Requests Extension to 10CFR50.55a for Remaining Portion of First 10-yr Inservice Insp Exams,Per .Description of Exams Encl
ML19332F282
Person / Time
Site: Rancho Seco
Issue date: 11/17/1989
From: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Knighton G
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AGM-NUC-89-240, NUDOCS 8912140214
Download: ML19332F282 (2)


Text

y s

4

. g,-

i1 JSMU i

SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, P.o. Box 15830, Sacramento CA 95852 1830,(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA -

i

'AGM/NUC~89-240'.

j November' 17,-1989 L

1

_UL S. Nuclear Regulatory Commission I

Attn:. Document Control-Desk l

Hashington, DC -20555:

j lDocketNo'.50-312 m

Rancho Seco. Nuclear-Generating Station License NoDPR-54

~ EXTENSION REQUEST T0.10 CFR-50.55a FOR THE REMAINING PORTION OF THE FIRST--

p, TEN-YEAR INSERVICE INSPECTION (ISI) EXAMINATIONS j

i l

Attention: George Knighton s

L*

Reference:

SMUD To.NRC Letter Dated November 2, 1989, Extension Request To

.10 CFR -50.55a..For The Remaining Portion Of'The Ten-Year Inservice Inspection I

-(ISI) Examinations q

1.

1 i:

In the: referenced letter the District requested an extension for a period of time equal to the length of the current extended plant shutdown for those examinations e,

L

.not yet completed under the first Ten-Year ISI Program.

The three examinations.

q L

listed in the attachment tc this letter were identified as unperformed examinations 1

p that would be completed by November 30, 1989.

H('

The radiation exposure associated with performing the three examinations is not i

j

. justifiable at this time given the current extended outage. Therefore, the-l L

District requests an extension, pursuant to IHA-2400(c), for a time period i

equivalent to that of the current outage for those examinations listed on the attachment.

This request is an addition to the list of examinations for which an extension was requested in the referenced letter.

j l.

L In the current shutdown condition, there is minimal potential for a safety concern posed by deferring these ISI inspections since the affected systems are maintained at low temperature and pressure when compared to their design conditions.

Additionally.. the plant. will-not be brought above cold shutdown without prior NRC 4

concurrence regarding completion of the remaining inspections.

o i

i-Members of your staff with questions requiring additional information or

,Jo clarification may contact Steve Crunk at (209) 333-2935, extension 4913.

C!j i,.

,gg Sincerely, Q}

3tg

~s Eo Dan R. Keuter Assistant General Manager Nuclear No:

g[

No Attachment cc w/atch:

J. B. Martin, NRC, Halnut Creek A. D'Angelo, NRC, Rancho Seco RANCHO SECo NUCLEAR GENERATING STATION D 1444o Twin Cities Road, Herald, CA 95638 9799;(209) 333 2935 b

ra, 4

u:-

ay

/

@f".

7 L"' ic ATTACHMENT ~

i h

FIRST 10 YEAR ISI-EXAMINATIONS (o

ASME Section XI Item No!

Descriotion EKam Type Bl.11; One CRDM Bolts & Nuts VISUAL.

t Bl.18 Three Helds on One CRDM UT

/

B2.8.1 Four Pressurizer Lugs UT (HX, XY, Y & YZ Axes) 1; I

l L

l l

l l-l*

(

l-

!1' l

\\

j.

i

..