Notice of Violation from Insp on 891030-1103.Violation Noted:Failure to Identify & Perform post-installation Test to Prove Operability of Temporary Penetration Closure for Potential Conditions in Containment Bldg
ML19332F141
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/30/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19332F139 List:
References
50-382-89-29, NUDOCS 8912130456
Download: ML19332F141 (1)


Text

%.

J s

Y f

~

\\

i APPENDIX A p

NOTICE OF VIOLATION i

I Louisiana Power & Light Company Docket:

50-382 i

e<

Waterford Steam Electric Station,.

Operating License: NPF-38 Unit 3

,During an NRC inspection conducted on October 30 through November 3,1989, a L

violation of NRC requirements was identified. The violation involved a failure to provide adequate test control during the installation of a temporary

)

alteration in the containment boundary.

In accordance with the

Failure to Provide Adequate Test Control J

4 Criterion XI of 10 CFR Part 50, Appendix B, requires, in part, that all testing required to demonstrate that structures, systems, and components will perform satisfactorily in service is identified and performed in

)

accordance with written test procedures, which incorporate the' requirements and acceptance limits contained in applicable design E

documents.

m Contrary to the above, temporary alteration (TA) 89-22 was made during refueling outage three to provide temporary services through a containment building penetration. The licensee failed to identify and perform a l

post-installation test to prove operability of the temporary penetration-

' closure for the potential conditions in the containment building during

.the period of installation.

.F-This is a-Severity Level IV violation.

(SupplementI)(382/8929-0?)

Pursuant to the provisions of 10 CFR 2.201, Louisiana Power & Light Company is-l hereby required to submit to this office, within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:

(1) the reason for the violation if admitted.

(2) the. corrective steps which have been taken and the results achieved,

-(3) the corrective steps which will be taken to avoid further violations, and l

(4) the date when full compliance will be achieved. Where good cause is shown, consideration will.be given to extending the response time.

I Dated at Arlington, Texas, this # day of Ti m W 1989.

^

i 8912130456 891130 PDR ADOCK 050003B2 L.