Monthly Operating Repts for Nov 1989 for Beaver Valley Power Station,Units 1 & 2
ML19332G040
Person / Time
Site: Beaver Valley
Issue date: 11/30/1989
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8912200067
Download: ML19332G040 (9)


Text

1

'Af sciennon, m eisea-sooo Nucle =at Group P O Don 4 Shipp #igport FA 150M404 Dooamber 7, 1989 i

Beaver Valley Powcr Station Unit 1 - Ibchet flo. 50-334, License 110. DPR-66 L

Unit 2 - Ibcket llo. 50-412, License 110. IIPF-73 t-Monthly Operatim Rerort 1.

U. S. Ifuclear Regulatory Comnission Wmwint Control Desk Washirgton, D.C.

20555 Gentlemen:

In accortlance with Appendix A,

'Ibchnical Specifications, the Monthly Operatirg Report is submitted for Unit 1 and Unit 2 for the month of 11ovember, 1989.

Very truly yours, A.

. D. Sieber ice President 11uclear Group MAW /ing Enclosures oc: liRC Regional office King of Prussia, PA l

y%$

I l

8912200067 891130 l

PDR ADOCK 05000334 n

rpm 10

p t.

laRIRTIVE StM%RY OF

\\

!OCHLY OPERATING D:PERIDiCC UMI NOVDiBER 1989 Nwamber 1 he Unit remained in Mode 5 for the unit's Seventh Refuelity through Outage.

Nwember 10 Nwamber 11 he Unit remained in Mode 5 for a mainterance outage to

_thiw gh repair the Unit's recirculation spray heat exchangers.

Nwember 26 Nwanber 27 2e Unit remained in Mode 5 to perfom leak testing of the through Unit reactor containment building ard to perform other Nwamber 30 planned refueling activities.

l l

l

AVERAGE IAILY UNIT REY:R LEVEL Docket No.

50-334 Unit BVPS Unit 1 Date December 7.

1989 Cartpleted by M. A. Wirner hie @one _(412) 393-7621

)Cim{

Novanhar 1989 DAY AVERAGE [AILY POWER ILVEL DAY AVERAGE IAILY KMER 11 VEL (MWe-Net)

(MWe-Net) 1 0

17 0

l 2

0 18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

1 15 0

31 N/A 16 0

1 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Ca pute to the nearest whole megawatt.

l l

p

__.,-q--

.tMIT SMUTDOWuS A40 POWEJ # EDUCTIONS Docket so.

50-334 Unit Wome SWPS tmit #1

~

Date December T. 1999 Completed 9y W.A. Winner REPORT NOWTM 40VE#8E # 1989 Yeiephone t412) 393-7621 method cf Licensee Cause & Corrective Duration shutting Event Systee Component Action to No.

Date Typel (Mours)

Reason 2 Down Reactor 3 eeport i Code 4 Cede 5 Prevent securrence 37 891101 S

240 C

4 m/A aC FUELut The Unit reemined shutdown for its it's Seventh Refueling Outage.

38 891111 F

384 8

4 w/A Ss NTENCn The tmit remained shutdown to repeir the

'D' recirculatiomApray heat enchanger.

39 891127 5

96 4

W/A SR VESSEL The tmit remeined shutdown for Containment Type

'A' teak testing.

1 2

3 4

F-Forced Reason:

Method:

Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Emplain) 1-Manual Preperation of Data Entry Sheets 8-maintenance or Test 2-manual Scree for Licensee Event neport (tEW) File C-Refueling 3-Automatic Scres (eUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & ticense Esee 5-meduction 5

F-Administrative 9-Other Exhibit I-Same Source.

