ML19332D741
| ML19332D741 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 11/21/1989 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-89-146, TASK-***, TASK-OR GL-89-21, VPNPD-89-613, NUDOCS 8912050183 | |
| Download: ML19332D741 (3) | |
Text
_
YI 3:
9' Wisconsin Electnc 3
POWER COMPANY j.
231 w uchg:rt Po b 2046.mouice.wi 53201 (454)221-2345 VPNPD 613
+
l NRC-8 9-14 6 O
November - 2 3., 1989 I
V l
i I
Document Control Desk l
[-
U.S.-NUCLEAR REGULATORY COMMISSION Mai Station PI-137 Washington, D.C.
20555 Gentlement.
DOCKET NOS. 50-266 AND 50-301 INFORMATION CONCERNING RESOLUTION OF UNRESOLVED SAFETY. ISSUES RESPONSE TO GENERIC LETTER 89-21
., POINT. BEACH NUCLEAR PLANT Generic Letter 89-21 dated October 19, 1989, requested all
" licensees tcr report the status of. implementation of Unresolved Safety-Issues (USIs) for which a final technical resolution has been achieved and which are applicable to their facilities, i
Enclosures to that letter listed each of the USIs for which a technical resolution has been promulgated'and provided a brief summary of that resolution.
AttachmentEl~to this letter provides i
the implementation status for each of the USIs for the Point Beach Nuclear' Plant.- For completeness,:we have. listed each of the items included in:your summary and have utilized the codes suggested to
-indicate the applicability and status of resolution.
Please contact us.if you have any questions-concerning the infor-mation provided in this response.
Very truly yours, l
ifl v
C. W.
Fay Vice President Nuclear. Power 8912050183 891121 PDR ADOCK 05000266 P
PDC Mf I \\
d wbsWhyofIIinw&DngrDepvaMw
3
.p '
~
M.g o p.,:l- --
ATTACHMENT 1 STATUS OF IMPLEMENTATION OF-USI-POINT BEACH NUCLEAR PLANT.
l r
'USI.NO..
STATUS
- COMMENT l
- l 1..
A-1 NC i
.f
.2..
A-2 NC GDC-4. exemption request ~
l submitted 5/30/85.
NRC
- response 5/6/86.-
l o
I'
.32 A'-3 NC GL85-02 response submitted l
1 4
6/17/85
~
4.-
A-4 NA 1
q L 5. -., A-5 '
NA 1
6.1 A-6 NA l
i 7.
A-7 NA i
8.
-A-8:
NA-9.
A-9 C
Installation of AMSAC was complete for Unit 1 in 4/89 and-for Unit 2 in 11/89'
'I i
'10.
,A-10 NA t
[
11.
A-11 I
Submittal for PBNP from i
' B&W Owner Group Materials
-j
-Committee scheduled for December 1990.
- 12.
A-12 NC'
. i
- 13..- A E
, Internal flooding to.be incorporated into IPE.
Physical interaction due
- to seismic considerations l
under A-46.
.y.
i i
i
' *NA ='Not Applicable NC = Applicable, but no changes necessary LC -- = Changes are-complete
^
I? '= Resolution incomplete E
= Resolution under evaluation I
91, < <
s
- v M Y 3
+
.m-.
e--
~e-9 y
,c.
w--
-w-
-e=-
u-,
S(!S SW*t
?<-.
m g
3
- f -, ys 6
46*ii'-
14,
.A-24 C
NRC SER issued 8/30/84 Hardware-modifications per-4 M - 9.
letter of. August 9, 1988.
Anticipated completion y
1>
~
_ November 1990.-
i
- 15. :A-26 C-NRC SER-issued 5/20/80 I
LGL 88-ll response 11/29/88 l
'I l
h
- 16. 'A-31 NA i
I
' 17.
A-36 C-NRC.SER issued.9/3/85 1
18.
A NA-i n
- 19.
A-40 E
Resolution within'two I
^
4 years of NRC SER on i
Seismic Qualification ~
Owners Group-Generic
'~
Implementation Procedure
' 20.
A-42 NA 21.
A-43 NC i
~
e 22.
A-44 I
Hardware, procedures.
Resolution in 1991-subject-
[
to issue of NRC SER.
l 1/
l23. -A-45 NC Considerations to be I
incorporated into IPE 24.
A-46 E
Requirements and completion subject to-i receipt of NRC SER on i
4 Seismic Qualification
_0wne'r Group Generic I
Implementation Procedures 25.
A-47 ET Response scheduled 3/20/90
- 26.
A-48 NA
- 2 7.
- A-49
'C PTS submittals 1/20/86, 3/14/86, 11/29/88, and 8/3/89.
NRC SER 7/24/86.
s 5
t t
-. C.
[j ' '
3-t