Notice of Violation from Insp on 891016-20.Violation Noted: Condensate Demineralizer Was Backwashed to Settling Pond W/O Being Sampled & Analyzed
ML19332C186
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/14/1989
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19332C183 List:
References
50-346-89-23, NUDOCS 8911220408
Download: ML19332C186 (1)


Text

L NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 As a result of the inspection conducted during the period October 16-20, 1989, and in accordance with the " General Statement of Policy and Procedure for NRC Enforcement-Actions," 10 CFR Part 2, Appendix C, (1989) (Enforcement Policy) the following violation was identified:

1.

Technical Specification 4.11.1.1.1 requires that radioactive liquid wastes be sampled and analyzed in accordance with Table 4.11.1.

fable 4.11.1 specifies that each batch of condensate demineralizer backwash be sampled and analyzed.

Contrary to the above, on September 17, 1989, a condensate demineralizer was backwashed to the settling pond without being sampled and analyzed.

This is a-Severity Level IV violation (Supplement IV).

2.

10 CFR 50.73(a)(2)(1)(B) requires that a Licensee Event Report (LER) be written for any operation or condition prohibited by-the plant's technical specifications.

Contrary to the above, no LER was written for a September 17, 1989, violation of Technical Specification 4.11.1.1.1 where a condensate polishing demineralizer was backwashed to the settling basin without the contents having been sampled and analyzed.

This is a Severity Level IV violation (Supplement I).

Pursuar.t to the provisions of 10 CFR 2.201, you are required to submit to this-office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:

(1) the corrective steps that have been taken and the results achieved;-(2) the corrective steps that will be taken to avoid further violations; and (3) the date when full complia,ce will be achieved. Consideration may be given to extending your response time for good cause shown.

Alav / f OS) lbW$$l Dated L. Robert Greger,/ Chief Reactor Programs Branch 8911220408 891114 PDR ADOCK 05000346 Q