MONTHYEARML24297A0112024-10-23023 October 2024 Meeting on Section 205 of the Advance Act: Fusion Energy Regulation ML24226A4582024-08-29029 August 2024 Financial Assurance Requirements for Disposition of Category 1-3 Byproduct Material Radioactive Sealed Sources Handout August 29 2024 Meeting ML24229A0942024-08-19019 August 2024 8-19-24 Meeting with NEI on Pirts - NRC Slides Final ML24207A0262024-08-13013 August 2024 Publicmeeting_Presentation for August_14_2024--FusionMachines_ProposedRule ML24192A1272024-07-10010 July 2024 Scale and Melcor non-LWR Fuel Cycle Demonstration Project - MSR ML24164A2372024-06-17017 June 2024 ACMUI Extravasations Handout June 17 2024 Meeting ML24149A1882024-06-0505 June 2024 ACMUI June 5 2024 Meeting Handout ML24075A1722024-02-22022 February 2024 Attachment 1 - NMMSS Trtr Presentation ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23355A1432024-01-17017 January 2024 January 17, 2024 Public Meeting Handout - Fusion Systems Rulemaking ML23258A1802023-11-0909 November 2023 November 9, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23296A1992023-11-0808 November 2023 Cumulative Effects of Regulation Public Meeting (11/08/2023): Renewing Nuclear Power Plant Operating Licenses – Environmental Review (Rin 3150-AK32; NRC-2018-0296) ML23258A1712023-11-0101 November 2023 November 1, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule NUREG-1556, November 1, 2023 Public Meeting Handout Preliminary Draft Guidance (NUREG-1556, Volume 22) Fusion Systems Proposed Rule2023-10-31031 October 2023 November 1, 2023 Public Meeting Handout Preliminary Draft Guidance (NUREG-1556, Volume 22) Fusion Systems Proposed Rule ML23240A7182023-08-29029 August 2023 Slides - Public Meeting on Regulatory Basis for Rb-82 Generators, Emerging Medical Technologies, and Other Medical Use of Byproduct Material ML23191A1532023-07-12012 July 2023 – Public Meeting Presentation -- Proposed Rule: Regulatory Framework for Fusion Energy Systems ML23123A3292023-06-0606 June 2023 SGI Training ML13108A326 ML23123A3322023-06-0606 June 2023 SGI Pamphlet ML23062A7352023-04-14014 April 2023 Tanana Chiefs Conference 2023 Annual Convention NRC Presentation ML23137A0442023-04-11011 April 2023 April 11, 2023, Presentation to NOAA Narw Northeast U.S. Implementation Team - North Atlantic Right Whale and NRC Endangered Species Act Consultations ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML23019A0122023-01-19019 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Awareness Training for NRC & Agreement State Inspectors ML23012A2302023-01-12012 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Public Presentation - Decommissioning Fuel Cycle, Uranium Recovery & Materials Inspection Program ML23006A0232022-12-15015 December 2022 NEIs Presentation for the December 15, 2022 Spent Fuel Priorities Meeting with NEI ML22334A1022022-12-0505 December 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Fall 2022 Meeting Handout ML22334A2692022-11-30030 November 2022 Advisory Committee on the Medical Uses of Isotope (ACMUI) Fall 2022 Meeting Handout (Revised) ML22326A2222022-11-23023 November 2022 Future of the National Materials Program Working Group Public Meeting: Presentation ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML22308A0502022-11-0303 November 2022 Presentation 2 Chapman NRC Background Slides Nov 3 2022 Discrete Radioactive Particle (DRP) Workshop ML22308A0512022-11-0303 November 2022 Presentation 3b Parks DRP Exposure Scenarios November 3, 2022 DRP Workshop Presentation ML22301A1612022-10-28028 October 2022 Discussion Questions for DRP Workshop ML22286A0712022-10-25025 October 2022 Harmonization of Transportation Safety Requirements with International Atomic Energy Agency Standards (Rin 3150-AJ85; NRC-2016-0179); Public Meeting Presentation ML22272A0402022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1D Part 53 Framework B Through Part 171 Rule Language ML22272A0362022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1A Preamble (E.G. Statements of Consideration) ML22272A0382022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1B Section-by-Section, Backfit and Issue Finality, and Availability of Guidance Documents ML22272A0392022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - SECY-23-XXXX Enclosure 1C Part 2 Through Part 53 Framework a Rule Language ML22272A0422022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DG-1413 Technology-Inclusive Identification of Licensing Events for Commercial Nuclear Plants ML22272A0452022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DG-1414 Alternative Evaluation for Risk Insights (Aeri) Methodology ML22272A0472022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DRO-ISG-2023-01 Operator Licensing Programs ML22272A0492022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53 - DRO-ISG-2023-02 Guidance for Assessing Exemption Requests from the