ML19332C984
From kanterella
Jump to navigation
Jump to search
ML19332C984 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 11/21/1989 |
From: | Alexion T Office of Nuclear Reactor Regulation |
To: | Office of Nuclear Reactor Regulation |
References | |
GL-88-16, GL-89-14, NUDOCS 8911290255 | |
Download: ML19332C984 (29) | |
Similar Documents at Callaway | |
---|---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20207G5151999-06-0808 June 1999
[Table view]Summary of 990422 Meeting with UE & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & UE Meeting Presentation Matls Encl ML20205J6591999-04-0606 April 1999 Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl ML20199G9871999-01-20020 January 1999 Summary of 981014 & 15 Meetings with WCNOC & UE Re Proposed TS Amend That Supports Mod to Increase Sfp.List of Attendees & Summary of Each Topic Discussed Encl ML20198M3111998-12-29029 December 1998 Summary of 981203 Meeting with Wolf Creek Nuclear Operating Co Re Amend Application Requesting Approval to Increase SFP Capacity at Wolf Creek & Callaway Plants.List of Attendees & Licensee Presentation Matl Encl ML20248H0551998-06-0101 June 1998 Summary of 980513 Meeting W/Utils Re Proposed Amends to TSs to Support Planned Mods to Spent Fuel Pools at Plants ML20217A0261998-03-18018 March 1998 Summary of 980129 Meeting W/Util to Discuss Licensee Interpretation of Allowance to Perform TS Required Shutdown Surveillance Testing While at Power.Oversize Drawings Encl ML20198H5661997-12-31031 December 1997 Summary of 971209 Meeting W/Union Electric & Framatome Technologies,Inc in Rockville,Md Re Electrosleeving Process in Support of Union Electric Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant ML20198G2211997-12-22022 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md,Re Electrosleeving Process in Support of UE-proposed TS Amend That Would Allow Electrosleeving of Steam Generator Tubes at Callaway Plant.List of Attendees Encl ML20199F2691997-11-19019 November 1997 Summary of 971008 & 09 Meetings W/Union Electric & Westinghouse Electric Corp to Discuss Effects of Axial Offset Anomaly Currently Being Experienced by Plant.List of Attendees & non-proprietary Versions of Handout Matls Encl ML20217E0411997-09-24024 September 1997 Summary of 970813 Meeting W/Une & Framatome Technologies Re Electrosleeving Process in Support of UNE-proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Meeting Handout Matl Encl ML20149G3231997-07-18018 July 1997 Summary of 970506 & 07 Meetings W/Listed Attendees in Toronto,Ontario,Canada to Discuss FTI SG Electrosleeving Process.Nonproprietary Version of Handout Matl Presented at Meeting Encl ML20149H2751997-07-17017 July 1997 Summary of 970513-15 Meeting W/Util in Lynchburg,Va Re Licensee Steam Generator Electrosleeving Process.Meeting Attendees & Meeting Slides Encl ML20147G8311997-03-27027 March 1997 Summary of 970220 Meeting W/Util Re June 1997 Operational Safeguards Response Evaluation at Plant ML20133P8681997-01-22022 January 1997 Summary of 970114 Meeting W/Util Re Future Plans for Core Reload Design Analysis for Plant.List of Attendees & Matls Used in Presentation Encl ML20059G5761994-01-12012 January 1994 Summary of 931209 Meeting W/Representatives of Util & Licensee Contractors to Discuss Planned Elimination of SG Hydraulic Snubbers at Plants.List of Attendees & Licensee Presentation Handout Encl ML20059F9021994-01-11011 January 1994 Summary of 931208 Meeting W/Representatives of Wcnoc,Une & Licensees Contractor to Discuss TS Changes Being Considered by Licensees.