Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 IR 05000382/19990081999-07-12012 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-08 Issued on 990503 ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 05000382/LER-1999-005, Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits1999-06-24024 June 1999 Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits ML20196G5731999-06-24024 June 1999 Forwards Operator Licensing Exam Outlines Associated with Exam Scheduled for Wk of 991004.Exam Development Is Being Performed in Accordance with NUREG-1021,Rev 8 ML20212J4121999-06-23023 June 1999 Responds to NRC Re Reconsideration of EA 98-022. Details Provided on Actions Util Has Taken or Plans to Take to Address NRC Concerns with Ability to Demonstrate Adequate Flow Availability to Meet Design Requirements ML20196E9371999-06-22022 June 1999 Forwards Revs Made to EP Training Procedures.Procedures NTC-217 & NTC-217 Have Been Deleted.Procedure NTP-203 Was Revised to Combine Requirement Previously Included in Procedures NRC-216 & NTC-217 ML20196A1021999-06-17017 June 1999 Provides Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Per 990513 Request of NRC Project Manager ML20195F3671999-06-0909 June 1999 Forwards Rev 21,Change 0 to EP-001-010, Unusual Event. Rev Reviewed in Accordance with 10CFR50.54(q) Requirements & Determined Not to Decrease Effectiveness of Emergency Plan ML20195C7801999-06-0303 June 1999 Submits Response to Violations Noted in Insp Rept 50-382/99-08.Corrective Actions:All Licensee Access Authorization Personnel Were Retrained Prior to Completion of Insp ML20195C2951999-05-28028 May 1999 Forwards Annual Evaluation of Changes & Errors Identified in Abb CE ECCS Performance Evaluation Models Used for LOCA Analyses.Results of Annual Evaluation for CY98 Detailed in Attached Rept,Based Upon Suppl 10 to Abb CE Rept ML20195C0241999-05-28028 May 1999 Notifies NRC of Operator Medical Condition for Waterford 3 Opertaor Sp Wolfe,License SOP-43723.Attached NRC Form & Memo Contain Info Concerning Condition.Without Encls ML20196L3281999-05-24024 May 1999 Informs That Entergy Is Withdrawing TS Change Request NPF-38-205 Re TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection Submitted on 980629 ML20206S4691999-05-17017 May 1999 Requests Waiver of Exam for SRO Licenses for an Vest & Hj Lewis,Iaw 10CFR55.47.Both Individuals Have Held Licenses at Plant within Past Two Year Period,But Licenses Expired Upon Leaving Util Employment.Encl Withheld 05000382/LER-1999-004, Forwards LER 99-004-00 Re Discovery That Response Time Testing Had Not Been Performed for ESFAS Containment Cooling Function,As Required by TS SR 4.3.2.31999-05-14014 May 1999 Forwards LER 99-004-00 Re Discovery That Response Time Testing Had Not Been Performed for ESFAS Containment Cooling Function,As Required by TS SR 4.3.2.3 ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206J1471999-05-0606 May 1999 Requests That Implementation Date for TS Change Request NPF-38-211 Be within 90 Days of Approval to Allow for Installation of New Monitoring Sys for Broad Range Gas Detection Sys ML20206J1721999-05-0606 May 1999 Notifies That Proposed Schedule for Plant 1999 Annual Exercise Is Wk of 991013.Exercise Objective Meeting Scheduled for 990513 at St John Baptist Parish Emergency Operations Ctr ML20206G8021999-05-0404 May 1999 Provides Revised Response to NRC Re Violations Noted in Insp Rept 50-382/99-01.Licensee Denies Violation as Stated.Change Made Is Denoted by Rev Bar & Does Not Materially Impact Original