ML19332C552
| ML19332C552 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/16/1989 |
| From: | Burdick T, Reidinger T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19332C533 | List: |
| References | |
| 50-456-OL-89-03, 50-456-OL-89-3, NUDOCS 8911280258 | |
| Download: ML19332C552 (3) | |
Text
p w
p:,7,y -
I
- p w;
x U.S. NUCLEAR REGULATORY'C0lWISSION REGION III iReport No. 50-456/0L-89-03 Docket No. 50-456 License No. NPF-72
. Licensee: -Commonwealth Edison Company Post Office Box 767-Chicago,-IL 60690 Facility Name: Braidwood Station Examination Administered At:
Braidwood Station and PTC Simulator Examination Conducted: November 3, 1989 Chief Examiner: [
t
/k T. Reidinger v
Date Approved By:.
[d"
-8////J7
-T. Burdick Date/
Examination Summary-Examination administered on November 3, 1989--(Report No. 50-456/0L-89-03)).
Consisted of an job performance measure examination _ administered to one retake
. senior reactor operator-l-
Results:
One senior reactor operator passed the examination.
3 i
l l
8911280258 891117 1
PDR ADOCK 05000456 1:
V-PDC
?N
i -
- c. jg-y 3 0
7,..:
REPORT DETAILS
- 1.
Examiner
'T.-Reidinger-2.
' Exit Meeting ~
-No. generic weakness or concerns were' observed on the.walkth' rough examination.
3.;
Exit Keeting-R. Querio, Plant Manager D.'0'Brien, Technical. Superintendent K. Shembarger, Region III' examiner G. Yanderheyden,' Plant Training Manager-1 R. Warner, PNL-examiner L. Rhoden, CECO Instructor-
'D. Cooper, Tech Staff. Supervisor D. Miller, Tech-Staff D.JHuston, Ceco Training =
' i
p{m,{ 3;g.
- I 7
SIMULATION FACILITY REPORT
~
Faci 11ty Licensee: Braidwood Facility Licensee Docket llo. 50-456 Operating-Tests-Administered At:.Braidwood and:PTC Simulator During the conduct of the simulator portion of the operating tests, the-
- following items were observed (if none, so state)
- .
ITEML DESCRIPTION None i
4
.p k
I l
~
l i