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20128F0731993-02-0808 February 1993 Summary of 921215 Meeting W/Util in Rockville,Md Re Deletion or Modification of Boron Dilution Mitigation Sys.List of Attendees & Viewgraphs Encl ML19332C9841989-11-21021 November 1989 Redistributed Summary of 891103 Meeting W/Util Re Cycle 5 Reload.Attendees List,Meeting Agenda & Supporting Documentation ML20246J7081989-07-12012 July 1989 Trip Rept of 890619-23 Visit to Plant & Training for Unescorted Site Access to Nonradiological & Radiological Areas.Training Completed by Passing Two Exams ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20235R2211989-02-23023 February 1989 Summary of 890214 Meeting W/Util & Westinghouse Re Licensee Reload Application.Licensee Proposed Tech Spec Changes Include Increased Peaking Factors,Positive Moderator Temp Coefficient & Increased Boron Concentration.Viewgraphs Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20151N4711988-04-13013 April 1988 Summary of 880407 Meeting W/Util & Westinghouse Re Reload for Cycle 4.Meeting Attendees & Nonproprietary Presentation Encl ML20148P5881988-04-0101 April 1988 Summary of 880316 Meeting W/Utils Re Containment Tendon Tech Specs for Facilities.Attendance List & Licensees Presentation Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236K8011987-11-0202 November 1987 Summary of 871023 Meeting W/Util Re Stuck Reactor Vessel Head Closure Bolts at Plant.Util Requested to Submit Analysis of Three Adjacent Bolts & Listed Commitments, Including Strict Leakage Limit on Vessel Flange ML20236A4901987-10-14014 October 1987 Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl.Record Copy ML20236A4861987-10-14014 October 1987 Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl ML20237L1111987-08-28028 August 1987 Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements Encl ML20213F8021987-05-0404 May 1987 Summary of 870429 Meeting W/Util & Westinghouse Re Reload for Cycle 3 & Power Uprating Amend Requests.List of Attendees & Viewgraphs Encl ML20212F2921986-12-30030 December 1986 Summary of Operating Reactors Events Meeting 86-45 on 861222 Re Events Which Occurred Since Last Meeting on 861215.List of Attendees & Significant Elements of Events Discussed Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20154K2171986-03-0505 March 1986 Summary of Allegation Review Board 860210 Meeting.Listed Actions to Close Allegations RIII-86-A-002,RIII-86-A-0007, RIII-86-A-011,RIII-85-A-0188,RIII-85-A-0208 & RIII-86-A-003 Agreed Upon ML20138J8441985-12-12012 December 1985 Summary of 851205 Meeting W/Util & Westinghouse Re 851115 Reload Submittal for Cycle 2.Non-LOCA Transient Analysis, LOCA Analysis,Tech Spec Changes & Radiological Consequences Discussed.Viewgraphs & List of Attendees Encl ML20136G9081985-11-15015 November 1985 Summary of 850522 Meeting W/Kansas Gas & Electric Co,Union Electric Co & Snupps in Bethesda,Md Re Snupps Spds.List of Attendees & Proposed Agenda Encl ML20138R6711985-11-0707 November 1985 Summary of 851105 Meeting W/Util & Snupps at Site Re Proposed Mods to Low Temp Overpressure Protection Sys. Attendee List & Slides Used During Presentation Encl ML20149B8651985-11-0404 November 1985 Summary of INPO Accreditation Board 851023-24 Meetings in Atlanta,Ga Re Training Programs for Listed Facilities, Performance Indicators,Nrc Exam Failure Rate & Instructor Qualifications ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl ML20127B5101984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed1984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed ML20027D7221982-10-29029 October 1982 Summary of 821019 Meeting W/Utils,Bechtel & Snupps in Bethesda,Md Re Applicants Approach to Fire Protection. Design Focuses on Separate Cable Spreading Rooms,Control Room Fire Area & Auxiliary Shutdown Panels ML20054J0301982-06-17017 June 1982 Summary of 820430 Meeting W/Utils & Bechtel in Bethesda,Md Re Alternate Shutdown Panel & Related Fire Protection ML20041D3131982-02-16016 February 1982 Summary of 820209 Meeting W/Utils,Snupps,Westinghouse & Bechtel Power Corp in Bethesda,Md Re Control Room Design ML20040F2241982-01-0909 January 1982 Certified Minutes of ACRS Subcommittee on Callaway Unit 1 811104-05 Public Meeting in Columbia,Mo Re Review of Util OL Application.Tentative Schedule Encl ML20039C2231981-12-10010 December 1981 Summary of 811109 Meeting W/Util Re Applicant Final Rept on Reactor Bldg Dome Concrete Imperfections ML20039B0391981-12-10010 December 1981 Summary of 811109 Meeting W/Util in Bethesda,Md Re Reactor Bldg Dome Concrete Imperfections ML20031A6611981-09-14014 September 1981 Summary of 810903 Meeting W/Utils,Snupps,Bechtel & Westinghouse in Gaithersburg,Md Re Initial Test Program.List of Attendees Encl.W/O Encl Agenda 1999-06-08 Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT) MONTHYEARML20207G5151999-06-0808 June 1999