Ltr ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested ML20205T2531999-04-22022 April 1999 Forwards LER 99-S02-00,describing Occurrence of Contract Employee Inappropriately Being Granted Unescorted Access to Plant Protected Area ML20205R2611999-04-20020 April 1999 Forwards Rev 19 to Physical Security Plan,Submitted in Accordance with 10CFR50.54(p).Plan Rev Was Approved & Implemented on 990407.Rev Withheld,Per 10CFR73.21 ML20205Q3241999-04-16016 April 1999 Submits Addl Info Re TS Change Request NPF-38-215 for Administrative Controls TS Changes.Appropriate Pages from New Entergy Common QA Program Manual Provided as Attachment to Ltr 1999-09-07
[Table view] Category:STATE/LOCAL GOVERNMENT TO NRC
MONTHYEARML19332E9941989-12-0101 December 1989 Comments on Antitrust Issues Raised by Util Application to Amend OL for Plant.Commission Should Clarify That Antitrust Conditions in App C of Facility License Will Continue to Apply to Util ML19332E9921989-12-0101 December 1989 Submits City of New Orleans Comments in Response to Antitrust Issues Re Util Application to Amend OL ML20095E0091984-07-0505 July 1984 Requests NRC Safety Investigation Repts for Past 8 Months & Notification of Current Investigations.Info Needed to Determine Possible Financial Effect on State of Ak,Which May Need to Fund & Buy Energy from Facilities ML20071N5001983-05-27027 May 1983 Advises of No Adverse Effect Re Cultural Resources Described in Protection Plan on Areas 3 & 4 Re Plantation Overseers House & Plantation Workers Quarters,Respectively ML20028C2941982-12-30030 December 1982 Advises That Util 821122 Revised Environ Protection Plan Has No Adverse Effect on Areas 3 & 4 (Waterford Plantation Overseer House & Worker Quarters),Which Are Eligible for Inclusion in Natl Register of Historic Places ML20009A8511981-07-0101 July 1981 Concurs W/Des Re Protection from Disturbance of Cultural Areas 3,4 & 5 Until Eligibility Is Determined.Offers to Comment on Project Effect on Areas Deemed Eligible for Listing in Natl Register of Historic Places ML19296C5591980-02-14014 February 1980 Forwards Comments Re Environ Impact at Site.Due to Heavy Industrialization of Area,No Addl Visual Impact Anticipated. Likelihood of Finding Prehistoric Sites Low Due to Area Being in Backswamp.Suggests Literature Search ML20125D5751979-12-27027 December 1979 Responds to NRC 791206 Request for Review of Site for Cultural Resources.No Prehistoric Archaeological Sites or Natl Register of Historic Places Sites Recorded for Area. Recommends Cultural Resources Survey for Remaining Property ML19329C6981973-04-19019 April 1973 Responds to AEC Supplemental Answer to Cleveland,Oh Petition to Intervene & Request for Hearing.Certificate of Svc Encl 1989-12-01
[Table view] |
Text
.-. . - ._..
-gJ-
. L AW OrrtCES
. VERNER, LilPFERT, BERNHARD, McPHERSON AND HAND CHARTERCD sAmts u. vcaNcn* sAucs r Hiscv SUITE 7oo TraacNcrs uccAaTw uws e oAnoNce.
" ^
Os [LLY"po"f,7 9ol 15TH STREET N.W.' '
'#'[dc*n Tv"s""' ,aA,ugy,ioa *'A$o".
g gr.,. "o"'N s"'M[ "' * .
- ' oconoc u rooTc.sn* WASHINGTON. D.C. FoooS 23ot sncaay A ouian nicaAmo A ouca. .
' ^ * '" ""
$1"a 'E[."7= son - "IdA*"rli>cocn.sn*. (e02) 378 6ooo' rn'A.".[rs c"E LAuncNTis EIn$ti c$aNTew.
No","0T$uc - $"o^"s/20
- TELtxi soaie4 vcRLIP WSH [NCE ooptm' ".^EC R A
' ^* Iw"v [i$c'NSI,*((T TELtcopitR:(aoa) 371 e27e RPj[s , gp . Ac"[$.
- "c7A[Ls'noaInTs i ac s rE $$ ** covo Is'c"cwS"c'LrN
,oy,,,, o,,,cc Uw$c^.'Ac't NAU.su " $5E[nINE A J MEL R VNC LAL JR
L CV #CHAEL J T* OB K PAU C E LINC
==r
.ff " T,0'"..
