing body and is within the scope of its legal powers.

IN WITNESS WHEREOF, I have hereunto affixed iny hand and the seal of said Con tractor.'

~MargieJ. Thomas (SEAL.)

- - ~

_ ~..

Qaification No. 5 Supplemental Agre: ment R Contract No. NRC-04-77-13

~

CONTPACTOR:

VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY

^

APPENDIX A For the Contract period July 1,1980 through June 30, 1981 Article A-I RESEARCH TO BE PERFCR 4ED BY CONTRACTOR (a) The unclassified scope of work under thb contract entitle'd " Central Virginia Regional Seismic Network" is as follows:

Project Tasks The datum for the research is observational.

It is to consist of.

1.

Installation and operation of the seismic network, 2.

Monitoring of seismic activity and conduct of local velocity

studies, 3.

Determination c ? hypocenters and composite focal mechanisms

and, 4.

Characterization of the seismic results and correlation with local and regional geologic features, 5.

Publish regional earthquake bulletins.

-- (b) The Principa? Investigator exper.ts to devote the following approximate amount (s) of time to the centract work:

Prof. G. A. Bollinger

'15% of his time for 12 months i

ARTICLE A-II WAYS AND MEANS OF PERFORMANCE

]

(a)

Items for which support will be provided as indicated in A-III, below (1)

Salaries and Wages 25,567.00 (2)

Equipment to be purchased or fabricated by the Contractor 10,000.00 Over $1,000.00 Tektronix Spectrum Analyzer - $5,000.00 Portable Electronic Test & Calibrate System - $5,000.00 i

l

-='+--*mw

N'"

Modification No. 5 Supplcmental Agreement to Contract No. NRC-04-77-134 Appendi,x A Page 2 (3)

Travel(i)

Domestic 2,650.00 (ii)

Foreign

. (4)

Other direct costs including fringe benefits ~

(5)

Indirect costs based on a predetermined rate of 31 percent applicable to total direct costs excluding, items of indivi, dual equipment in excess of 5500.00, subcontracts and subgrants in excess of $25,000.00, Stipends, and alterations and renovations.

(b)

Items, if any, significant to the performance of this contract, but excluded from computation of Support Cost and from consideration in proportioning costs:

NONE

~

(c)

Time or effort of Principal Investigator (s) including indirect costs and fringe benefits contributed by Contractor but excluded from com-putation of Support Cost and from consideration in proportiening costs:

Professor G. A. Bollinger - 15% of his time for 12 months Article A-III The total estimated cost of items under A-II(a) above for the contract period stated in this Appendix A is $88.388.00

the Ccmmission will pay 100 percent of the actual costs of these items incurred during the contract period stated in this Appendix A, subject to the provisions of Article III and Article B-XXVIII.

The estimated NRC Support Cost for the contract period stated in this Appendix A is $ 88,388.00 The estimated NRC Support Cost is funded as follows:

(a)

Estimated unexpended balance from prior period (s)

$ (b)

New funds for the current period

$ 89,000.00 (c) The new funds being added in A-III(b) constitute the basis for advance payments provided under Article 8-X.

e e-.