ML19332G318

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1989 for VC Summer Nuclear Station Unit 1.W/891214 Ltr
ML19332G318
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/30/1989
From: Bradham O, Haltiwanger J
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8912210055
Download: ML19332G318 (5)


Text

  • < ,

o f.M

, / ,

couth Cet una Dectric & Ola Conipiny ; 3 . r m

.. Jenkinsvitte, SC 29065 Nuclear Operations -

f R, . , (803) 345-4040 U ~ ..' SCE&G '

saman, i

December 14, 1989 Document Control Desk U.'S. Nuclear Regulatory Commission Washington, DC 20555

- Attention: Mr. Learned W. Barry

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 November Monthly Operating Report Gentlemen:

Please find enclosed the November 1989 Monthly Operating Report for the Virgil

'C. Summer Nuclear Station Unit No. 1. This submittal is made'in accordance with

the. requirements of. Technical Specifications, Section 6.9.1.10.

If there are, any questions, please call me at your convenience.

Very truly yours,

  • M l 0. S. Bradham DCH/JWH/OSB: led

' Attachments c: D. A. Nauman/0. W. Dixon, Jr./T. C. Nichols, Jr.

E. C. Roberts l' W..A. Williams, Jr. J. B. Knotts, Jr.

E S. D. Ebneter J. W. Flitter J. J. Hayes, Jr. INP0 Records Center General Managers ANI Library e C. A. Price Marsh & McLennan R. B. Clary NPCF K. E. Nodland NSRC J. C. Snelson RTS (RG 890002)

R. L. Prevatte File (818.03-1) 0912210055 89113o

{DR ADOCK 05000395 PDC

-V' a v.. -

- , - , ,. . . + + - . .. y --

I

.o Document Control Desk November Monthly Operating Report Page 1 i- ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL ,

!. DOCKET NO.: 50/395 UNIT: V. C. SUMMER I DATE: 12/01/89 .

COMPLETED BY: J. W. HALTIWANGER TELEPHONE: (803)345-4297 NOVEMBER 1989 -

l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL .

(MWe-Net) (MWe-Net)

1. 881 17. 880
2. 880 18, 88?
3. 881 19, 883 4, 882 20, 883 5, 882 21. 883 6, 882 22. _ 882
7. 881 23. 883
0. 882 24 __

882

9. 882 25. _, 883 10, 882 26. 884 11, 882 27, 83 3 12, 883 28. BE3 _
13. 882 29. 8'/5
14. 882 30. 881 15, 881
16. 881 i

(

~

[:.  ;

o +

l l:

i

' Document Control Desk

  • November Monthly Operating Report Page 2 ATTACHMENT II ,

OPERATING DATA REPORT DOCKET NO.: 50/395 UNIT: V. C. SUMMER I DATE: 12/01/89 COMPLETED BY: J. W. HALTIWANGER TELEPHONE: (803) 345-4297 OPERATING STATUS 1 Reporting Period: November 1989 Gross Hours in Reporting Period: 720 2.CurrentlyAuthorizedPowerLevel(MWt): 2775 Max. Depend. Capacity (MWe. Net): 885 Design Electrical Rating (MWe Net): 900

3. Power Level to Which Restricted (If Any)(MWe Net): N/A
4. Reasons for Restrictions: !@

THIS MONTH YR TO DATE CUMULATIVE

5. Number of Hours Reactor Critical 720.0 65tk 9 38571.5
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hourt Generator on Line 720.0 6378.7 37741.4
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.GrossThermalEnergyGenerated(MWH) 112.6106 15652633 98505131
10. Gross Electrical Energy (MWH) 5107110 3?S92259
11. Net Electrical Energy Generated (MWH)_661680

_634864 4833134 30885428

12. Reactor Service Factor 100.0 81.8 75.4
13. Reactor Availability Factor 100.0 81.8 75.4
14. Unit Service Factor 100.0 79.6 _ ' 73.8
15. Unit Availability Factor 100.0 79.6 73.8 99.6 68.1 68.2
16. UnitCapacity
17. Unit Capacity Factor Factor (Using (Design MWeMDC)) 98.0 67.0 67.1
18. Unit Forced Outage Rate 00 20.4 9.1 19.ShutdownsScheduledOverNext6 Months (Type,Date&DurationofEach):

Refuelino March 23. 1990. 65 Days

20. If Shut Down at End of Report Period, Estimated Date of Startup:

N/A

21. Units in Test Status (Prior to Commercial Operation): N/A 1

, , i l

I l

Document Control Desk  !

November Monthly Operating Report j Page 3 J

l I

ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS l 1

I DOCKET NO.: 50/395 UNIT: V. C. SUMMER I DATE: 12/01/89 COMPLETED BY: J. W. HALT!WANGER i TELEPHONE: (803) 345-4297 F

NOVEMBER 1989 Method of TYPE Shutting No. Date F or S Duration Reason Down the Corrective Actions / 1 Forced or (Hours) Reactor or Comments '

Scheduled Reducing Power None l

l L

A l

.. _ _. __ _ _ _ _. . _ _ . - . - ~ . _ - _ . . - . . . . . . _ ._ _ _ _ _ _

o

_ .i , .

i Document Control Desk b . November Monthly Operating Report Page 4 l

ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50/395

>- UNIT: V. C. SUMMER I DATE: 12/01/89 COMPLETED BY: J. W. HALT 1WANGER TELEPHONE: (803) 345-4297 NOVEMBER 1989 The Virgil C. Summer Nuclear Station operated at approximately 100 percent power for the entire month of November.

l

\ i i

L l