(,p WI gj Portland General Electric Company December 1, 1989 cTr:jan Nuclear Plant..
CPY-320-89 1
I
( 71760 Columbia River Hwy
< Rainier, Oregon ;7048 '
(,
(503) $56-3713 w
yc i
- U.fS.. Nuclear Regulatory Commission
' Document Control Desk Washington, D.C.,205f5 Gentlemen:-
I goecial Report.
' Limiting Condition for Operation (LCO) 3.7.9 o'f the 'Irojan Technical Specifications..(TTS)_ requires submittal of a Special M port if a L3-hour fire. barrier is nonfunctional for greater than seven days.
.-The. fire barriers in the areas described below were declared (inoperable on the dates. indicated and remained inoperable for greater sthan seven-days.
1.
FireJiampers numbered FD-308 and 7D-309 were determined to be A
. inoperable'.as-of May,2, 1989.
Damper FD-308 is located between
.the Control Building East Battery Room and the Control Building
. Electrical Switchgear. Room.
Damper FD-309 is located between the iControl'Suilding WestTBattery Room and the Control Building Electrical Auxiliary. Room,,
These dampe:v are scheduled to be
- r
- replaced by January-30, 1990.
L t
2'.
Fire'damperinumbered FD-311 was determined to be inoperable on rJuly:i3,-1989.- 'The damper is located between Corridor 48 and the-Cable Spreading Room.
This damper is scheduled-to be replaced by April 110,:1990.
- 3.
Fire ^ dampers numbered FD-93 and FD-97 were determined to be y
inoperable as of July 24, 1909.
These dampers are located between the. Mechanical Room and the "B" Electrical Switchgear
. Room.
These dempers are scheduled to be replaced by December-31,.1989.
24..
Fire damper numbered FD-380 was determined to be inoperable on
,d Octeber_12, 1989.
This= damper is located betwrien the Turbine
! Building.g3neral area and the "A" Diesel Generatcr Room.
This Ldamper!is scheduled to be replaced by Angust 1, 1990.
,e t
s-
> o Ib
F~
~
l
[ fU.f 8.* Nuc1Scr Rsgulatory Comaission i
L t%c;nbar l~,
1989 i
CPY-320-89.
R
,Th'e-compensatory measures of Technical Specification 3.7.9 (checking
- local smoke detectors and establishing an hourly fire patrol) were establishe$Jimmediately for:each' damper, as required.
These~ fire dampers were discovered to be inoperable during_the
- cvaluation of several Corrective Action Program Nonconformance Reports (NCR).
The NCR's were' generated as a result of concerns for
'the installation methods used for these dampers.
This_Special Report is being submitted late because the Nuclear Plant
' Engineering (NPE) personnel who determined the fire dampers were Linoperable. failed.to inform the Fire Protection Department of this conclusion.
Fite Protection personnel had originally determined the ifire-dampers to be operable, but had established fire patrols in case further evaluation reversed this conclusion.
The Corrective Action Program does not: have a: process' for informing appropriate personnel-if the initial conclusions of a NCR or Nonconforming Activity Report (NCAR) is different than the final disposition.
In order to avoid this type of situation in the future the NPE
' personnel,wilI1be directed to ensure they communicate their l
conclusion to_the appropriate personnel when.a NCR or NCAR is processed.
A corrective Action insk Group is presently formulating a
~ plan.of action to fix identified-problems with the Corrective Action Program.
They have been directed to ensure this issue is addressed.
of &/
C.P. Yunde General Manager Trojan Nuclear-Plant M.
1Y ~7 P
LCPY/NS/JWL/RQR/TRB:tw L
p
- c:
Mr.' David Stewart-Smith State of Oregon Department of Energy 2
y L
Mr. John B. Martin Regional Administrator US Nuclear Regulatory Commission e
li IMr. R.
C.
Barr u
USNRC Resident Inspector l
Trojan Nuclear Plant L