Advises That Util Response to NRC Evaluations of SEP Topics Will Be Submitted Prior to 801231.Manpower Limitations Due to Work on Electrical Equipment Qualifications Prevent Development of Detailed Comments by Requested Date
ML19336A305
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/24/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-03-10.A, TASK-05-11.A, TASK-06-07.C1, TASK-08-02, TASK-08-03.B, TASK-08-04, TASK-3-10.A, TASK-5-11.A, TASK-6-7.C1, TASK-8-2, TASK-8-3.B, TASK-8-4, TASK-RR NUDOCS 8010220468
Download: ML19336A305 (2)


Text

__

P '

r-CDilSilm8TS

.'D i fD C 'O T

'M n

l A

y powar-

'j a Wyu 5

Company Genere4 Officas 212 West Michigan Avenue. Jockeon. Michigan 40201 + (517179843660 Ceptember 24, 1980 Director, 5 clear Reactor Regulation

/

Att Mr Dennis M Crutchfield, Chief Cperating Projects 3rsneh No 5 US Nuclear Regulatory C - 4selon

'Jashington, DC 20555 DCCKET 50-155 - LICE:ISE DPR BIG ROCK ?OINT PLAT 2 - SEP TCPICS III-10.A, V-ll.A, VIII-3.3, VI-7.C.1, V~II-2 AND VIII L RES?CNSE

References:

(1) DMCrutchfield letter to DFHoff=an dated July 1, 1980 (2) DMCrutchfield letter te DPHoffhan dated July 3, 1980 (3) OMCrutchfield letter to DFHoffhan dated August 20, 1980 (h) DMCrutchfield letter to DPHoffhan dated August 28, 1980 References (1) through (k) transmitted current NRC evaluations of the referenced (Big Rock Point) SEP topics to Consumers Fever Oc=pany for review. These topics are III-10.A

" Thermal Overload Protection for Motors of Motor-Operated Valves",

V-11.A

" Electrical, Instrumentation and Control Features for Isolation of High and low Pressure Systems", VIII-3.3 "DC Power System Sus Voltage Monitoring and Annunciation", VI-T.C.1

" Independence of Redundant Cnsite Power Systems",

VIII-2 "Onsite Energency ?cver Systems - Diesel Generator" and VIII h "Elec-trical Pecetrations of Reacter Containment". All of the letters required that ec=ments be provided to the :IRC vithin h5 or 60 days of receipt. A preliminar/

review indicates that Consumers Power Company vill have substantive ec==ents en several of these evaluations.

However, manpover li=itations resulting frem our verk on Electrical Iquipment 0,ualifications have prevented us frcm developing detailed cec =ents by the dates requested. This manpover limitation will continue for the next two months.

We, therefore, do not expect to provide responses to the referenced letters before early December, but vill transmit prior to December 31, 1980.

r h

'jll2O f

6 Cavid ? Hoffhan 0

I b IIuclear Licensing Administrator A

CC Director, Regicn !!!, US7RC NRC Resident I'spector - Big Rock Point n