oib I
- 1. -.-
3-y ym j
4-r.
o
.} :. v. T j
a
'I co t.D C3 October 17, 1989 O U-696-1464 7
zh j!" -
Ofh2 Z rn Mr..R.
F. Fish, Chief-4 O Emergency Preparedness Section-U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 i
Walnut Creek, CA 94596 I
Subject:
Docket No. 70-734:
SNM-696; Addendum to." Group-3" Report dated December 21, 1988
)
I
References:
- 1) Asmussen, K.
E.,
letter no. 696-1318 to Mr.-
Robert D. Thomas,-" Request:for Release of Selected Laboratories to Unrestricted Use (Group 3)," dated December 21, 1988.
- 2) Cotten, P.
R..
" Confirmatory Survey of:
Facilities in-Buildings'2'and 9 / General-Atomics / San Diego, California," Final Report ORAU 89/F-98,' July ~1989.
Dear Mr. Fish:
3 In December 1988, General-Atomics-(GA) submitted its'finalD f
survey report in support of a ' requesti for. a - confirmatory -
survey of afgroup of laboratories in GA's: Building 2? (Ref~
v 1).
That group of science laboratories was referredEto as-
" Group 3."
Subsequent;to that request,1GA< requested that three additional laboratory rooms and-'an affected office'in Building 2 be added to " Group 3."
'The affected! office was included.because a trench had to.be dug in'itsifloor to
~
remove an underground drain line.
In support of:this'later-request,oGA. transmitted to your office, by FAX, a brieff description of'the areas to be added.and some-associated survey.information.
The' Group 3 areas, including.theiadded rooms and affected' office, were surveyed by the Oak Ridge-Associated Universities' EnvironmentalLSurvey'and~ Site' Assessment ~ Team-(ORAU) during'their visit'to GA's site-March 114-23,-1989.
~
ORAU'snfinal reportL(Ref. 2) documented.the results of-their. confirmatory survey of GA's." Group 3"_ laboratories, including the1 additional three laboratory rooms'(lab 315 i
and rooms-1 and-2 of-lab 309)1and the affected: office (room
'302).
As evidenced'by the information in-their report, ORAU concluded'that all the areas surveyed meet'the NRC /j//
j 8911290053 891017
>PDR-ADOCK. 07000734:
/
'C PDC 1 \\.
10955 JOHN JAY HOPKINS DRIVE, SAN DIEGO, CA 921211194 RO. DOX 85608, SAN.DIEGO, CA 92138-56C8 (619 455-3000
,w-.
s
3x<
' t 4
,i.
--2 (and' State of California) approved criteria for release to.
unrestricted use.
L ORAU's exit meeting,. held on March 23, 1989,.at'the-conclusion of-their confirmatory surveys of the Group-3 laboratories, was attended by Mr..B. Brock of.NRC Region _V t
and Mr. K. Wong of the State of California.
At that meeting,-GA agreed to. formally document and submit for the' record the results of the radiation and contamination surveys GA performed on the three added-laboratory rooms and the affected office. prior to ORAU's visit of March.14-23, 1989. -This report'was to be more' comprehensive and to
- i supersede the preliminary and abbreviated reports previously transmitted by FAX.
Accordingly,, enclosed are three. copies of such_a report in the form of an addendum (dated September 22, 1989) to GA's " Group 3" report of December 21, 1988.
i If you should-have any questions regarding this supplemental information, please contact me at.(619)'455-l 2823.
Very truly yours, cae e A=_.~
Keith-E.~Asmussen, Manager.
Licensing,-Safety and Nuclear Compliance-Enclosure-(3 copies):
Report entitled, " Decontamination of Selected General Atomics' Science Laboratories For Release to Unrestricted Use I Addendum to " Group 3" Report Dated December 21,1988 (This Report Adds Lab 315 and Rooms 1 and 2 of Lab 309)," dated September 22, 1989 cc:
Ms. Mary Horn, NRC Headquarters P
i e
f
+
.w w
.e.-
w -
en m.s a
m-em
.se*
ua-
- -