==~~ Ho sT
,,x::,; y,,,,,,
7
= = . "'"
.. = : = ,s "T 2 ',*J.*d's."
s :"J.[A T=T -
A*f?c"*"N ROBERT W BLANCHEM VIRoiNIA orriCEs y y g
- g, ,;agr;,7t,,L A,,o so ~ = c ....o=rNs.o.oo,,1vt io.o. A A. sv.,0~o sT-cv MCLE AN, VIRolNIA 22:02 rAARrAA, VIRoiMA 22o30 nom . een
- o 0c my,, ,;,,,,, com u. oooo
, ",,' ^o",'m, o '",, ,
vics entsiotNT ron vettcopita po31T4.soa? vtttcorire: pos) ses Teas rtN/JdCE ANo ADMINISTRATION WNfTER S oiRECT DIAL NUMBER
._ (202) 371-6096 December 1, 1989
- Ms. Eileen M. McKenna ,
I Chief, Policy Development and l Analysis Staff,. Office of Nuclear Reactor. Regulation U.S. . Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20854 Re: ' Louisiana Power & Light Co., NRC Docket No. 50-382A, Comments on Antitrust Matters
Dear Ms. McKenna:
i l
1 1 Pursuant to the Commission's notice of November 1, 1989, 54 Fed. Reg. 46163, the City of New Orleans, Louisiana ("New Orleans") submits these comments with respect to the antitrust issues ~ raised by the application of Louisiana Power & Light Company ("LP&L")'to amend the operating license for the Waterford 3 Steam Electric Station Unit 3 ("Waterford 3"). In its application, LP&L proposes that its license-be amended to
-designate Entergy Operations, Inc. ("EOI"), a new management company not yet formed, as the licensed operator of Waterford 3.
For the reasons discussed below, it is New Orleans' position that the Commission should (1) clarify that the antitrust conditions set forth in Appendix C of the Waterford 3 license will continue to apply to LP&L and (2) direct that such conditions would' apply to EOI upon that company's assumption of the' role of licensed operator. This action would ensure the continued protection of the rights and interests of Louisiana
! entities engaging, or proposing to engage, in the sale and distribution of electricity, and would be in the public interest.
h
-M-
. a r- '
- ,- I
- 1. LP&L's Acolication-LP&L's applicationF is part of a plan of Entergy Corporation ("Entergy") that EOI operate the three nuclear. plants currently owned and operated by LP&L and two of its affiliates.
Entergy owns all of the common stock of these and other companies, and proposes to own all of the common stock of EOI.
LP&L states in its application that EOI, as agent for LP&L, would j assume operating responsibility for -- but not ownership of --
Waterford 3 through an operating agreement between the two companies. Appl. at 2. LP&L asserts that implementation of this proposal would not impact " existing plant ownership or entitlements to capacity or energy." Id.
The antitrust conditions in LP&L's license initially were implemented in LP&L's construction permit for Waterford 3 granted on November 14, 1974. The conditions were agreed to by LP&L after allegations of antitrust violations and lengthy proceedings and negotiations involving the Department of Justice and affected Louisiana entitles. In 1982, the Commission reevaluated LP&L's.
activities and concluded that there were no significant changes to warrant modification to the-antitrust conditions. Finding of No Significant Antitrust Changes, NRC Docket No. 50-382-A, Oct.
12, 1982. The conditions were repeated in LP&L's operating license issued by the Commission on March 16, 1985.
l The conditions are provided for the benefit of certain
" entities," which generally are defined to include entities that own, or propose in good faith to own, generation facilities; are or will be public utilities; and have physical interconnections with LP&L in Louisiana. License, App. C, para. 1. The antitrust
. conditions obligate LP&L, under certain conditions, to interconnect and share reserves, including the provision of emergency and scheduled maintenance service; sell unit power and deficiency power; grant participation in Waterford 3 and future nuclear generating units; transmit power and energy over its
, transmission facilities; and sell power and energy. Id., paras.
l 2 - 6.
l In its application, LP&L makes ostensibly contrary representations with respect to the application of these antitrust conditions. At page 15 of the application, LP&L states:
[T]he proposed license amendment to designate EOI as the entity authorized to possess, use and operate Waterford 3 will not alter the existing antitrust license conditions applicable to LP&L. Those conditions will remain anolicable to LP&L.
