Notice of Violation from Insp on 800527-30
ML19337A947
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 06/24/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19337A938 List:
References
50-416-80-12, 50-417-80-08, 50-417-80-8, NUDOCS 8010010046
Download: ML19337A947 (1)


Text

r p

b, APPENDIX A NOTICE OF VIOLATION Mississippi Power and Light Coinpany License No. CPPR-118 l

Grand Gulf Based on the NRC inspection May 27-30, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in correspondence to you J

dated December 31, 1974.

}

As required by Criterion V of Appendix B to 10 CFR 50, implemented by Missi-ssippi Power and Light Company's PSAR, Section 17.1.5.2 Bechtel's activities affecting quality shall be accomplished in accordance with instructions, procedures and drawings.

Bechtel Procedure WP/P-C-24, and Specification No. 9645-C-103.1 states that the responsible field engineer shall obtain appropriate approval prior to cutting rebar.

Contrary to the above, on May 28, 1980, the inspector observed electricians I

cutting rebar (by drilling through) in the base of diesel generator QIP75-E0t,1B. The inspector was advised that they were instructed to cut through the rebar and then enter the fact in the rebar cut log.

This is an infraction.

801001004