ML19332E325
| ML19332E325 | |
| Person / Time | |
|---|---|
| Site: | Neely Research Reactor |
| Issue date: | 11/22/1989 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Karam R Neely Research Reactor, ATLANTA, GA |
| Shared Package | |
| ML19332E326 | List: |
| References | |
| NUDOCS 8912070080 | |
| Download: ML19332E325 (3) | |
See also: IR 05000160/1989004
Text
,
-
v
.
g(&
h
s
NOV 2 2 ;gg
- -
.
,
..
L
l
Docket No. 50-160
'
License No. E-97
o
N
Georgia Institute of Technology.
,
ATTH:' Dr. Ratib A. Karam Director
Neely Nuclear Research Center
-225 North Avenue
'
Atlanta, GA 30332
>
Gentlemen:
~ SUBJECT: NRC INSPECTION REPORT NO. 50-160/89-04
.This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
' A. Gooden on = September 25-29, 1989.- The inspection included a review of
activities authorized for your Georgia Tech Research Reactor.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
' these areas, the inspection consisted of selective examinations of procedures
-and representative records, interviews with personnel
and observation of
activities in progress.
- Within 'the scope of the inspection, no violations or deviations were
identified.
Your attention is directed to the exercise weakness identified in Paragraph 2.
' Also, the enclosed inspection report documents an oral commitment (see
Paragraph-7) made by a licensee representative and discussed in the exit
interview.
If your understanding of this commitment differs from the report
' statements, please inform this office promptly.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
Title 10 Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely.
OniGNAL S!GNED BY
DOUGLAS M. COLLINS
Douglas M. Collins, Chief
Energency Preparedness and
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
(See page 2)
8912070080 891122
ii
ADOCK 05000160
\\
.O
3 of
p
0
'
[g-. .
'
.
"
.
,
' Georgia Institute of Technology
2
y,
4
..
Enclosure:
NRC Inspection Report
cc w/ enc 1:
a
.
Dr. A. P. Sheppard
g
.
' Acting.Vice President for Research
'
Georgia Institute of Technology
225' North Avenue
Atlanta, GA 30332
'
Dr. William Vernetson
Director of Nuclear Facilities
Department of Nuclear Engineering
Sciences
University of Florida
~202 Nuclear Sciences Center--
Gainesville, FL '32611
Garry D. Miller. Associate Director
Nuclear Reactor Program
,
North Carolina State University
Box 7909-
.Raleigh, NC 27695-7909
Dr. R. U. Mulder, Director
Reactor Facility
University of Virginia
Charlottesville. VA -22901
James G. Ledbetter. Commissioner
Department of Human Resources
47 Trinity Avenue-
(,
- Atlanta, GA 30334
j
w
~
Charles H. Badger
Office of Planning and Budget
Managament' Review Division
Room 608
l
270 Washington, Street. SW
' Atlanta, GA 30334
!
Mayor of the City of Atlanta
Atlanta. GA 30301
State of Georgia
bec w/ enc 1:
(Seepage 3)
a.
4<
.s
e
( , ,'
.
.
,
Georgia Institute of Technology
-3
l
,
t
.bec.w/ enc 1 -
'
,
Document Control Desk
A. Adams 'NRR
'R. Erickson, NRR
!
t
i
.
.l -
l
'
.
4
V
-
a
p
.
i
.
I
3
.
,
.
.
'I
.;
L
,
!
!
, ,
l
i
l
l
,
l
l'
1
-
,
.
!
!
1 .15k
5!
lt -
'<
RII:D,P)SS
R :DRSS
RII:03SS
. A, M-
Al
'AGooden
in
Mpine
11/6/89
11/g/89
11/\\A/89