1/ Louisiana Power & Light Co., Application to Amend Facility Operating License No. NPF-38 (" Appl.") (Aug. 15, 1989).
I
- u. n-
- c. ,
. -(Emphasis added.) However, in the proposed " mark-up" of the license, LP&L changes the provision which now reads "The licensee
.shall comply with the antitrust conditions in' Appendix C to this l1 license," to."EQI shall comply with the antitrust conditions in L
Appendix C to this license." Attachment 2 at 3. (emphasis H
l_
added.)
- 2. New Orleans' Jurisdiction and Interest By virtue of Article 4, Section 21(C) of the Louisiana e Constitution and Section 4-1604 of the Home Rule Charter of the L City of~New Orleans, the New Orleans City Council is vested with L regulatory authority over the operations of LP&L conducted within the municipal boundaries of New Orleans. The Council is also vested with regulatory authority over the entirety of the operations.of New Orleans Public Service Inc. ("NOPSI"), another
. utility subsidiary of Entergy.
On August 18, 1989, LP&L filed an application with the Council for review of the proposed transfer of Waterford 3's operations to EOI. Subsequently, the Council issued a public notice announcing-its intent to hold a hearing with respect to the application following the parallel hearing of the Louisiana Public Service Commission-("LPSC") regarding the same matter.
The LPSC hearing is scheduled for December 5 and 6, 1989.
As a regulatory authority with jurisdiction in Louisiana, New Orleans has.aut interest in this proceeding to ensure that the p interconnection and transmission markets in Louisiana are not adversely affected by the disposition of the antitrust issues herein. The viability of those markets, in the Council's l
opinion,isenhancedbytheapplicationoftheaptitrust conditions in the Waterford 3 operating license.
1
- 3. Acolication of the Antitrust Conditions In light of the confusing representation in LP&L's application as to whether the antitrust conditions would continue to apply to LP&L, the Commission should provide clarification that LP&L will remain subject to the conditions. There is nothing in the record before the Commission that warrants or even suggests that LP&L should be relieved of these obligations and, indeed, LP&L does not dispute this conclusion. In its response to the inquiries of the Commission's staff, LP&L states that:
l 2/ As a result of ongoing negotiations with Entergy to purchase the electric facilities of NOPSI and LP&L existing within the City, New Orleans itself may become a participant in these markets. In that event, the application of the antitrust conditions would be vital to New Orleans because the City is entirely surrounded by LP&L's transmission system and has no direct access to other sources of power supply.
. LP&L will remain the owner of the unit and therefore'will remain licensed "to possess" Waterford 3. The antitrust conditions on the licensee will remain anolicable to LP&L.
Attachment to Letter of R.F. Burski to NRC,-Oct. 27, 1989, at.2 (emphasis added.) Continued application of the antitrust ;
conditions to LP&L would be consistant with the Commission's approval of an amendment to the Wolf Creek Generating Station license designating a new operating agent where the owner licensees remained subject to the original antitrust conditions.
333 Kansas Gas & Electric Co., Amendment to Facility Operating License, License No. NPF-42, Docket No. 50-482, Nov. 4, 1986.
Additionally,.the Commission should extend the antitrust
. conditions to EOI. LP&L, however, contests such extension, stating that "the amendments need not include new antitrust conditions applicable to EOI." Oct. 27 letter at 4. LP&L's position is supported by a legal opinion which concludes that "it is legally unnecessary to make EOI subject to the present antitrust conditions. . . " Attachment to letter of David A.
Repka to NRC, Oct. 30, 1989, at 2.
