Forwards Const & Matl Verification Program, Final Rept. Presents Results & Conclusions of QA Program Per App Item C,1 & 2 & Item D,1 & 2 of V Stello 800515 Graduated Recission Order
ML19337A726
Person / Time
Site: Marble Hill
Issue date: 09/12/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19337A727 List:
References
NUDOCS 8009290511
Download: ML19337A726 (2)


Text

.

y.-

S PUBLIC SERVICE INDIANA September 12, 1980 f

S. W. Shields Senior Vice Presdent -

Nuclear Division Mr. J. G. Keppler, Director Docket Nos.:

STN 50-546 STN 50-547 U.S. Nuclear Regulatory Commission

(

Construction CPPR-170 Region III 799 Roosevelt Road Permit Nos:

CPPR-171 Glen Ellyn, IL 60137 Marble Hill Nuclear Generating Station Units 1 and 2 Order Confirming Suspension of Construction Graduated Rescission of Order

Dear Mr. Keppler:

\\

On August 15, 1979, the U. S. Nuclear Regulatory Commission (NRC), Office of Inspection and Enforcement, issued an Order Confirming Suspension of Safety-related Construction (Confirming Order) at the Public Service Company b

of Indiana, Inc. (PSI) Marble Hill Station, Units 1 and 2.

That order required, as a condition of the restart of construction, that PSI submit a description of its Quality Assurance program and the steps taken to assure safety-related constructon will be conducted in accordance with n

that 10 CFR 50, Appendix B.

Another requirement of the Confirming Order was that PSI review the work completed as of the date of suspension of construction to assure that such work was properly performed.

PSI's submittal, " Description of Licensee Activities Addressing Order Confirming Suspension of Construction", was made to the NRC on February 28,

)

1980 and accepted by the staff on May 15, 1980 as an adequate basis for the gradual resumption

' safety-related construction.

Two of the elements of the review of work previously completed were the material and construction verification programs described in Section III, Al and A2 of PSI's a

'1his sul mittal presents the results and conclusions February 28, 1980 report.

1 & 2 of Mr.

of that program as directed in Appendix Item C,1 & 2 and Item D, Stello's Graduated Rescission Order of May 15, 1980.

sY so0@

!]

P.O. Box 190, New Washington, Indiana 47162 812. 293.4441

PUBUC h

[ [ $ Mr.~J.G. Keppler

[ 9a It is concluded that the inspections made as a part of this program have

~

clearly established those materials and structures that meet specified requirements and those that require rework or repair that can be accomplished within the appropriate codes and standards.

With transmittal of this letter, PSI is requesting the NRC to review the l

construction and material verification final report in accordance with Mr.

{

Stello's graduated rescission order of May 15, 1980, Appendix Item C, 3 and

{

Item D, 3.

I Sincerel

. W. Shields JB/kdt Attachment ec:

Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 E.R. Schweibinz, P.E.