ML19336A313

From kanterella
Jump to navigation Jump to search
Forwards LER 80-079/03L-0
Date released: 12/16/2019 Download: ML19336A313


LER 80-079/03L-0:on 800920,normalized Axial Power Distribution Exceeded Limit by 0.8%.Caused by Rods Driven 213 Steps in Preparation for Flux Mapping at 211 Steps Resulting in Delta Flux Becoming Negative.Rods Withdrawn
ML19336A314
Person / Time
Site: North Anna 
Issue date: 10/16/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19336A314 (2)
Forwards LER 80-079/03L-0
ML19336A312
Person / Time
Site: North Anna 
Issue date: 10/16/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19336A312 (1)