Nuclear Power Plant Licensed Operator Staffing Requirements Specified in 10 CFR Part 50.54 ML22272A0512022-09-29029 September 2022 10/18-19/2022 ACRS Public Meeting - Predecisional - Documents to Support Part 53- DRO-ISG-2023-03 Development of Scalable Human Factors Engineering Review Plans ML22238A2542022-08-31031 August 2022 Slides - Reporting Events and Event Trending, 2022 Annual OAS Meeting ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22112A1042022-04-0505 April 2022 NRC Staff Medical Event Slide, April 5, 2022, FY21 ML22094A1022022-04-0505 April 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Spring Meeting 2022 Revised Handout ML22089A1892022-04-0505 April 2022 Advisory Committee on the Medical Uses of Isotopes (ACMUI) Spring Meeting 2022 Handout ML22137A3232022-04-0505 April 2022 NRC 2022 and ACMUI 2021 Medical Event Summary Presentations ML22097A1412022-03-24024 March 2022 Part 53 Rulemaking - Advanced Reactor Applications Presentation on March 24, 2022 ML22097A1312022-03-23023 March 2022 Decommissioning Rulemaking Presentation on March 23, 2022 2024-08-29
[Table view]Some use of "" in your query was not closed by a matching "". Category:Slides and Viewgraphs
MONTHYEARML24297A0112024-10-23023 October 2024 Meeting on Section 205 of the Advance Act: Fusion Energy Regulation ML24226A4582024-08-29029 August 2024 Financial Assurance Requirements for Disposition of Category 1-3 Byproduct Material Radioactive Sealed Sources Handout August 29 2024 Meeting ML24229A0942024-08-19019 August 2024 8-19-24 Meeting with NEI on Pirts - NRC Slides Final ML24207A0262024-08-13013 August 2024 Publicmeeting_Presentation for August_14_2024--FusionMachines_ProposedRule ML24192A1272024-07-10010 July 2024 Scale and Melcor non-LWR Fuel Cycle Demonstration Project - MSR ML24149A1882024-06-0505 June 2024 ACMUI June 5 2024 Meeting Handout ML24086A5442024-03-14014 March 2024 RIC 2024 TH24 Intro/Closing Slides on Navigating the Future of Fusion ML24040A1722024-03-12012 March 2024 RIC 2024 T4 Slides - Jlubinski Chair Intro Remarks ML24075A1722024-02-22022 February 2024 Attachment 1 - NMMSS Trtr Presentation ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23355A1442024-01-17017 January 2024 January 17, 2024 Public Meeting Presentations - Fusion Systems Rulemaking ML23258A1802023-11-0909 November 2023 November 9, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23296A1992023-11-0808 November 2023 Cumulative Effects of Regulation Public Meeting (11/08/2023): Renewing Nuclear Power Plant Operating Licenses – Environmental Review (Rin 3150-AK32; NRC-2018-0296) ML23258A1712023-11-0101 November 2023 November 1, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23258A1472023-10-11011 October 2023 October 11, 2023 Public Meeting Presentation--Fusion Systems Proposed Rule ML23241A9492023-09-0606 September 2023 09-06-2023 Rulemaking: Proposed Rule: Public Meeting Slides - ASME 2021-2022 Code Editions Proposed Rule ML23240A7182023-08-29029 August 2023 Slides - Public Meeting on Regulatory Basis for Rb-82 Generators, Emerging Medical Technologies, and Other Medical Use of Byproduct Material ML23191A1532023-07-12012 July 2023 – Public Meeting Presentation -- Proposed Rule: Regulatory Framework for Fusion Energy Systems ML23200A3452023-06-20020 June 2023 National Organization of Test, Research, and Training Reactors 2023 Annual Conference Presentation by Jack Parrott on Decommissioning ML23186A0212023-06-0808 June 2023 Spent Nuclear Fuel Shipments in the Us: Addressing the Myths ML23123A3292023-06-0606 June 2023 SGI Training ML13108A326 ML23123A3322023-06-0606 June 2023 SGI Pamphlet ML23130A0332023-05-11011 May 2023 NRC Presentation Browns Ferry Subsequent License Renewal Pre-application Meeting, Environmental Overview ML23062A7352023-04-14014 April 2023 Tanana Chiefs Conference 2023 Annual Convention NRC Presentation ML23102A0522023-04-12012 April 2023 Meeting Slide: Information Meeting with Federally-Recognize Tribes Regarding the Proposed Rule Renewing Nuclear Power Plant Operating Licenses – Environmental Review ML23137A0442023-04-11011 April 2023 April 11, 2023, Presentation to NOAA Narw Northeast U.S. Implementation Team - North Atlantic Right Whale and NRC Endangered Species Act Consultations ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML23069A0132023-03-10010 March 2023 Pubic Meeting Slides - Proposed Rule: Renewing Nuclear Power Plant Operating Licenses - Environmental Review (Rin 3150-AK32; NRC-2018-0296) ML23019A0122023-01-19019 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Awareness Training for NRC & Agreement State Inspectors ML23012A2302023-01-12012 January 2023 Inspection Manual Chapter 2602 and Associated Inspection Procedures Public Presentation - Decommissioning Fuel Cycle, Uranium Recovery & Materials Inspection Program ML23006A0232022-12-15015 December 2022 NEIs Presentation for the December 15, 2022 