ML19337A533

From kanterella
Jump to navigation Jump to search
Responds to NRC 800807 Ltr Re Violations Noted in IE Insp Repts 50-546/80-23 & 50-547/80-23.Corrective Actions:Util Will Perform Audits of Special Process Procedure Program to Ensure That Required Data Are Included in Checklists
ML19337A533
Person / Time
Site: Marble Hill
Issue date: 08/20/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19337A531 List:
References
NUDOCS 8009290208
Download: ML19337A533 (3)


Text

7 Udd10VO?id AN / t PUBLIC SERVICE lfd[)l/(fd/\ August 20, 1980 Mr. Gaston Fiorelli Docket Nos.: STN 50-546 U.S. Nuclear Regulatory Commission STN 50-547 Region III 799 Roosevelt Road Construction Permit Nos.: CPPR-170 Glen Ellyn, IL 60137 CPPR-171

SUBJECT:

Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Fiorelli:

In accordance with the provisions of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, Public Service Company of Indiana, Inc. (PSI) offers the following information in response to the item of noncompliance identified in Inspection Report 50-546/80-23; 50-547/80-23.

Item of no :ompliance (50-546/80-23-01; 50-547/80-23-01) 10 CFR 50, Appendix B, Criterion V requires in part that activitics affecting quality shall be prescribed by documented instructions, procedures, or drawings, and shall be accomplished in accordance with these instructions, procedures, or drawings.

Instructions, procedures or drawings shall include appropriate quantitative or qualititative criteria for determining that important activities have been satisfactorily accomplished.

The Marble Hill PSAR, Section 17.1.5 states in part, that, " PSI requires each contracting organization to develop and implement written instructions, procedures, or drawings for performance of all quality-related activities, including quality assurance or quality control audits of internal and external functions."

Contrary to the above, the licensee failed to follow procedures in the implementation of Special Process Procedure - i (SPP-7), PROCEDURE FOR PHYSICAL INSPECTION AND VERIFICATION OF PREVIOUSLY ACCEPTED PURCHASED ITEMS, as described below:

a. Inspectors failed to obtain the proper test equipment prior to performing the inspection.

AUG 2 51980 8009290)ot

3 ft '

~/

Pusuc August 20, 1980

$ d Letter To: J. Fiorelli

. b. The checklists did'not contain the following information as required by the procedure: specification revision number; purchase order number; supplier and/or manuf acturer, and the quantity of items,

c. When exceptions to an original checklist were taken, the exceptions and the basis for such, were not documented on the checklist, and the exceptions were not approved by the Manager Quality Engineering, as required by the procedure.

CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED

1. a. l. Nonconformance Report PC-0169N was initiated on 6/23/E0 to document that, contrary to the requirements of the checklists used for Specification Y-2804, a calibrated thermometer and a conversion table / chart were not available at the time reverification of electrical enetrations was performed.

A calibrated temperature recorder which records temperatures during normal surveillance / verification tasks has been installed in the Commonwealth-Lord J.V. Warehouse Storage area.

All electrical penetrations which were inspected in accordance with the checklist used for Specification Y-2804, item No. 2 dated 4/3/80 have been reverified and documented to ensure compliance with the l I

requirements of SPP-7. I

b. A memorandum was issued by the Superintendent of Inspection to inspection personnel on 6/20/80 instructing each Inspector to review all inspection packages for which he/she is responsible to ensure that all packages are accurate and complete and that checklists contain all required information. Reviewed inspection packages were forwarded to cognizant Quality Engineering Superintendents for concurrence.

In addition, Receipt Inspection Supervisors have been instructed to perform periodic reviews of inspection packages to ensure continued program compliance.

All inspection packages have been reviewed and now meet the requirements of SPP-7.

c. Cognizant Quality Engineering Superintendents were directed by the Manager of Quality Engineering to review applicable checklists to ensure that any exceptions to the checklists were documented and approved by appropriate individuals.

Review commpletion is echeduled for 8/22/80.

q 4

fe' , ..

L'::

PUBUC s

( Letter To: J. Fiorelli , August 20, 1980

. Cognizant Quality Engineering Superintendents review and approve checklists as specified in the Project Quality Assurance Manual.

CORRECTIVE ACTION TO PREVENT RECURRENCE

1. a. A temperature recorder which records temperatures during normal surveillance / reverification tasks has been installed in the inspect..on area and will be procedurally calibrated and maintained.
b. PSI will continue to audit the SPP Program on a scheduled basis to ensure that all required data are included in checklists.
c. Cognizant Quality Engineering Superintendents will ensure that checklists clearly categorize characteristics of their respective disciplines. The cognizant Quality Engineering Superintendent shall sign the master copy of the checklist thereby indicating acceptance and understanding of the checklis.t requirements.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Items 1.a and c are scheduled for completion on B/22/80. Item 1.b has been completed as of 8/14/80.

Sincerel ,