LP&L concedes, by implication, that the NRC could impose the antitrust. conditions on EOI and provides no affirmative reason as to why the Commission should n21 so impose those conditions on EOI. EOI would become the licensed operator of the plant; to the extent that EOI is able to commit antitrust violations, it should L be subject.to those conditions for the same reasons that L
compelled their original application to LP&L. The Commission may ensure that there is no diminution of the protections afforded the public in the existing antitrust conditions by simply directingthp'tEOIassume-thesameobligationsasitsaffiliated co-licensee.
LP&L does not expressly deny the possibility that EOI alone (in its proposed form as delineated in the operating agreement between EOI and LP&L) could cause non-compliance with the antitrust conditions. More important, perhaps, is the possibility that Entergy would empower EOI to take actions not l currently contemplated in the operating agreement. This possibility is suggested, in part, by the substantial corporate restructuring now underway on the Entergy system. Entergy is l attempting to consolidate its nuclear operations in EOI; it is I
also attempting to form an independent power producer ("IPP")
2/ In the Kansas Gas proceeding cited above, the question of whether the new Wolf Creek operating company should be subject to the antitrust obligations of the owner licensees apparently was not raised before the Commission. Thus, to the best of New Orleans' knowledge, the instant matter is one of first impression.
- .- - -= - .
1,. .
.- ~1
..
.: l subsidiary and " spin-off" existing system generating. facilities to that subsidiary; it has engaged in sale / leaseback arrangements with respect to its largest assets;1and it is contemplating I
' selling substantial electric assets and all of its gas assets to New Orleans. . Given-this dynamic condition, as well as the possibility of modifications to the operating agreement that-might occur beyond NRC oversight,-the. commission should act ,
. cautiously and apply the antitrust conditions to EOI in order to discourage possible-arrangements with EOI that might circumvent '
those conditions.
New Orleans requests that the following be served with copies of all future correspondence in this proceeding:
Clinton A. Vince, Esq.
Glen L. Ortman, Esq.
Paul E. Nordstrom, Esq.
L Verner,.Liipfert, Bernhard, D
McPherson & Hand, Chartered 901 15th Street, N.W.
Suite 700 H Washington, D.C. 20005-2301 (202)371-6000 Okla Jones II, Esq.
City Attorney ,
1 Michael W. Tifft, Esq.
l Deputy City Attorney L City Council Utilities Regulatory Office l Room 1E04A - City Hall 1300 Perdido Street New Orleans, Louisiana 70112 (504)586-3892 Respectfully submitted, Clinton A.
f dY ince i
Glen L. Ortman Paul E. Nordstrom l Attorneys for the City of New Orleans, Louisiana cc: Attached service list 1
,vi * -
l
\ *?
, .r .
, -e
[ Wh Malcolm Stevenson, Esq. Regional Administrator, Region IV Monroe &-Leman' H US Nuclear Regulatory Commission J 201-St. Charles Avenue Office'of Executive Director for Suite 3300- Operations c New Orleans, LA~70170-3300 611 Ryan Plaza Drive, Suite 1000
[ Arlington, Texas 76011-F ,
l l
i
? -Mr. E. Blake. Mr. William H. Spell, Admin. -i
-Shaw, Pittman, Potts Nuclear Energy Division .
I
& Trowbridge Office of Environmental Affairs 2300 N Street, N.W. P.O. Box 14690 f Washington, D.C. 20037 Baton Rouge, LA 70898
.1 l
Resident-Inspector / President,' Police Jury y H Waterford NPS St. Charles Parish- 1 Post Office Box 822 Hahnville, Louisiana 70057 1 l
Killona, Louisiana 70066 L !
L 1
Chairman William A. Cross Louisiana Public Service Bethesda Licensing Office Commission 3 Metro Center One American Place, Suite 1630 Suite 610 Baton Rouge, LA 70825-1697 Bethesda, Maryland 20814 l
Mr. R.F. Burski Nuclear Safety and Regulatory y Affairs Manager Louisiana Power & Light Company 317 Baronne Street New Orleans, Louisiana 70112 i
[-
1
-- _. -, _ _ _ , . . . . _ . . . - . . _ _ . . _ , ____________2