Spent Fuel Priorities Meeting with NEI ML22326A2222022-11-23023 November 2022 Future of the National Materials Program Working Group Public Meeting: Presentation ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML22308A0512022-11-0303 November 2022 Presentation 3b Parks DRP Exposure Scenarios November 3, 2022 DRP Workshop Presentation ML22308A0502022-11-0303 November 2022 Presentation 2 Chapman NRC Background Slides Nov 3 2022 Discrete Radioactive Particle (DRP) Workshop ML22301A1612022-10-28028 October 2022 Discussion Questions for DRP Workshop ML22286A0712022-10-25025 October 2022 Harmonization of Transportation Safety Requirements with International Atomic Energy Agency Standards (Rin 3150-AJ85; NRC-2016-0179); Public Meeting Presentation ML22238A2542022-08-31031 August 2022 Slides - Reporting Events and Event Trending, 2022 Annual OAS Meeting ML22203A0192022-08-30030 August 2022 Patient Release Brochure Medical-Chinese Language ML22203A0202022-08-30030 August 2022 Patient Release Brochure Medical-French Language ML22203A0212022-08-30030 August 2022 Patient Release Brochure Medical-Spanish Language ML22221A1402022-08-10010 August 2022 Enclosure 2 - SGI Awareness Training ML22221A1412022-08-10010 August 2022 Enclosure 3 - Protection of SGI Pamphlet ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22137A3232022-04-0505 April 2022 NRC 2022 and ACMUI 2021 Medical Event Summary Presentations ML22112A1042022-04-0505 April 2022 NRC Staff Medical Event Slide, April 5, 2022, FY21 ML22088A2252022-03-30030 March 2022 Kairos Environmental Audit Closeout Meeting Presentation ML22097A1412022-03-24024 March 2022 Part 53 Rulemaking - Advanced Reactor Applications Presentation on March 24, 2022 ML22097A1312022-03-23023 March 2022 Decommissioning Rulemaking Presentation on March 23, 2022 2024-08-29
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Public Meeting on Requests for Exemption from a Reporting Requirement December 10, 2019 1
Agenda
- Comments and Questions - Everyone
2
Objectives
- Discuss NRC feedback on the requests
- Review a possible alternative approach
3
Background
Three applications were received for exemption from the reporting requirement for unplanned contamination events in 10 CFR 70.50(b)(1):
Background
The requirement in 10 CFR 70.50 states -
- (b) Each licensee shall notify the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the discovery of any of the following events involving licensed material:
- (1) An unplanned contamination event that:
- (i) Requires access to the contaminated area, by workers or the public, to be restricted for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by imposing additional radiological controls or by prohibiting entry into the area;
- (ii) Involves a quantity of material greater than five times the lowest annual limit on intake specified in Appendix B of §§ 20.1001-20.2401 of 10 CFR part 20 for the material; and
- (iii) Has access to the area restricted for a reason other than to allow isotopes with a half-life of less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to decay prior to decontamination.
5 5
Proposed License Condition The licensee is exempt from reporting unplanned contamination events inside an established contamination controlled area. The licensee commits to the following:
- 1. Post contamination controlled areas that are inaccessible to the public.
- 2. Impose controls to keep exposures and releases ALARA.
- 3. Ensure radiation protection personnel are readily available.
- 4. Provide equipment and facilities for contamination control.
- 5. Perform surveys and provide records upon request.
- 6. Train unescorted workers on methods to reduce exposures and respond to upset conditions.
6 6
NRC Feedback
- 1. Lost opportunity to promptly evaluate whether the event and the extent of condition is understood.
- 2. Inconsistent with previous finding that reports are necessary to ensure contaminated areas are being decontaminated in a safe and timely manner.
- 3. Burden of reporting (considered low) may not justify risk of missing a significant event (potentially high).
- 4. It may be difficult to identify event records mixed with large volume of routine contamination surveys.
- 5. The NRC would lose some operational data.
7 7
Alternative Approach We are open to an alternative which addresses NRC concerns listed on Slide 7.
- Event occurs in contam controlled area.
- Release has been stopped.
- No contam spread outside area.
- Additional controls imposed for longer time period before reporting.
- Basis for finding that alternative is in the public interest.
8 8
Next Steps
- 1. Licensees decide how they wish to proceed.
- a. Commitment to alternative reporting requirement would be processed as separate license amendment action.
- b. Amendment would have opportunity to request a hearing.
- 2. NRC prepares meeting summary.
9 9
Comments and Questions 10 10