MONTHYEARML24257A1482024-09-18018 September 2024 SAMA Workshop Slides (ML24257A148) ML24261A2672024-09-17017 September 2024 SAMA Workshop Slides - NEI Presentation (ML24261A267) ML24232A0722024-08-21021 August 2024 NRC Staff Slides for PWROG Rmc Meeting August 2024 ML24215A3442024-08-0606 August 2024 2024 NEI RP Forum - NRC Presentation (ML24215A344) ML24173A1932024-06-27027 June 2024 26 - Risk-Informed Decision Making (RIDM) Relating to Risk-Informing Material Assessment (Rima) Issues: Perspectives from a PRA Practitioner, NRC Presentation Slides ML24162A2452024-06-12012 June 2024 Information Public Meeting 2 - DG-1425 (Update to RG 1-183 Revision 1) Slides - June 12 2024 - Final ML24110A0032024-04-24024 April 2024 NRC Staff Slides for PWROG Rmc Meeting April 2024 ML24108A1742024-04-18018 April 2024 Pcc - SDP Workshop Meeting - 18 Apr 24 - Rev.0 ML24080A1752024-03-21021 March 2024 NRC Presentation to the Bi-Monthly Annex 3 Extended Sub-Committee Meeting - March 2024 ML24008A2112024-01-25025 January 2024 Evaluation of Seismic Risk for V. C. Summer Under the Process for Ongoing Assessment of Natural Hazard Information (Poanhi) - January 25, 2024 (Slides) ML24002B0812024-01-0202 January 2024 RG 1-183 Public Workshop (1of 3) Project Plan and RG Process Slides - ML24002B081 ML24051A1562023-12-0606 December 2023 Final NRC Staff Slides for PWROG Rmc Meeting December 2023 Revised Slide Format - Wo Notes ML23254A3882023-09-11011 September 2023 NRC Risk Forum Public Meeting Presentation Slides ML23271A0062023-08-16016 August 2023 NRC Staff Slides for PWROG Rmc Meeting August 2023 ML23150A0432023-05-17017 May 2023 18 - Closing (NRC) ML23150A0302023-05-17017 May 2023 2a - LIC-504 ML23150A0312023-05-17017 May 2023 2b -Information Notice ML22299A0912022-10-26026 October 2022 Post-fire-SMiRT-Weerakkody-Final ML22208A2882022-07-27027 July 2022 2022 NEI RP Forum Slides - Hq Update ML22119A1162022-04-27027 April 2022 Risk Management Committee Meeting - PWROG Meeting: April 2022 ML22080A2582022-03-10010 March 2022 RIC 2022 TH21 NRC Extreme Weather Presentation ML22061A1042022-02-15015 February 2022 4A-4_of_4-Leech-DAEC_LIC504_for_PFHA_Workshop-SLIDES ML22031A2562022-01-31031 January 2022 PRA Configuration Control Workshop_Feb 2022_Final ML21341B3362021-12-13013 December 2021 DAEC-IRS-121321 ML21291A1832021-10-18018 October 2021 HEAF - LIC-504 ML21172A2342021-06-22022 June 2021 RISC - June 2021 - Rev.1 ML21167A1372021-06-21021 June 2021 3 - Risk-Informing Security ML21167A1042021-06-16016 June 2021 6 - PRA Acceptability - Future Oversight of Risk-Informed Initiatives ML21167A1542021-06-16016 June 2021 4 - Risk-Informed Process for Evaluations ML21162A0312021-06-11011 June 2021 DRA-ISG-2021-XX NRC Public Meeting Presentation 06152021 ML21159A2232021-06-11011 June 2021 Public Meeting Between NRC & NEI Migration to RG 1.200 Revision 3 for Existing Risk-Informed Applications June 11, 2021 ML21131A2422021-06-0303 June 2021 NRC Staff Slides for June 3, 2021 Public Meeting to Discuss TSTF-505 ML21161A3502021-05-0505 May 2021 Staff Slide Presentation to ACRS on RG 1.189 Rev 4 & RG 1.205 Rev 2 ML21078A0942021-03-0808 March 2021 RIC 2021 - W20- Antonios Zoulis - Slide Deck 2 - Inspecting Risk-Informed Initiatives ML20352A2112020-12-17017 December 2020 Hq Isoe ALARA Presentation Slides 01-05-2021 ML20338A2502020-12-14014 December 2020 FLEX in Risk Informed Licensing Presentation ML20338A2402020-12-14014 December 2020 Applying Risk Insights to 10 CFR 50.59 & IMC 0335 Development - Presentation ML20338A2542020-12-14014 December 2020 HEAF Involving Aluminium Components - Presentation ML20338A2692020-12-14014 December 2020 RIPE Presentation ML20310A2772020-11-0505 November 2020 Safety Risk Metrics for Light Water Reactors and Advanced Light Water Reactors Presented at Institute of Nuclear Material Management Conference on Risk-Informing Security Using Safety Risk Information ML20289A6942020-10-0808 October 2020 Enclosure 7 - NRC Presentation on NRCs Audit Results for the PWROGs FLEX Data Collection and Analysis Report ML20289A6782020-10-0808 October 2020 Enclosure 5 - NRC Presentation on Credit for FLEX in Risk-Informed Licensing Applications ML20269A3592020-09-25025 September 2020 Weerakkody-Stutzke-USA-NRC Technical Meeting on the Enhancement of Methods, Approaches and Tools for Development and Application of Probabilistic Safety Assessments, September 29th - October 2, 2020 ML20267A1982020-09-23023 September 2020 Michelle Kichline - ACRS 9-23-20 - Expert Elicitation Presentation - Final Clean ML20206K8562020-08-12012 August 2020 Final NRC Presentation for 2020 NEI RP Forum ML20220A2912020-08-0606 August 2020 Risk-Informed Process for Evaluations Process Public Meeting August 2020 ML20181A3932020-06-30030 June 2020 Risk-Informed Licensing Reviews Presentation (1) ML20181A3672020-06-29029 June 2020 Crediting FLEX Presentation ML20181A4082020-06-29029 June 2020 Risk-Informed Process for Exemptions Presentation ML20112F2802020-04-21021 April 2020 NRC Review of Seismic Risk Assessment in Hope Creek 50.69 LAR - PRA Licensing Branch C, Division of Risk Assessment, Office of Nuclear Reactor Regulation - May 4, 2020 2024-09-18
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Self-Approval Thresholds for NFPA 805 -NRC Staff Comments Per RG 1.205, the maximum total risk increase above the compliant NFPA 805 plant is 2 times the RG 1.174 risk increase guidelines (1X guidelines for transition, 1X guidelines for post transition).
Per NFPA 805 2.4.4.1 Risk Acceptance Criteria, the cumulative effect of all differences between the deterministic requirements and the proposed FPP changes shall be evaluated and meet the change in risk criteria acceptable to the staff.
- Some individual FPP changes have no more than a minimal risk impact and therefore need no quantitative risk evaluation.
- For individual FPP changes that have more than a minimal risk impact, staff allows self-approval if quantitative impact is CDF < 1E-07; LERF < 1E-08.
12/3/2019 NRC Presentation for Public Meeting on Fire PRA/NFPA 805 1
Self-Approval Thresholds for NFPA 805 (cont.)
Per RG 1.205, the NRC chose risk acceptance criteria low enough to provide reasonable assurance that the effect of [multiple] self-approved changes on the cumulative risk would be acceptable.
Changes in risk that exceed the self-approval guidelines require:
- A license amendment request for prior staff approval, and
- the evaluation of cumulative risk of all previous fire protection program changes since adopting NFPA 805 for comparison with RG 1.174 risk guidelines.
All proposed changes must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins.
12/3/2019 NRC Presentation for Public Meeting on Fire PRA/NFPA 805 2
NFPA-805 License Condition Text
- Prior NRC review and approval is not required if the change results in a risk increase less than 1 E-7 /yr.
for core damage frequency and less than 1 E-8/yr. for large early release frequency. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.