9 it
- 6 f-jef ?
g, B ALTIMORE -
. 'a OAS AND -
- ELECTRIC -
t CHARLES CENTER *: P.O. BOX '1475 el BALTIMORE, MARYLAND 21203-1475 ~
(301)' 260-4600.
NUCLEAR ENGINEERING SERVICES DEPARTMENT
- CALVERT CUFFS NUCLEAR POWER PLANT --
LUS8Y. MARYLAND 70657 November 21,1989 '
E p;
i U. S. Nuclear Regulatory Commission -
Washi.igton, DC 20555 s
EATTENTION:
Document Control Desk
SUBJECT:
Calvert o Cliffs Nuclear Power Plant Unit Nos. 'l & 2; Docket Nos. 50-317 & 50-318 J
Technical Soecification Amendments Proposed Under Generic Letter 87-09
REFERENCES:
(a) Letter to Docmnent Control. Desk (NRC) from Mr. J. A. Tiernan I
- (BG&E),' dated November 1,1988,. Request for. Amendment (b) - Lbte i to - Documenti Control-Desk (NRC) from M r. G. C. Creel i
s (BG&E),': dated July 21,,1989,i Technical. Specification Amendments-Proposed Under. Generic Letter 87-09 Gentlemen:
k iReference (a) proposed changes to Technical Specifications 3.0.4, 4.0.3, and 4.0.4 as -
recommended in-NRC Generic > Letter 87-09.
Reference ~ (b). was ' a. response to a Request 4 for Additional Information from our NRR Project L Manager.. In that response, we indicated our preference' that the Technical
?
Specification 3.0.4 change be reviewed separately from those associated. with Technical Specification 4.0.3 and 4.0.4.
This letter forwards the proposed final Technical Specification and. Technical Specifica-i
?
- tion Bases. pages associated : with.the Technical Specifications 4.0.3 and 4.0.4 changes.
, The' Vpages reflect the marked-up, versions submitted in Reference - (a) except that a l
clarifying' phrase' : has been removed from the applicable wording in Technical
- Specification ' 4.0.3 so the words directly reflect. the generic letter guidance,- per a-
' request ' by' our NRR Project. Manager. The words removed are still in the Technical g
Specification Bases. Also, unchanged information from the bottom of page 3/4 0-2 was
- shifted, to 3/4 0-3, so that page is included, and a new page, B 3/4 0-5, now exists due to increased information.
4 p
D _lC P
1
,a
-l 5
Document C;ntrol Desk November 21,1989 Page 2 ~
r i
Should L you have any 1 further questions regarding ' this matter, we ~ will be pleased. to discuss them~. with you.'
Very truly yours, 9.Q. &
D. L. Shaw Engineer - Licensing
- t -
' i-DLS/ dim:
E
. Attachments cc:
D. A.' Drune, Esquire J. E.
Silberg; Esquire
' R. A.Capra, NRC
' S. A. McNeil, NRC W.:T. Russell, NRC J. E. Beall..NRC.
T. Magette, DNR 3
?
...