[Table view]Summary of 990422 Meeting with UE & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & UE Meeting Presentation Matls Encl ML20205J6591999-04-0606 April 1999 Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl ML20199G9871999-01-20020 January 1999 Summary of 981014 & 15 Meetings with WCNOC & UE Re Proposed TS Amend That Supports Mod to Increase Sfp.List of Attendees & Summary of Each Topic Discussed Encl ML20198M3111998-12-29029 December 1998 Summary of 981203 Meeting with Wolf Creek Nuclear Operating Co Re Amend Application Requesting Approval to Increase SFP Capacity at Wolf Creek & Callaway Plants.List of Attendees & Licensee Presentation Matl Encl ML20248H0551998-06-0101 June 1998 Summary of 980513 Meeting W/Utils Re Proposed Amends to TSs to Support Planned Mods to Spent Fuel Pools at Plants ML20217A0261998-03-18018 March 1998 Summary of 980129 Meeting W/Util to Discuss Licensee Interpretation of Allowance to Perform TS Required Shutdown Surveillance Testing While at Power.Oversize Drawings Encl ML20198H5661997-12-31031 December 1997 Summary of 971209 Meeting W/Union Electric & Framatome Technologies,Inc in Rockville,Md Re Electrosleeving Process in Support of Union Electric Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant ML20198G2211997-12-22022 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md,Re Electrosleeving Process in Support of UE-proposed TS Amend That Would Allow Electrosleeving of Steam Generator Tubes at Callaway Plant.List of Attendees Encl ML20199F2691997-11-19019 November 1997 Summary of 971008 & 09 Meetings W/Union Electric & Westinghouse Electric Corp to Discuss Effects of Axial Offset Anomaly Currently Being Experienced by Plant.List of Attendees & non-proprietary Versions of Handout Matls Encl ML20217E0411997-09-24024 September 1997 Summary of 970813 Meeting W/Une & Framatome Technologies Re Electrosleeving Process in Support of UNE-proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Meeting Handout Matl Encl ML20149G3231997-07-18018 July 1997 Summary of 970506 & 07 Meetings W/Listed Attendees in Toronto,Ontario,Canada to Discuss FTI SG Electrosleeving Process.Nonproprietary Version of Handout Matl Presented at Meeting Encl ML20149H2751997-07-17017 July 1997 Summary of 970513-15 Meeting W/Util in Lynchburg,Va Re Licensee Steam Generator Electrosleeving Process.Meeting Attendees & Meeting Slides Encl ML20147G8311997-03-27027 March 1997 Summary of 970220 Meeting W/Util Re June 1997 Operational Safeguards Response Evaluation at Plant ML20133P8681997-01-22022 January 1997 Summary of 970114 Meeting W/Util Re Future Plans for Core Reload Design Analysis for Plant.List of Attendees & Matls Used in Presentation Encl ML20059G5761994-01-12012 January 1994 Summary of 931209 Meeting W/Representatives of Util & Licensee Contractors to Discuss Planned Elimination of SG Hydraulic Snubbers at Plants.List of Attendees & Licensee Presentation Handout Encl ML20059F9021994-01-11011 January 1994 Summary of 931208 Meeting W/Representatives of Wcnoc,Une & Licensees Contractor to Discuss TS Changes Being Considered by Licensees.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20128F0731993-02-0808 February 1993 Summary of 921215 Meeting W/Util in Rockville,Md Re Deletion or Modification of Boron Dilution Mitigation Sys.List of Attendees & Viewgraphs Encl ML19332C9841989-11-21021 November 1989 Redistributed Summary of 891103 Meeting W/Util Re Cycle 5 Reload.Attendees List,Meeting Agenda & Supporting Documentation ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20235R2211989-02-23023 February 1989 Summary of 890214 Meeting W/Util & Westinghouse Re Licensee Reload Application.Licensee Proposed Tech Spec Changes Include Increased Peaking Factors,Positive Moderator Temp Coefficient & Increased Boron Concentration.Viewgraphs Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20151N4711988-04-13013 April 1988 Summary of 880407 Meeting W/Util & Westinghouse Re Reload for Cycle 4.Meeting Attendees & Nonproprietary Presentation Encl ML20148P5881988-04-0101 April 1988 Summary of 880316 Meeting W/Utils