G-Operatiersi Error (Esplain) h-Other (Emptain.4

l I

OPERATING DATA REPORT DOCKET NO.:

50 334 REPORT DATE:

12/07/89 COMPLETED BY: M.A.VINGER TELEPHONE:

(412) 393 7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: NOVEMBER 1989
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPIATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Not MWe):

None

10. REASONS FOR RESTRICTIONS IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 8016.0 119088.0

12. NO OF HRS. REACTOR WAS CRITICAL:

0.0 5738.8 71989.7

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

0.0 5722.3 70366.3

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

0.0 12651193.0 165997551.5 174 GROSS ELECT. ENERGY GEN. (MWH):

0.0 4053450.0 53246789.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

3000.0 3782000.0 49690390.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0 71.4 61.3
20. UNIT AVAIJABILITY FACTOR:(PERCENT) 0.0 71.4 61.3
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 58.2 54.5
22. UNIT CAPACITY FACTOR.(DER): PCT 0.0 56.5 52.9
23. UNIT FORCED OUTAGE RATE: (PERCENT) 100.0 8.3 17.5
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: DEC.16.1989
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

i*

IARRATIVE StM %RY OF r

itNIHLY OPERATING EXPERIDJCI t

?

UNIT II i

ICVDGER 1989 Hwanbar 1

'Ihe Unit operated at a nominal value of 100% output.

through November 30 e

a

?

i l

t a

l l

l l

l l

l l

P 4

a tMIT SnuiDOWuS Ae9 70 Wit REDUCTIces Docket #o.

50-412 thit #see _SVPS Unit #2 Dete.9ecember T. 1999 Completed By W.A. v6neer REPORT N04TN WOVE #8ER 1989 Yeiep8Hme (6121 393-1621 Method of Licensee Cause & Corrective Duretion Shutting Event Systee Component Action to No.

Date Typel (Nours)

Reason 2 Down Reector3 Report 8 Code 4 Code 5 Prevent Recurrence NONE 1

2 3

4 F-Forced Reason:

Method:

Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Monuel Preparation of Oate Entry Sheets 8-Maintenance or Test 2-Manual Scree f or Licensee Event Report (LER) File C-Refueting 3-Autoestic Scree (wuRE50161).

0-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Emae S-Reduction 5

F-Administrative 9-Other Exhibit 1-Some Source.

G-Operational Error (Emptair,)

H-Other (Explain)

i, j.

[

AVERAGE IAILY UNIT KMER IIVEL

?

I Docket No.

50-412 Unit BVPS Unit 2 Date December 6, 1989 Cortpleted by M. A. Wirner Telephone f412)393-7621 M2m!

Novembar 1989.

IAY AVERAGE IAILY POWER ILVEL IAY AVERAGE IAILY PCMER ILVEL

(!We-Net)

(MWe-Net) 1 811 17 815 2

816 18 811 3

811 19 815 4

815-20 811 5

811 21 815 6

815 22 819 7

811 23 815 8

815 24 811 9

815 25 807 10 815 26 811 11 815 27 807 12-815 28 811 13 811 29 811 14 807 30 815 15 811 31 N/A 16 815 INSITEJCTIONS on this format, list the average daily unit power level in !We-Net for each day in the reporting month. Cartpute to the nearest whole megawatt.

)

OPERATING DATA REPORT

~:

DOCKET NO.:

50 412 REPORT DATE:

12/07/89 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393 7621 OPERATING SI&Ig1

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes l
2. REPORTING PERIOD: NOVEMBER 1989
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross NWe):

923 i

5. DESIGN ELECTRICAL RATING (Not NWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Not MWe):

833

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe):

None

10. REASONS FOR RESTRICTIONS IF ANY:

N/A

(

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 8016.0 17871.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

720.0 5563.5 14812.8

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 l

14. HOURS GENERATOR WAS ON LINE:

720.0 5503.6 14682.9

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MWH):

1899581.0 13267789.0 36998729.4

17. GROSS ELECT. ENERGY GEN. (MWH):

616300.0 4241700.0 11871500.0 l

18. NET ELECTRICAL ENERGY GEN. (MWH):

585290.0 3977801.0 11192966.0 19, UNIT SERVICE FACTOR: (PERCENT) 100.0 68.7 82.2 l

20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 68.7 82.2
21. UNIT CAPACITY FACTOR (MDC): PCT 97.6 59.6 75.2 1
22. UNIT CAPACITY FACTOR (DER): PCT 97.2 59.4 74.9
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 12.4 7.0
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIKATED DATE OF STARTUP:
26. UNITS IN TEST STATVS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A l

COMMERCIAL OPERATION N/A N/A

. -