ML19337A046
| ML19337A046 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/29/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-14, NUDOCS 8008070539 | |
| Download: ML19337A046 (2) | |
Text
_
..- ---~
k
- =:=s9:e schedkrfAbr s /[
P st Office Box 2641
,l Birmingham. Alabams 35291 t*
Telephone 205 323-5341
' ' ',E !4 R C.R E W % :'
U
,n.. a n.-
a F. L CLAYTON, JR.
Alabama Power Senior Vice President the southern electrc system 30 Jul. 31 All,. 3 9 July 29, 1980 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement Region II 101 Marietta Street Suite 3100 Atlanta, Georgia 30303
Dear Sir:
Alabama Power Company submits the attached quarterly follow-up status report on the pipe support re-analysis program for Farley Nuclear Plant Unit I as committed in my letter to you dated October 5, 1979 (response to I.E.Bulletin 79-14).
If you have any questions, please advise.
Yours very truly, Y
. _. Clayton Jr.
FLCjr/CLB:rt Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Office of I & E Divn, of Reactor Operations Inspection Washington, D. C.
Mr. W. H. Bradford b
l OFFICIAL COPY Boe8ovo537 i
/
r
.s.
l Reanalysis of Farley Unit 1 Pipe Supports Follow-up Status Report
~
(ResponsetoI.E.Bulletin 79-14)
July 23, 1980 Total Number of Pipe Supports in Analysis Program 1,558
- Number of Support Analyses Completed 1,215 Number of Support Analyses in Progress 343 Number of Supports Identified as Requiring 0
Modification During Second Refueling Outage Number of Supports Repaired During February TMI 18 Outage, June Steam Generator Tube Repair Outage,
~
or While at Power No deficient supports hav; been identified which affect operability of any scoped systems.
- Includes 38 supports not within 79-14 program scope but attached to supports within program scope.
e I
1
(
..