Re Containment Tendon Tech Specs for Facilities.Attendance List & Licensees Presentation Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236K8011987-11-0202 November 1987 Summary of 871023 Meeting W/Util Re Stuck Reactor Vessel Head Closure Bolts at Plant.Util Requested to Submit Analysis of Three Adjacent Bolts & Listed Commitments, Including Strict Leakage Limit on Vessel Flange ML20236A4901987-10-14014 October 1987 Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl.Record Copy ML20236A4861987-10-14014 October 1987 Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl ML20237L1111987-08-28028 August 1987 Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements Encl ML20213F8021987-05-0404 May 1987 Summary of 870429 Meeting W/Util & Westinghouse Re Reload for Cycle 3 & Power Uprating Amend Requests.List of Attendees & Viewgraphs Encl ML20212F2921986-12-30030 December 1986 Summary of Operating Reactors Events Meeting 86-45 on 861222 Re Events Which Occurred Since Last Meeting on 861215.List of Attendees & Significant Elements of Events Discussed Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20154K2171986-03-0505 March 1986 Summary of Allegation Review Board 860210 Meeting.Listed Actions to Close Allegations RIII-86-A-002,RIII-86-A-0007, RIII-86-A-011,RIII-85-A-0188,RIII-85-A-0208 & RIII-86-A-003 Agreed Upon ML20138J8441985-12-12012 December 1985 Summary of 851205 Meeting W/Util & Westinghouse Re 851115 Reload Submittal for Cycle 2.Non-LOCA Transient Analysis, LOCA Analysis,Tech Spec Changes & Radiological Consequences Discussed.Viewgraphs & List of Attendees Encl ML20136G9081985-11-15015 November 1985 Summary of 850522 Meeting W/Kansas Gas & Electric Co,Union Electric Co & Snupps in Bethesda,Md Re Snupps Spds.List of Attendees & Proposed Agenda Encl ML20138R6711985-11-0707 November 1985 Summary of 851105 Meeting W/Util & Snupps at Site Re Proposed Mods to Low Temp Overpressure Protection Sys. Attendee List & Slides Used During Presentation Encl ML20149B8651985-11-0404 November 1985 Summary of INPO Accreditation Board 851023-24 Meetings in Atlanta,Ga Re Training Programs for Listed Facilities, Performance Indicators,Nrc Exam Failure Rate & Instructor Qualifications ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl ML20027D7221982-10-29029 October 1982 Summary of 821019 Meeting W/Utils,Bechtel & Snupps in Bethesda,Md Re Applicants Approach to Fire Protection. Design Focuses on Separate Cable Spreading Rooms,Control Room Fire Area & Auxiliary Shutdown Panels ML20054J0301982-06-17017 June 1982 Summary of 820430 Meeting W/Utils & Bechtel in Bethesda,Md Re Alternate Shutdown Panel & Related Fire Protection ML20041D3131982-02-16016 February 1982 Summary of 820209 Meeting W/Utils,Snupps,Westinghouse & Bechtel Power Corp in Bethesda,Md Re Control Room Design ML20040F2241982-01-0909 January 1982 Certified Minutes of ACRS Subcommittee on Callaway Unit 1 811104-05 Public Meeting in Columbia,Mo Re Review of Util OL Application.Tentative Schedule Encl ML20039B0391981-12-10010 December 1981 Summary of 811109 Meeting W/Util in Bethesda,Md Re Reactor Bldg Dome Concrete Imperfections ML20039C2231981-12-10010 December 1981 Summary of 811109 Meeting W/Util Re Applicant Final Rept on Reactor Bldg Dome Concrete Imperfections ML20031A6611981-09-14014 September 1981 Summary of 810903 Meeting W/Utils,Snupps,Bechtel & Westinghouse in Gaithersburg,Md Re Initial Test Program.List of Attendees Encl.W/O Encl Agenda ML20030C6071981-08-18018 August 1981 Summary of 810727 Meeting W/Utils,Snupps,Bechtel & Westinghouse in Gaithersburg,Md Re Instrumentation & Controls.List of Attendees & Agenda Encl ML20030C7621981-08-18018 August 1981 Summary of 810721 Meeting W/Utils,Snupps,Bechtel & Westinghouse in Gaithersburg,Md Re Reactor Sys.List of Attendees,Agenda & FSAR Sections Encl.Meeting Scheduled on 810812 to Review Chapter 15 of FSAR & TMI-related Issues ML20010C9031981-08-13013 August 1981 Summary of 810716 Design Review Meeting W/Utils,Snupps, Bechtel & Westinghouse in Gaithersburg,Md Re Electrical Power Sys.Power Sys Branch Draft Questions Encl 1999-06-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19332C984&oldid=4742270"