ML19332F859
| ML19332F859 | |
| Person / Time | |
|---|---|
| Issue date: | 12/07/1989 |
| From: | Lohaus P NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Matthews M ENERGY, DEPT. OF |
| References | |
| REF-WM-39 NUDOCS 8912190210 | |
| Download: ML19332F859 (4) | |
Text
-
[
3 DEC - 7 1983 c;
L Mr. Mark L. Matthews, Acting Project Manager
. Uranium Mill Tailings Project Office Albuquerque Operations Office Department of Energy-P.O. Box 5400' Albuquerque, New Mexico 87115 near Mr. Matthews:
-I received your November 6,1989 transmittel of revised VPMIM Directives #ES and #E7.
I have encicsed the completed response forms for these two revised directives.
I am also-transmitting the signed " Transmittal of Documents" form.
(SIGNED) PAULH.LOHAdd Paul H. Lchaus, Chief Operations Branch Division of Low-Level Waste Management and Decomissioning, HMSS
Enclosures:
As stated.
cc w/ enc 1:-
R. Hall, URF0 S. Mann, DOE /HQ NE-22 J. Garcia, DOE /AL C. Moore, JEG Distribution:
~
PLohaus, LLOB MFliegel, LLOB GGnugnoli, LLOB DGillen, LLOB EHawkins, URF0 RHall, URF0 JJones, LLOB r/f PDR NO O Category: Proprietary / / or CF Only
/~"7 l
1 l-ACHW YES LT_,7 -
N0 f* 7 SUBJECT ABSTRACT:
RESPONSE TO DOE ON UMTRAP VP CIRECTIVES fE5 & #E7.
0?h J
0FC :LLOB
- LLOB
/ :LLOB V :LLI M
- LLWM
- NM55
........N..../.......
J..........hl)............................
NAME:GG li/jj :DGN1
- MF1 egel
- PLohaus Date:12/7/89
- 12/
9
- 12
/89
- 12h)89 $))89 $))89 0FFICIAL RECORD COPY l
hy{l}
l.
8912190210 891207
- S"
/
@39 PDC
/
f
..s 4
i RESPONSE TO VPMIM DIRECTIVE #E 5-g-
Date:-' December 6,:1989 4
Comment 10riginator: Giorgio Gnugnoli, Project Manager
-Organization /-Telephone Number: USNRC/NMSS/LLWM/LLOB FTS 492-0578 u
COMMENTS
- 1.
All VP directives requiring NRC-concurrence.shouid be provided to both Paul Lohaus in NRC Headquarters in Washington, DC as well as to Ramon Hall of the URF0 Denver, Colorado regional'_ office. Your Novesber 20, 1989 transmittal incorrectly designated Giorgio Gnugnoli as the primary l
addressee. Please make this correction in your records, your staff's-L records, the TAC records, the RAC records and all other DOE-contractor and subcontractor records. Your pink original " Transmittal of Documents"
- form was properly transmitted with Paul Lohaus'- copy.
2.
As presented in your November 20, 1989 transmittal, the NRC staff concurs with the revised VPMIM Directive.
7
/
Signature: Giorgio Gnugnol M
o
'ym - -
Approvals: Myron Fliege 1Aem.E " -
g Paul Lohaus d
4M y
4 PLEASE RETURN WITH " TRANSMITTAL OF DOCUMENT" FORM
.......................................................s...r.................
FOR UMTRA P0 USE ONLY
[ ] COMMENTS REVIEWED AND INCORPORATED
[ ] COMMENTS REVIEWED AND NOT INCORPORATED
lc.
if RESPONSE TO VPMIM DIRECTIVE #E 7 Date: December 6, 1989 Comment Originator: Giorgio.'Gnugnoli, Project Manager Organization / Telephone Number: USNRC/ftlSS/LLWM/LLOB'. FTS 492-0578 COMMENTS
~
As presented in the November 20, 1989 transmittal, the NRC staff concurs with the revised'VPMIM directive.
Signature: Giorgio Gnugnoli. db.3 Approvals: Myron Flie Paul Lohaus N
v; M I
J
-===================================================================s.s========
PLEASE RETURN WITH " TRANSMITTAL OF DOCUMENT" FORM
=================================================================
FOR UMTRA P0 USE ONLY C0fWENTS REVIEWED AND INCORPORATED l
l COMMENTS REVIEWED AND NOT INCORPORATED
g M B G NEstN E N N C.
manussem essmanem 6
TR ANSMITTAL OF DOCUMENTS DATE SENT :
PAGE_.l 0F 1 CONTROL NUMBER NOV 20 W-
- 71 TO : Paul Lohaus FROM : Department of Energy =
NRC - HQ UMTRA Project Office 5301 Central Avenue NE, Suite 1720 Albuquerque; NM 87108 TYPE AND TITLE OF MATERIAL SENT :
Vicinty Properties Management and Implementation Manual -(VPMIM) Final Directives
- ES and #E7.
l
(
SPECIAL INSTRUCTIONS :
j Keep with VPMIM, Revision D of the same Document Control Number.
Keep with Final-VPMIM Directives #El, #E2, #E3, and #E4.
I DISPOSITION OF PREVIOUS VERSIONS :
t Destroy previous versions of the Directives #E5 and #E7.
These previous Directives were not offically transmitted using the Transmittal of Documents form.
1 ACKNOWLEDGMENT OF RECEIPT OF MATERIALS l
l ACKNOWLEDG ECElPT OF THE M ATERIAL LISTED ABOVE.
I have read the attached no and agree naintain this document in current status and notify the DOE and the L
TA an gng 1 ownership or disposition.
Y W aul H. Lohaus 12/ 7 /89
' 'SIG'NAT U RE DATE RETURN THIS FORM TO :
Carol M. Moore, Vicinity Properties Manager (505) 846-4030 Jacobs Engineering Group 5301 Central Avenue, Suite 1700 Albuquerque, NM 89 08 J EG-A L-Q A-11 ( 7 /8 5 )
- -